Select Currency
Translate this page

IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 85  |  7098 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

CHAPTER ONE 

INTRODUCTION 

1.1   BACKGROUND TO THE STUDY

The Nigerian building and construction industry continue to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2012). The contribution of the building and construction industry to national economic growth necessitates improved efficiency in the industry by means of cost effectiveness and timeliness, and would certainly contribute to cost savings for the country as a whole. It is also common knowledge that the implementation of the construction project in the industry is usually accompanied with poor quality delivery and delivery time delay and cost increase as well as owner dissatisfaction (Hafez, 2011). Thus, the efficient use and management of material have an importance influence on a company's profit and can delay project construction (Abdul­ Rahman and Alidrisyi, 2013). The researchers will examine the impact of material management on project delivery in Nigeria. Material management is a planned procedure that include, the purchasing, delivery, handling and minimization of waste with the aim of ensuring that requirement is met (Illingworth and Thain, 2014).

According to Culvert (2014), a detailed material schedule and co-ordination of the requisition and order of material are important in assuring material availability. Efficient material planning is a key to high productivity on site. Material planning embraces quantifying, ordering and scheduling-. Productivity will suffer if the material planning process is not executed properly (Kaming, Olomolaiye, Holt and Harris, 2017). Kwik (2014) stated that another issue (which is sometime beyond management control) is material shortages, for example yearly cement shortages have long been a topic of debate within the construction industry. Bell and Stukhart (2017) investigated a total concept for a Material Management System (MMS), which combined and integrated the take-off, vendor evaluation, purchasing expediting, and warehousing and distribution functions of material. The system resulted in improved labour productivity, reduced material surplus, reduced material management, manpower and cost saving.

A1-Jibouri (2012) described a computer simulation model, which helps to solve the problem of order and deliveries of materials in real life by keeping a predetermined list of order and delivery time of all the materials on site. The delivery of each kind of material then takes place automatically at the specified time. Ineffective materials management for projects can result in significant cost blow-outs and delays in project completion. Such cost inefficiencies will negatively impact global competitiveness, and owner operators and engineering, procurement, and construction companies are trying to streamline work processes for their projects. Inaccurate materials information, such as incorrect bills of materials, inaccurate cycle counts, shipping errors, receiving errors and so on, will also affect the overall project life cycle and increase project costs. Having to deal with subcontractors outside of the materials management process impacts the overall project supply chain as there is an increased risk of data inconsistencies. Material management is the system for planning and controlling to ensure that the right quality and quantity of materials and equipment are specified in a timely manner. Materials should be obtained at a reasonable cost, and be available for use when needed. The cost of materials represents a large proportion of the cost. A good management system for materials management will lead to benefits for construction.

Cash flow has become crucial for the survival of any business, if materials are purchased early, capital may be tied up and interest charges incurred on the excess inventory of material. Material may deteriorate during storage or be stolen; also delays and extra expense may be incurred if materials required for particular activities are not available. Despite the importance of the materials, very little research has been directed towards understanding the management of materials from order to production; most research is focused upon the management of the design and procurement process and on labour site productivity. Materials management, which includes procurement, shop fabrication, logistics, supply chain management, production on site, and field servicing, requires special attention to achieve cost reduction. The supply chain is a convenient term used to describe a complex web of activities. The use of new equipment and innovative methods of materials handling has influenced changes in construction technologies in recent years. Modern methods of material management have been embraced by the manufacturers across a wide range of industry sectors outside of construction. 

1.2   STATEMENT OF THE PROBLEM 

Ogunlana and Proukumtong (2016) studied construction delays in a fast growing economy: comparing Thailand with Nigeria and some of the construction delays were attributed to material management: the study blames material shortage on site on unreliable supply from material suppliers occasioned by the general shortage in the industry, although there were specific instances in which poor communication between sites and head office purchasing, planning and co-ordination could be cited. However, much research has not be done on material management and project delivery in Nigeria considering the economic situation of Nigeria and the market full of substandard products. This study will therefore examine the impact of material management of project delivery in Nigeria in terms of quality and time. 

1.3   OBJECTIVES OF THE STUDY

The following are the objectives of this study: 

1.  To examine the impact of material management on project delivery time in Nigeria. 

2.  To examine the impact of material management on project quality upon delivery in Nigeria. 

3.  To determine the advantages and disadvantages of material management in project construction.

1.4   RESEARCH QUESTIONS 

1.  What is the impact of material management on project delivery time in Nigeria? 

2.  What is the impact of material management on project quality upon delivery in Nigeria? 

3.  What are the advantages and disadvantages of material management in project construction in Nigeria? 

1.5   RESEARCH HYPOTHESIS 

Ho: Material management does not affect project delivery in Nigeria 

Hi: Material management does affect project delivery in Nigeria     

1.6   SIGNIFICANCE OF THE STUDY 

This study will be of importance to building professionals and the general public because it would not only clarify but also create awareness of the extent to which inadequacies in material management can adversely affect project delivery. The study will also help contractors, clients, consultants and all parties involved in construction projects about ways of improving their current method of material management. This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic. 

1.7   SCOPE/LIMITATIONS OF THE STUDY 

The scope of this study on impact of material management on project delivery in Nigeria will cover all the project construction in Nigeria looking at their level of adoption of material management approach considering their successes with respect to project delivery quality and time. 

LIMITATION OF STUDY 

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

  DOWNLOAD THE FULL PROJECT

IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!