Select Currency
Translate this page

DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 41  |  7910 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA

 

CHAPTER1

INTRODUCTION

1.1 BACKGRAND TO STUDY

Interpretation of data from Well test analysis have been based on the implicit assumption that the reservoir is a homogeneous single layer. However, the real petroleum reservoir, is a composition of layers with unique interlayer characteristics. The individual layers are usually separated from each other by an interface which could be either permeable or impermeable. Pressure behavior in this kind of vertically heterogeneous system is not necessarily like that of a single layered system and seldom reveals more than the average properties of the entire system. It is against this backdrop that this study became necessary.  Well completion in such systems would be more instructive, enabling better reservoir and production engineering practice if detailed layer information is available at it prime. The petroleum industry is however interested in accurately calculating the pressure losses that occur for multiphase flow in the tubing and pipelines. Accurate predictions of pressure losses in pipes would enable proper design. Also, pressure determination in a production system in the petroleum industry is very important as it helps in the effective production of oil and gas from the reservoir but of all, the most important is the determination of flowing bottom-hole pressure as its knowledge helps in the determination of so many parameters needed for efficient production and also to avert early depletion of the reservoir. Its knowledge can also be used to prevent formation damage which could be caused by early sand production in the reservoir. Surface pressures often can be converted to bottom-hole values if adequate information is available about the wellbore system.

1.1.1 WHAT IS BOTTOM HOLE FLOWING PRESSURE

The pressure at the bottom of a working oil, water, or gas well (the Great Soviet Encyclopedia, 1979). The pressure measured in a well at or near the depth of the producing formation. For well-test purposes, it is often desirable to refer the pressure to a datum level chosen at a reference depth by calculating the pressure that would occur if the pressure measurement were made at the datum level rather than at the actual depth of the gauge (Schlumberger oilfield glossary). A knowledge of this pressure is fundamental in determining the most efficient methods of recovery and the most efficient lifting procedure, yet there is less information about these pressures than about any other part of the general problem of producing oil (Millikan and Sidwell, 1930). As earlier said, the bottom-hole pressure can be determined from surface pressures like the well head pressure if adequate information is available about the production system which can be easily gotten from well testing operations (Economides, 1979). Since the well head pressure and parameters are easily gotten from pressure transient analysis whose success depends on the accurate measurement or estimation of bottom-hole pressure (Omohimoria and Ayodele, 2013), it is therefore desirable and necessary to obtain the bottom-hole pressure from these data. This will be carried out in order to further highlight the advantages which is associated with having adequate knowledge about the bottom-hole pressure of a reservoir.

1.1.2 TYPICAL FLOW REGIMES

At certain position and time in the reservoir different flow behaviors are usually encountered in the reservoir. This gives rise to different flow regimes. Flow regimes are usually classified according to the rate of change of pressure with respect to time and position

Steady state

During steady-state flow, the pressure does not change with time. This is observed for example when a constant pressure effect, such as resulting from a gas cap or some types of water drive, ensures a pressure maintenance in the producing formation. Pressure usually will changes from one point to the other in the reservoir algebraically,

…………………………………………1.1

Pseudo steady state

The pseudo steady state regime characterizes a closed system response. With a constant rate production, the drop of pressure becomes constant for each unit of time.

……………………….. 1.2

Where k is a constant.  In practice, this can be reached more easily than the steady state.

 Transient state

Transient responses are observed before constant pressure or closed boundary effects are reached. The pressure variation with time is a function of the well geometry and the reservoir properties, such as permeability and heterogeneity. It can be expressed mathematically as,

………………………….. 1.3

Usually, well test interpretation focuses on the transient pressure response. Near wellbore conditions are seen first and later, when the drainage area expands, the pressure response is characteristic of the reservoir properties until boundary effects are seen at late time (then the flow regime changes to pseudo steady or steady state). The applications of the steady-state flow to describe the flow behavior of several types of fluid in different reservoir geometries are presented below. These include:

• Linear flow of incompressible fluids

• Linear flow of slightly compressible fluids

• Linear flow of compressible fluids

 • Radial flow of incompressible fluids

 • Radial flow of slightly compressible fluids

 • Radial flow of compressible fluids

 • Multiphase flow

1.1.3 VerticalMultiphase flow

Much has been written in the literature regarding the multiphase flow of fluids in pipe. This problem is much more complex than the single-phase flow problem because there is the simultaneous flow of both liquid (oil or condensate and water) and vapor (gas). The mechanical energy equation   is the basis for methods to estimate the pressure drop under multiphase flow; however, the problem is in determining the appropriate velocity, friction factor, and density to be used for the multiphase mixture in the calculation. In addition, the problem is further complicated as the velocities, fluid properties, and the fraction of vapor to liquid change as the fluid flows to the surface due to pressure changes. Many researchers have proposed methods to estimate pressure drops in multiphase flow. Each method is based on a combination of theoretical, experimental, and field observations, which has led some researchers to relate the pressure-drop calculations to flow patterns. Flow patterns or flow regimes relate to the distribution of each fluid phase inside the pipe. This implies that a pressure calculation is dependent on the predicted flow pattern. There are four flow patterns in the simplest classification of flow regimes:

· Bubble flow

· Slug/Plug flow

· Churn flow

· Annular-mist flow

Bubble: (Fig...) This type of flow was noted to occur at very low gas velocities.  This type of flow is characterized by bubbles of gas moving along the upper part of pipe at approximately the same velocity as the liquid.

Slug/Plug flow: (Fig…) In this type of flow, the flow of liquid is basically restricted due to the amount of gases which evolve from the liquid phase and collage to form slug-like gas pockets. Like the bubbly flow, the liquid phase is the continuous phase but in this case, the gas phase overrides the liquid phase.

Churn flow /Semi-annular: (Fig...) It is characterized by secondary currents set up by the velocity gradients in the liquid causing the liquids to climb the tube walls and, aided by waves, to coalesce at the top.  The amount of liquid in the bottom of the tube was greater than at top and walls, hence the name semi-annular.

Annular: (Fig...) This type of flow is characterized by liquid flowing in a thin film around the entire inside face of the pipe, the gas flowing at a high velocity as a central core.  The liquid is flowing in a continuous annular rings, hence the name annular flow.

Figure 1.1: Flow patterns in Vertical Flow

Figure 1.1.3 above (Taitel, Bornea and Duckler, 1980) shows the various flow regimes that could be expected in vertical flow as a function of the superficial velocities of gas and liquid flow

1.2 STATEMENT OF THE PROBLEM

A calculation method for predicting Bottom Hole Pressure (BHP) based on easily obtainable wellhead parameter has been the preferred method in the oil and gas industry. But the predictive capability of the existing correlations is a thing of concern to the oil industry operators. This is due to the inability of the existing models and correlations to account for the presence of sand particles in the flow stream; also, the requirement for the well to be shut-in for BHP predictions is counterproductive.

1.3   AIM& OBJECTIVES

The aim of the project is to determine the flowing bottom-hole pressure of a vertical well from surface pressure and well parameters. This will be done by the modification of the general energy equation considering only the frictional pressure term. The modified equation (derived model) will be validated with a well data which will be gotten from a company.

The objectives of determining the flowing bottom-hole pressure of a well from well head pressure and well head data include the following:

· Efficient interpretation of the behavior of the underground system.

· Determination of BHP helps in provision of important information for efficient production, avert early depletion and early sand production in the reservoir.

· Determination of the most efficient methods of recovery and the most efficient lifting procedures.

· Determination of pressure losses in pipes and tubing for proper design of Artificial Lift Systems - Gas Lift, ESP’s etc.

· Production Optimization - Identification of production bottlenecks, Gaslift optimization, and completion designs.

  DOWNLOAD THE COMPLETE PROJECT

DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DETERMINATION OF FLOWING BOTTOM-HOLE PRESSURE FROM WELL-HEAD DATA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!