Select Currency
Translate this page

DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 88  |  2934 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS

 

ABSTRACT

This research work mainly investigates the development and the behavior of cones (both water and gas cones) in oil reservoirs supported by strong aquifer, and from which analytical correlations are developed for quick engineering estimates of the time for water/gas cones to break into the perforations of the producing wells. The studies treated the cone development and breakthrough times in both horizontal and vertical well producing reservoirs and made analysis on them. The Ozkan and Raghavan (1990) method was employed as the base approach in the modeling of the cones; as well as their breakthrough times and then compare with that of Chaperon’s approach(1986) with both the horizontal and vertical well applied. The developed models were then run on field data, the results were graphically represented in both the horizontal and vertical well cases. Analytical correlations were then developed from the results obtained for breakthrough time estimation and compared with literature on example case. This work actually employs the dimensionless (or the normalized approach) system to curtail the units complexities and represent the results in a more generalized form. These analytical correlations can be leveraged on to plan better future recompletion strategy as they provide an engineering estimate of when water breaks into the production wells.

 

CHAPTER ONE

1.1 INTRODUCTION

Coning is the mechanism describing the movement of water/gas into the perforations of producing wells. For water coning the movement is upwards for the case of bottom water, side wards for edge water, but it is downwards for gas coning. The production of water from oil wells is a common occurrence which increases the cost of producing operations and may reduce the efficiency of the depletion mechanism and the recovery of reserves. The objective of this research work is to model the behaviour of this coning(mainly water coning, from bottom water) and then use it to evaluate the time it would take a cone to break into the producing well in reservoir of well-defined boundary conditions.

The coning of water into production wells is caused by pressure gradients established around the wellbore by the production of fluids from the well. These pressure gradients can raise the water-oil contact near the well where the gradients are dominant. The gravity forces that arise from fluid density differences counterbalance the flowing pressure gradients and tend to keep the water out of the oil zone. Hence, at any given time, there is a balance between the gravitational and the viscous forces at any point on and away from the completion interval. The water cone formed will break eventually into the well to produce water along with the oil when the viscous forces exceed that of the gravitational forces. This basic visualization of coning can be expanded further by introduction of the concept of stable cone, unstable cone and critical production rate.

STABLE CONE:

If a well is produced at a constant rate and the pressure gradient in the drainage system have constant, a steady state condition is reached, if at this condition, the dynamic forces (viscous forces) at the well are less than the gravity forces then the water or gas cone that has formed will not extend to the well .Moreover, the cone will not advance nor recede, thus establishing what is known as stable cone.

UNSTABLE CONE:

Conversely, if the pressure in the system is in an unsteady-state condition, then the cone that will be formed is unstable and it will continue to advance until the steady-state condition takes over. If the flowing pressure drop is sufficient to overcome the gravity forces, the unstable cone will mushroom and ultimately break into the well. In actual sense therefore, stable cones may only be 'pseudo-stable' because the drainage system and the pressure distribution generally change. For a example, during reservoir depletion, the water- oil contact may advance toward the completion interval, thereby increasing coning tendencies. Another one is reduction in productivity due to well damage requires a corresponding increase in the flowing pressure drop to maintain a given production rate. This increase in pressure drop may force an otherwise stable cone into the well.

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!