Select Currency
Translate this page

THE CAUSES OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 58  |  3002 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

1.0 INTRODUCTION

Only little portion of government projects are executed by direct labour, while most of the development projects are awarded to contractions. Public structures have been known to be abandoned in the cause of construction or left to dilapidate after being practically completed. Incidents of abandoned projects are rampant all over the country e.g. from Enugu to ILorin, port Harcourt to sokoto and Lagos to Maidugwi. Projects of high capital cost. Such as residential buildings, office buildings and even road constructions.

1.1 HISTORICAL BACKGROUND OF THE FEDERAL CAPITAL TARRITORY VIZ – AVIZ FEDERAL CAPITAL DEVELOPMENT AUTHORITY ABUJA (FCDA)

The federal capital territory Abuja was created in 1976 by Decree No6 of that year which was established the federal capital development agency responsible for the design, construction and administration of the territory. The decree also vested ownership and control for all land in the territory in the federal government of Nigeria. The territory which is located at the centre of the country covers an areas of 8000sqkm.

It is therefore more than twice the land area of Lagos state (93535sq.km) about two-thirds the size of Imo state (13032sq. km). The federal capital territory itself is designed to cover an area of 256sq. Km or 3% of the total land area of the territory and at full development the city is expected to have a total population of 3.2 million.

In the FCT the duration of sunshine range from 6-8 hours per day in the south and 8-10 hours per day in the North from January to April / may. There is however a steep drop to a mean of about 4 hours per day in the month of July / August largely due to increase in cloud cover it starts again in the month of September. Abuja, a virgin land with virtually no amenities of any sort before 1976 even where the pioneer civil servants would stay became a test case. Therefore Civil Servants had to stay in scattered level hotels in Suleja for residential accommodation and a borrowed Niger State Housing Estate had to be used as the Head Quarters of the FCDA. The only road from Suleja to the Linther land of the territory was a colonial narrow tarred road.

FCDA is a parastatals under the Ministry for the Federal Capital Territory (MFCT) responsible for the physical development f the territory. Under FCDA is the Development of Public Building and Engineering. The development of Public Building is in charges of designing and supervising f buildings while the Engineering Development, takes charge of road, dams and Electrical Services and bridges. Most projects are executed through contractors while little is done by direct labour.

1.2 STATEMENT OF RESEARCH PROBLEMS

It has been observed that inspite f the effort put by government to brings to actualization the conception of its projects, public projects are still massively abandoned at different stages of construction. What are the factors responsible for the abandonment of public projects? This study is therefore geared towards examining the factors that cause abandonment of public sector development especially FCDA projects.

1.3 AIMS AND OBJECTIVES

The aims of this project are to examine the causes and effect f abandoned Public Development Projects in the Federal Capital Territory Abuja.

The above aim was drafted with the following objectives in mind.

(i) To establish and identify the cause of Abandoned public developmeent project in the Federal Capitals Territory Abuja.

(ii) To investigate the effect of the abandoned public development projects on the livs of the citizens.

(iii) To investigate its effects also on the environment.

(iv) To suggest possible solution to causes of abandonment of public development projects in the Federal Capital Territory Abuja.

1.4 RESEARCH QUESTIONS

(i) What are the possible causes of abandonment of Federal Capital Development Authority Project?

(ii) What are the possible effect of abandonment of such projects?

(iii) How can abandonment of public development projects be minimized in the Federal Capital Territory Abuja?

(iv) What are the possible solutions to abandonment of public development projects in the Federal Capital Territory Abuja?

1.5 SIGNIFICANCE OF THE STUDY

(i) It will assist public sector development to avoid abandonment projects.

(ii) It will assist researches on similar topics.

(iii) It will educate the public on abandonment of projects and brief historical background of the FCT.

1.6 SCOPE AND LIMITATION

The scope of this project is only limited to the causes f Abandonment Public Development Project in the Federal Capital Territory Abuja with Federal Capital Development Authority (FCDA) as Area of Concentration (Case study).

1.7 OVERVIEW OF THE STUDY

The aim of the project is to examine the causes and effect of abandoned public development project in the Federal Capital Territory Abuja. Some of the causes which include inadequate funding or Bankcrupcy, lack of payment, high interest rate, inflation, improper planning, political reasons, delay in payment, corruption, bureacracy and back of special materials having its effect on lowering of living standard of the populace and as well making the environment look ugly among other effects. The chapter two made a reviews of related and relevant literature.

In the chapter three which is the methodology, both primary and secondary sources of data where used the percentage method. In chapter four the data acquired were presented on tables were analysed accordingly.

  DOWNLOAD THE COMPLETE PROJECT

THE CAUSES OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE CAUSES OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE CAUSES OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE CAUSES OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE CAUSES OF ABANDONED PUBLIC DEVELOPMENT PROJECTS IN ABUJA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!