Select Currency
Translate this page

INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 74  |  3824 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION

 

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF THE STUDY

The septic tank system is the most widely used onsite treatment system for domestic wastewater. In fact, most developing countries (Nigeria inclusive) lack the technology and economic power to construct and operate sewerage systems for conveyance of domestic wastewater to central sewage treatment facilities, so a greater population rely on the septic tank system for sewage treatment. It is an enclosed receptacle designed to collect wastewater, segregate settleable and floatable solids (sludge and scum), accumulate, consolidate and store solids, digest organic matter and discharge treated effluent (Bounds, 1997).  In the United States only, over 50 million people use the septic system (Collick et al., 2006).  According to Fidelia (2004, in Burubai et al., 2007), over 46% of the Nigerian population use the septic tank system.  The septic tank system was once thought to be a temporary solution to domestic wastewater treatment and disposal.  This was true until 1997 when the United States Environmental Protection Agency and Congress officially recognized the system as a sustainable, long-term solution for treating wastewater.

The septic tank is an anaerobic reactor due to the insufficiency of oxygen concentration to act as electron acceptor.  The wastewater is degraded by micro-organisms aerobically while the C, CO2 SO4 act as electron acceptors to form CO2, H2, CH4 and S2- (sulphides).  At the same time, most of the organic N is converted to NH+4 (inorganic). The effluent flows into the drain field where aerobic degradation occurs due to abundance of oxygen in the unsaturated soil layer.  The C in the wastewater is now oxidized to CO2 while NH4+ is oxidized to NO2- thus raising the nitrate level of the sewage to about seven times the limit acceptable for dumping water (10mg/l).  The H+ released from the oxidation of NH4+ now reduces the pH of the effluent.

A properly functioning septic tank system should be able to reduce the pollutional level of wastewater to such a level as is within local and international standards for wastewater disposal.  The septic tank system consists of a water tight tank for removal of solids and partial digestion of organic matter, and a drain field which is a secondary treatment system. The tank is an anaerobic system while the drain field is mostly aerobic which further treats the effluent before channeling it to the groundwater.  In some cases, the drain field could be a gravity type or a dosing type.

All things being equal, the septic tank system does not pose much problem and requires little maintenance.  However, when the system is not working properly, it merely serves as a route for recycling pathogens and deadly chemicals through the ecosystem.  According to Cogger (1988), nearly 40% of groundwater attributed disease outbreaks can be traced to the failure of onsite disposal systems.  Weissman et al. (1976), Bidgman et al. (1995) and Taylor et al. (1981) among others, reported cases of disease outbreak resulting from groundwater contamination due to septic tank failure.  In Africa where most people depend on streams, shallow wells and boreholes, the case is even more severe.

1.2    STATEMENT OF PROBLEM

If wastewater flowing into the septic tank does not receive adequate treatment, it is simply passed on to the groundwater unnoticed thus wreaking havoc on public health. Researchers have shown that most septic tanks especially in developing countries do not even attain an average performance throughout their lifetime. The result is that most septic tanks only act as a conduit for conveying raw / under treated sewage into the soil leading to massive fouling of our groundwater. And because the groundwater is the main source of potable water in most communities, man constantly stands the risk of water borne and water related diseases. Most times, the groundwater is used without treatment on the common assumption that it is “always clean”. The menace of such diseases as typhoid fever, diarrhea, giardiasis, gastroenteritis, hepatitis, methemoglobinamia, samonellosis, dysentery, etc will continue to plague humanity until a systematic approach to the design, construction and maintenance of the septic tank system is adopted.

The foregoing indicates that the septic tank system requires proper design, construction, use and maintenance. The cardinal aspect of septic tank maintenance which is of interest in this research is desludging. The absence of a deterministic equation for the prediction of desludging interval has usually led to too frequent desludging or excessive accumulation of sludge in the septic tank. Too frequent desludging increases cost of operation while excessive accumulation of sludge drastically reduces the efficiency of the septic tanks. The problem at the heart of this research is to develop a systematic and rational approach to the design of septic tanks and also to provide suitable guidelines for the maintenance of the septic tank system in order to ensure the protection of public and environmental health as well as enhance anaerobic processes.

1.3       OBJECTIVES OF THE STUDY

Most of the existing methods of septic tank design are not based on extensive scientific research and have so far proved inadequate.  Most times what is referred to as design is mere lumped sizing instead of systematic and rational design. Therefore, the main objective of this research is the investigation of anaerobic processes in septic tank as a wastewater treatment option via developing a systematic approach for the design and maintenance of septic tanks for better health outcomes.

Hence, the specific objectives of this research are:

(i)  To derive a model to predict the rate of sludge accumulation in septic tanks;

(ii)  To calibrate the model using field data; 

(iii)  To predict the desludging interval of septic tanks by relating sludge accumulation to reduction in detention time;

(iv)  To compare the sludge accumulation model to existing models.

1.4      SCOPE OF WORK

 

The core of this research shall concentrate on only the septic tank and not any of its secondary complements such as the soil absorption field, mound system, wetland, waste stabilization pond, etc. The reason is that, under normal circumstances, the tank itself is the limiting factor of performance in the septic tank system. Because most homes in developing and even developed countries still use the conventional septic tanks, this study will not extend to modified septic tanks. However, some of these systems will be highlighted during literature review for the sake of completeness.

1.5      JUSTIFICATION OF THE STUDY

The septic tank is pivotal to public health and yet one of the most overlooked and least maintained waste treatment facilities. Research has shown that most outbreaks of water borne epidemics result from fecal contamination. In most developing countries, people are not aware of the crucial role of the septic tank as they merely view it as a sewage pit that needs no special design, construction and maintenance considerations. The result is the ubiquity of malfunctioning septic tanks. This is why this subject deserves a serious intellectual attention.

1.6       LIMITATIONS OF THE STUDY

Several researches conducted on the septic tank system have shown that sewage is very difficult to work with. Characteristics of sewage vary from place to place and from septic tank to septic tank depending on the activities of users. Sewage is very inhomogeneous, consisting of a liquid phase, settled and partly settled solids, scum, dissolved solids such that it is difficult to obtain a representative sample (Heinss et al., 1999).

  DOWNLOAD THE COMPLETE PROJECT

INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for INVESTIGATION OF ANAEROBIC PROCESSES IN SEPTIC TANK AS A WASTEWATER TREATMENT OPTION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!