Select Currency
Translate this page

PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 78  |  3630 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT

 

ABSTRACT

The production of formation sand is a problem associated with most oil deposits in the world. Major Sand production effects affect safety, well or field economics and continuous production. This has prompted the continued search for solutions to mitigate sand production in the oil and gas industry over time. The methodology often employed is through exclusive sand control or passive sand management. The ability to predict when a formation will fail and produce sand forms the basis as to what type of sand management strategy to use (whether downhole sand control system will be required or a sand management approach). As a result sand prediction forms the basis for major reservoir development plan. Variety of models available, their applicability and accuracy can be confusing and not representative of the production experience. Also, the concept of sand prediction, control and management is often treated separately. This study views sand prediction, control and management as an interdependent concept (Holistic). Review of State of the art sand prediction, control and management is carried out to proffer better understanding of the concept of sand production management. The mechanism of sand production is discussed with highlight of major parameters influencing sand production. It is identified that sand prediction forms the basis for reservoir development plan, therefore effective methodology for sand prediction, control and management is developed. Stepwise approach to carry out this concept is presented with flow charts and guidelines. In conclusion the study states the importance of data accuracy in sand prediction, the use of risk quantification. Quantifying uncertainties inherent in most predictions will help deploying the right type of sand management strategy in a formation.

 

CHAPTER ONE

PROBLEM FORMULATION

1.1  Introduction

The production of formation sand is a major problem encountered during the production of oil and gas. Over 70 % of the world’s oil and gas reserves sit in sand formations where sand production is likely to become an issue during the life of the well (Osisanya, 2010). Sand production is typical of tertiary formations (with permeability of 0.5 to 8 Darcy) and older formations as they enter their mature stages of production due to poor completion and impact of depletion. Areas where severe sand production problems occur include Nigeria, Trinidad, Indonesia, Egypt, Venezuela, Malaysia, Canada tar sands and Gulf of Mexico. The reservoirs in these formations lie between 3,500 ft and 10,000 ft (subsea). Generally, the effects of sand production ranges from economics and safety hazards to well productivity and therefore has been an issue of interest to tackle in the petroleum industry. Some of these effects include erosion of downhole and surface equipment, pipeline blockage and leakage, formation collapse, damage to casing/production liner due to formation subsidence, and increased downtime. These devastating effects lead to more frequent well intervention and workovers generating additional needs for sand disposal particularly in offshore and swamp locations. The effects of sand production are nearly always detrimental to the short and or long term productivity of the well (William and Joe, 2003). In order to mitigate problems related to sand production new strategies are being continuously investigated, from prediction to control and management.

The ability to predict when a reservoir will fail and produce sand is fundamental to deciding whether to use downhole sand control or what type of sand control to use (Bellarby, 2009). Sand production occurs normally as a result of drilling and reservoir management activities. Sand grains are disengaged from the rock matrix structure under physical (earth stress) and chemical action. The mechanism of sand production in terms of sand, volumes and sand producing patterns in the reservoir is needed to optimally develop a field. Mechanisms causing sand production are related to the formation strength, flow stability, viscous drag forces and pressure drop into the wellbore (Osisanya, 2010).

The critical factors leading to accurate prediction of sand production potential and sand production are: formation strength, in-situ stress, and production rate. Other factors are reservoir depth, natural permeability, formation cementation, compressibility, surface exposed to flow, produced fluid types and phases, formation characteristics, pressure drawdown and reservoir pressure. Predicting sand production involves developing empirical and analytical techniques. Empirical techniques relate sand production to some single parameter or group of parameters such as porosity, flow or drawdown analytical techniques relates to rock stresses. Numerical analytical techniques are also sometimes used. They are models developed from finite element analysis. The techniques above use production data, well logs, laboratory testing, acoustic, intrusive sand monitoring devices, and analogy (Osisanya, 2010). At present, predicting whether a formation will or will not produce sand is not an exact science and needs more improvement.

  DOWNLOAD THE COMPLETE PROJECT

PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for PRACTICAL APPROACH TO EFFECTIVE SAND PREDICTION, CONTROL AND MANAGEMENT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!