Select Currency
Translate this page

INVESTIGATION INTO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 88  |  1576 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

INVESTIGATION TO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS

 

ABSTRACT

The essence of this project work is to look into the causes of highway failure and the different types of failure which are presented along the Eliozu - New Airport road in Obio/Akpor L.G.A in River state, taken as a case study. Some factors identify as being responsible for the failure of the chosen road section includes, poor sub grade soil with questionable material. Ground water study is carried out, which give insight to it effect to the failure of the flexible pavement, lack of drainage facilities, improper pavement design, poor compaction and traffic volume increase and lack of maintenance are critically taken into consideration. Traffic volume count and soil test analysis and test on asphalt such as extraction-gradation test, are properly carryout, of which it result gives an adequate insight to the various causes of the failure situation experience along the road section through this investigation, show that relative to pavement, base course, wearing course and sub base were to less than the requirement for effective functionality of the said road of case study. From the investigation carryout, useful recommendation are made to improve the design and proper ways of reducing the rate of failure in Nigerian highways.

 

INTRODUCTION

In construction of highway, generally the roads are not designed to last forever. It is been designed to serve some purpose for a specific time. As it can be seen in engineering work, the life span of a road is always an important factor that must be taken into consideration as one of the criteria for the construction. This really depends on the factors like construction procedure and consideration, the soil water relationship, quality of workmanship during the construction and the type of maintenance culture adopted. Many roads (Highway mostly) are seen widely as attaining the state of failure and show signs of distress before the expected life span used for construction is reach, due to the lack of factors such as lack of maintenance culture etc. many of our road today serve as death trap and hang out for hoodlums going by the number of accident recorded daily on them as a result of bad paved road. Pavement failure can be defined as the failure of the constructed layer of durable material of specified thickness, usually of concrete, asphalt or bituminous materials assigned to carry wheeled vehicles. Due to the number of load passing through a pavement structure, some deflection of the surface and underlying layers occur. The deflection can be as a result of the excess load, poor material usage, and poor road foundation resulting from the nature of the soil or groundwater rise in the area of high groundwater level. If layers are lacking in strength, repeated applications causes roughening and cracking that ultimately lead to failure of the pavement structure.

The construction of the Eliozu-New Airport road, which was constructed a while ago, sudden failure due to improper investigation of either the soil composition or traffic capacity situation in the said section of the road networking, lack of proper drainage to control the effect of rise in groundwater level. The pavement thickness of the road section as measure was about 3.87inches (98.3mm) and the width of the dual carriage way about 7.9m with no proper shoulder and drainage provided. The effort of put in controlling the rate of failure and provision for annually increase of traffic capacity has been a thing of burden to the government of the River State in particular and the Federal government in general. By questioning and observation, failure of the said Eliozu-New Airport road as it problem from compounded presence of water coming out at a particular points on the road surface poor material and workmanship and pressure from increasing traffic capacities on the road pavement of which the government is making provision for overhead bridge which is currently in construction and it is found out that most at a point like Eliozu junction by ABC shuttle, the pavement bituminous material on the road have disappear.

1.1 AIMS AND OBJECTIVE OF STUDY

The major objective of this investigation is to ascertain factors that likely lead to the failure of Eliozu-New Airport road in Obio/Akpor L.G.A. of River State in particular and Nigeria Highways in general and how it affect national stability and development. This project work stand at a point to unveil the very facts behind why most of the roads fail soon after construction. The count carryout will broadly provide information on the actual traffic volume and the capacity of traffic and will help in used for possible traffic planning and design. It shall lead in proper construction of highway and remedy that will possible give a lasting solution and reduction in road failures. The several test such as test on asphalt, test on soil will provided better facts to the cause of the failure of the case study.

1.2 SCOPE OF THE PROJECT STUDY The whole section of the road was visited (Reconnaissance) and failure pattern noted.
The project scope includes:

- Assessment of kind of failure and causes on the Eliozu-New Airport road.

- Soil samples collection and testing and analysis to determine the sub-grade, sub-base strength of the road foundation.

- Assessment of underground water level and its affect on the pavement. 

- Assessment of traffic capacity intensity on the networking plan of the road and volume determination.

- Assessment of drainage condition and proper drainage provision.

- Assessment of the proportion and amount of bitumen and finer used in the Asphalt mixture used for the surface course.

- Classification of the soil according to ASSHATO classification system.

- Enumeration of possible pavement distresses that are found along a road section.

1.3 BACKGROUND INFORMATION OF THE STUDY AREA

The location of which this investigation is been carryout is a road network located at Obio/Akpor L.G.A at the out script of Port-Harcourt, River State. The road is from Eliozu junction to Airport road leading to Elele of which concentration is lay on the Eliozu junction where ABC shuttle is, at where over head bridge is undergoing construction currently to where the Eliozu-New airport road intersect with the airport road.

1.4 LIMITATION OF THE STUDY

This research was carried out under the limits of the available material and resources. The work is centre on soil sample testing and classification, asphalt testing and traffic volume and effect of groundwater on road bases.
The following factors hinder the prompt attainment of this project work. 

- Lack of laboratory facilities

- Cost of the project work

- Time proximities.

  DOWNLOAD THE COMPLETE PROJECT

INVESTIGATION INTO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON INVESTIGATION INTO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on INVESTIGATION INTO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on INVESTIGATION INTO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for INVESTIGATION INTO ASCERTAIN THE CAUSES OF FAILURE AND PRESENT TRAFFIC CAPACITY OF HIGHWAYS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!