Select Currency
Translate this page

ROAD DETERIORATION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 52  |  1800 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ABSTRACT

This project report is a study carried out to determine the causes and remedies to road deterioration. A case study of Naze Junction to Futo Gate Road, this study talks about the existence and development of tacks, researches made to discover the causes and remedies of road deterioration, the road structure/road maintenances. This project covers the methods used to determine the cause of the road deterioration by conducting, soil test and traffic census. It includes the pictures of the deteriorated spots of the road. The result of the test done and their general analysis. It covers also the conclusion of the study causes, based on the literature search and results of experiments and finally the recommendation of the study.

 

CHAPTER ONE

INTRODUCTION 

1.1 BACKGROUND OF STUDY

The importance of highways for the prosperity of any country cannot be over emphasized. The development of roads starts a chain reaction of atomic nature. It opens up new avenues or increases employment in the agriculture, industry, commerce health and sanitation sector by inherent virtue of being a communication and transport link between the developed areas. The road, so necessary an instrument of social well being that in every new country it is one of the first things that is being thought of. The great essence or need for roads came about due to the invention of the wheel, some 5,000 years ago. The increasing rate of highway deterioration has become a source of great concern to both the Engineers and the people using it. There is a great need to ascertain the various causes of the deterioratory state of our roads. And some of the ways to ascertain the causes of deterioration is to carryout trial bore hole,site investigation, and also traffic census.

The major reason for unsatisfactory state of road construction in Nigeria, is the low priority given to road development and maintenance, also responsible, is the lack of concern for human life and proper qualification and experience to do a particular job. The construction of roads, require expert’s in the field, so that the road will be able to carryout its basic function effectively, and survive its life expectancy of years. This is in order to avoid the premature failure of our roads, which is an existing fact currently in Imo State, particularly on the road leading from Naze Junction to Futo Gate which forms the basis of this project. There is not just one type of road failure, so the issue of the premature deterioration of our roads requires finance, and experienced knowledge.

1.2 AREA OF STUDY

The road leading from Naze Junction to Futo Gate is located in Owerri, the capital of Imo State. The road was constructed in the year 1977/1978, by Mezu construction company during the honourable regime of Late Dr. Sam Onunaka Mbakwe the, then executive governor of Imo State. The road leading from Naze Junction to Futo Gate is a ring road, provided to enable the free flow of traffic. It has a total length of about 6.00km, and has a lane width of about 7.3m. The road was constructed of Asphaltic Surfacing. It is a Surface dressed flexible pavement of single carriage way which has no shoulder. The routine maintenance work is been handled by the office of the Ministry of Works, housing and transport Owerri and currently the maintenance work has been awarded to Hardel and Erice construction company, a company owned by Chief Iwuanyanwu.

1.3 STATEMENT OF PROBLEM

The road leading from Naze Junction to Futo Gate has lost its original shape and design. It has deteriorated to the state that the Asphaltic Surfacing of some parts of the roads have gone off. This state of deterioration is a problem because, it does not effectively serve one of the purposes of construction which is to convey people and goods effectively. Due to its deterioratory state, when rain falls it is difficult for people and cars to ply the road because of it’s bad nature, this results in the breaking down of vehicles in the middle of the road and rendering the occupants of the vehicles helpless, and this broken down vehicles in turn, causes traffic congestions.
If this road is not properly reconstructed and maintained properly so many lives would be lost and goods would be wasted. And the area will be totally inaccessible.

1.4 AIMS AND OBJECTIVES

The following are the objectives of this study: 

1. To evaluate the cause of the deterioration of the road leading from Naze Junction to Futo Gate.

2. To uncover the pains which the people of this area are subjected to as a result of the deplorable condition of the road.

3. To find and comment on the economic importance of the Naze Futo Gate road to its people and the people of Imo State.

4. To proffer solution which will be suitable enough to remedy this road from deteriorating.

5. Finally to suggest measures to help minimize or stop the occurrence of the deterioration of our Nigerian roads.

1.5 SCOPE AND LIMITATION 

There are so many ways of determining the cause of road deterioration and they include, soil test, drainage designing, CBR test, compaction, traffic count, test on the various layer of the road structure, Atterberg limit etc. But due to the circumstances surrounding this study and my inability and unavailability of machines/equipments to carryout some of this test. This project is only limited to the determining of only the soil test, Atterberg limit, and traffic count of the road.

1.6 SIGNIFICANCE

The significance of this project include: . To prepare a paper that will serve as an academic tool, to help students handle related projects in future with confidence.. To state its value to the inhabitants of the Naze Junction to Futo Gate Road, as it will in no small measure help to alleviate transport and traffic problems currently being experienced by its people, and users.

1.7 DEFINITIONS OF TERMS

1. CARRIAGE WAY: It is the portion of the road designed and constructed for vehicular traffic.

2. DETERIORATION: It is a gradual process whereby a structure losses its initial quality or value due to age or defective construction. If not given attention from time to time.

3. HIGHWAY: In a road system the important road like national highway and provincial highways are called highways.

4. PREMATURE FAILURE: This is said to occur when the material what ever it is, i.e wearing course, surface dressing or structural concrete etc, has failed before its predicted design life has expired.

5. ROAD: It is defined as a convenient way over which vehicles and all sots of traffic can law fully move. 

6. RING ROAD: It is a road constructed around an Urban Area to enable free flow of traffic.

7. SHOULDER: It is the portion immediately beyond the edges of a carriage way on which vehicular traffic may pass occasionally.

8. SUB-GRADE: This is the top surface of a road bed on which the pavement structure and shoulders including Kerbs are constructed.

9. TRAFFIC CENSUS: This is the determination of the Average Daily Volume (ADV) of vehicular traffic that uses a road hourly, in order to determine the total volume of traffic anticipated during the design life of the pavement/road.

  DOWNLOAD THE COMPLETE PROJECT

ROAD DETERIORATION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ROAD DETERIORATION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ROAD DETERIORATION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ROAD DETERIORATION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ROAD DETERIORATION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!