Select Currency
Translate this page

RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES

Format: MS WORD  |  Chapter: 1-5  |  Pages: 71  |  1979 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES

 

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND OF THE STUDY

The relevance of road to life and its activities cannot be over emphasized. Road is as old as the origin of man and plays a vital role in the life of the people in communities, states, countries. It is quite obvious that life would have been very difficult without the existence of roads. Nigeria for instance acknowledged the importance of road such that the local, state and federal government are all involved in the development and maintenance of road network.

History has shown that provision of roadway is a necessary tool for civilization. It advances prosperity increase and this bring about demand for better and faster communication facilities especially roads. The continuing increase in Nigeria’s population has made the daily movement of passengers and goods an increasing complex problem.

1.2     RECONNAISSANCE SURVEY

This is a quick type of survey or a rapid examination of the ground and its adjacent natural features usually made without survey instruments to limit the alternative routes in terms of cost to one or two. The following factors are normally considered in reconnaissance survey.

v Overall cartage of goods

v Nearness to road materials quarries

v Traffic conditions

v Soil conditions

v Right of way or road land

v Ruling gradient

v Type of road surface

v Number of major and minor bridges

v Approximate length and cost

v Curvative along the alignment

The road under consideration (A by pass from IMT/ Federal Secretariat road to Industrial center and Mass Communication Department) has been graded and motor drivers and pedestrians use it. On the sides of the proposed road are existing buildings and farm lands.

The traffic capacity of the road is low because of the poor grading of the road. Because the road has not been properly paved, less pedestrians use the road and motorist prefer going through the longer way by passing through mass communication department when going to industrial center. When the road is properly improved, all these problems will be eliminated and a lot of benefit will be accrued, benefit to the intending business center as a result of more people using the road and reduction in travel time.

1.3      GEOMETRIC DESIGN

This is the aspect of the highway design that is solely meant to take care of the road user and level of service rendered to him. The paramount factor of consideration included expected traffic capacity, design speed and volume. O’ Elaharty E. A in his book “Highway Traffic Planning and Engineering” states that proper geometric design will inevitably reduce the number and severity of highway accidents while ensuring high traffic flow with minimum delay. He continued by saying that improper design would result in the early obsolesce of the new highway with constant economic loss to the community.

1.4     FACTORS INFLUENCING THE CHOICE OF STATION

a.  Easy Measuring Condition: Stations were chosen to avoid obstacles during drainage or tape exercise.

b.  Intervisibility: Station were chosen and placed such that the station does not obstruct the other station line of sight.

c.  Tranversing at closed Distance should avoided: This is to avoid angular error that would be introduced there to target at short range not be properly bisected.

1.5    FACTORS WHICH FAVOUR THE SELECTION OF ROUTE OR ROAD ALIGNMENT

 

There are several factors which normally favour the selection of a route alignment for high way construction.

i.  The route should be as straight as possible. This implies less cost of construction, maintenance and operation of vehicles as wear and tear on curves route are entirely eliminated.

ii.  Vertical and horizontal elignment should be eased out with maximum radius of curvature in relation to the design speed and maximum route of superelevation.

iii.  Good sight distance should be maintained. Sight distance or visibility is the distance measured along the center line of the road over which the driver can see the opposite object on the road for necessary application of brake.

iv.  Applicability of proper road drainage: Immediate evacuation of rain water on pavements as well as embarkment of a highway is necessary is to last till the end of the design life generally taken as 20years.

v.  Availability of road building materials such as stone, gravel, sand, laterite etc along the highways bring down the cost of the construction as well as maintenance cost.

vi.  Good formation soil should be ensured.

1.6    AIM AND OBJECTIVE OF THE PROJECT

This aims at giving student practical knowledge in the design of a roadway in order to aid her in designing a related project in real practice in future.

1.7     SCOPE OF THE PROJECT

The scope of this project includes the leveling, theodolite traversing of the road, design of the curve, soil investigation and pavement design of the route of study.

  DOWNLOAD THE COMPLETE PROJECT

RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for RELEVANCE OF ROAD TO LIFE AND IT'S ACTIVITIES, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!