Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM.

Format: MS WORD  |  Chapter: 1-5  |  Pages: 80  |  1072 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM.

 

ABSTRACT

This research project tries to review the cost accounting system of KRISTAL SILENT, which of course is a manual processing system by a systematic analysis and recording of vertical transactions in respect of labour, material and expenses, the collation and interpretation of these need to disclose costs of particular products or services and the application of this vertical information for the purpose of efficient running of the business. The accompanying software, computerized cost accounting system is a package developed with the aim of computerizing all cost activities for the said company.  The program is in modules, which describes project activities, and information that is related to it. It provides the user the ability to federate analysis of project execution cost on monthly, quarterly and on yearly basis with its respective business forecast.

 

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF STUDY

The nature and development of an economy establishes the basic requirements for accounting. The emphasis to cost accounting for instance has been directed towards meeting the practical needs of manufacturing industries. The rapid growth and expansion of service industries now demand that accountants direct their attention to solving a new set of problems that are in many industries not related to manufacturing. The accountant is faced with the problem of adapting and combining the present accounting techniques into modern and flexible systems for the service industries.

The task of accounting for manufacturing costs and expenses obviously requires a further expansion of the preceding system. The form that this expansion takes depends on many factors such as the kinds of control, which is desired to exercise over manufacturing activities, the nature of the manufacturing activities themselves, and the relationship, which is to be mentioned between financial and cost records. From the above, it is clear that even though the presentation of cost accounts, for various types of business may vary, i.e is normal to follow the following procedures:

(a)  All expenditure is analysed and classified into direct and costs. The direct costs can be attributed to a particular job process on operation and they are transferred to it. (b) The indirect costs are placed to the relevant account. If they can be placed to one particular account such as factory overhead becomes allocation of overhead. But if they make to be divided between different overhead accounts is called apportionment of overhead.

ORGANIZATION OF WORK

This work is divided into six chapters. Chapter one has to do with introducing the project topic, statement of the problem, purpose of study, aims and objectives, scope, limitations and definition of terms. Chapter two is the review of related literature Chapter three has to do with finding out how the current system works and what the new system must do. Chapter four This phase of the system project spelt out how to build the new system, including the input/output design, file design, the procedure as well as the system requirements. Chapter five is documentation Chapter six is about recommendation and conclusion.

1.2    STATEMENT OF PROBLEM

In drawing up a scheme of costing, one of the first steps much be decided upon the cost centers, which are to be used. Following this, these overheads, which can be allotted, can be transferred to the relevant sections. The others must be apportioned between the relevant departments. The methods of apportionment will vary but care is needed to select the finest and concernment method in the circumstances. In this project work, we are narrowing down to the cost accounting system as has been practiced by KRISTAL SILENT, which of course is done manually. The land of cost accounting in the organization is the historical cost accounting system. Hence the system to be developed will take care of some of those anomalies that pose constraints to the system. Therefore the research goes on to ask such question as what are the likely benefits to be gained from this project study?

1.3    PURPOSE OF STUDY

The purpose of this study is trying to figure out the difficulties and irregularities encountered by KRISTAL SILENT in its existing system. The research amongst other things introduces standard that show the cost of production of every unit, job, and process operation or department by close analysis of expenditure. To indicate to management any inefficiencies and waste which are thereby revealed. To serve as a guide to price fixing. To provide comparative statement of costs in which the cost of the current period are compared with the costs of a previous period; or more helpfully, with the budgeted costs; and financially to take action in respect of significant variations of the costs from the budgeted figures and thus to control cost.

1.4    AIMS AND OBJECTIVES     

The aims and objectives of this project is to redesign and computerized the manual system of cost accounting as being practiced in KRISTAL SILENT. The computerized system amongst other things.

. Ease the burden of calculating and recalculating of figures to get at the exact output.

. Automatic report generation and report of the financial status of the firm.

. Automatic posting of accounts from the individual ledgers to the general ledger

. Speed of operation will be increased tremendously and volume of output enhanced too.

1.5    SCOPE  

This project has been narrowed down to the financial humations of particular project undertaken by the said company. It tells us about the nature of project. Its contract value, the equipment and materials procedures in the execution of the project the labour cost and wages to the project. And finally, it furnishes the management with the information of how much was expended while carrying out the project and how much is remaining, that will serve as profit.   

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM.

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM. INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM.?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM.?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERIZED COST ACCOUNTING SYSTEM., What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!