Select Currency
Translate this page

AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME

Format: MS WORD  |  Chapter: 1-5  |  Pages: 65  |  2953 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME

 

Abstract
The study focused on the provision of infrastructure in public private partnership housing scheme by estate developers in Abuja. Cases of no and poor infrastructure have been reported by residents in estates under this scheme. Adequate infrastructure plays an important role to the wellbeing of individuals in any society hence the need for this study. The research administered 63 questionnaires to private estate developers randomly in order to assess the factors affecting the provision of infrastructure in public private partnership housing scheme. A sample size of 56 estates was selected to ascertain the compliance of private estate developers in the provision of infrastructure, a checklist was used for this purpose. From the research findings, the inability of government to provide primary infrastructure to districts, insufficient finance and high interests on loan ranked as the high significant factors affecting the provision of infrastructure. Early provision of primary infrastructure by government, availability of funds to provide infrastructure in estates, low interest on loans, provision of subsidies on materials by government and availability of long term loans ranked as the high significant practices that would enhance the provision of infrastructure  in  housing estates under the public private  partnership  arrangement.

From the estates visited, there is poor provision of sewer lines (0%), water supply (10.94%), shopping facility (14.6%) and recreational parks (29.2%). From the findings, it was concluded that government’s inability to provide primary infrastructure in districts is the most significant factor affecting the provision of infrastructure, while early provision of infrastructure in districts by government and availability of loans and subsidies for developers are practices that would enhance the provision of infrastructures in PPP housing scheme. The research recommends active participation from the government in the provision of primary infrastructure, the provision of soft loans and subsidies for private estate developers.

CHAPTER 1
INTRODUCTION
1.1         Background to the Study
Housing has been viewed as the process of delivering a large number of residential buildings on a permanent basis, with sufficient physical infrastructure and social amenities, in planned, decent, safe and sanitary neighborhoods (The Federal Ministry of Works and Housing, 2002; Ibrahim and Mbamali, 2013). Rapid growth in population creates high demand towards shelter and efficient supply and distribution of basic utilities and services for city dwellers (Bala and Bustani, 2009). In most urban centers, the problem of housing is not only restricted to quantity but to the poor quality of available housing units (Ajayi and Omole, 2012). According to Coker et al., (2007), a satisfactory home is one in a suitable living environment with portable water, adequate shelter and other services and facilities. The housing condition of a country is a pointer to the health motivation, economic well-being and the social circumstances of her citizens. Housing affects the life of an individual as it provides the space for protection, privacy, economic activities, recreation and livelihood (Ajayi and Omole, 2012).
The introduction of Public Private Partnership in housing in Nigeria started in the early 1990s with the introduction of National Housing Policy (NHP) (Ademuyi, 2010). According to

Ukwayi et al., (2012), the poor performance of the National Housing Policy in meeting its set goals and objectives led to a comprehensive review. A new approach to the partnership between the government and private sector in providing housing and infrastructure was initiated in the year 2000 (National Technical Working Group on Housing, 2009). According to Ukoje and Kanu, (2014) the partnership between the Federal Capital Territory.

 

  DOWNLOAD THE COMPLETE PROJECT

AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!