Select Currency
Translate this page

THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING

Format: MS WORD  |  Chapter: 1-5  |  Pages: 84  |  2614 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING: A CASE STUDY OF SOME SELECTED BUILDINGS IN AWKA SOUTH ANAMBRA STATE

 

ABSTRACT

The research looked at the effect of cost of roof on the total cost of a building (A case study of some selected buildings in Awka South, Anambra).It determines the attributes that effect the cost of roof, it finds out type of roofs and their cost implications and also examine the cost of the roof on the total cost of a building. Practicing Quantity Surveyor were consulted and their experiences on various types of roof were shared and compared. These experiences were used in fixing prices to the unpriced bill of quantities given to them. Data so collected were subjected to analysis: Bill of Quantities was used in presenting the cost of different types of roof design as it affects the total cost. The following findings and recommendation were made: On cost alone, low pitch roof is cheaper to construct than a higher pitch roof. Concrete flat roof of the same size and shape were found to be costlier than the previously stated roof types; Adequate attention should be given at the design stage when deciding on the geometrical shape of roofs because complex design in roof leads to in crease in cost of roof; Architect and Quantity Surveyors should critically examine the effect of any particular type of roof design before specifying them, especially where cost is the critical factor in a building project and to improve on duration of roof covering, the material should be adequately protected from rust by use of anti- rust and in the case of aluminum, it must be stucco embossed or baked but not spray painted.

 

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

The overall building cost of both private and public buildings are important as it is the summation of all the building element cost. Douglas and Peter (1980) believe that the total expenditure on the development of a project will be much higher than the net cost (of production) of the building fabric, necessitating financiers and stake holder in the industry need to know the total cost of fabric within a short time from the giving brief while contractors are concerned on how cost is allotted within the building.

A Quantity surveyor whose work is to cost the materials for the building will know which material that is relevant to that particular building, and remove those that are not relevant in order to reduce cost. He must bear in mind that the effective development of project depends on the estimated total cost of that project. Efficiency in execution and completion on time would be expedited by comparison of the cost of materials, time and labor with respect to various elements of building project especially the roof element.

Building material and components constitute between 50-60% of the total cost of construction input. Building materials and components for buildings must be properly selected to comply with standard and specifications. Many materials are satisfactory in some condition but not in others. However their choice will be governed by the ability of the materials to withstand the effect of climate and fulfill their design function, with respect to maintenance and overall economic implication. With this Architects should be careful during the design stage to avoid making wrongly selection of material for example if wrong roof covering was selected during design stage, the cost of the roof construction may be lower but the maintenance cost will be higher and the roof may not last long. To achieve quality roof, the Architects should have in mind the quality of the material they are specifying so that the material should be such that can withstand the effect of climate on the total cost of the building project.

The Prime Consultant who is responsible for obtaining the necessary approvals from appropriate authorities, designing of the work and other important steps, should ensure that his design is not for aesthetics but for functionality because some designers may fail to realize that their design can be too complex for site conditions and can present problems of build ability. For example, the choice of complicated roof design or concrete flat roof may pose more construction, maintenance problem and higher cost of construction than design that specified simple pitched roof.

1.2 AIM

The aim of this study is to determine the effect of cost of roof on the total cost of a building in Awka South Local Government Area.

1.3 OBJECTIVE OF STUDY

The objectives of this study are:

1.     To determine attributes that affect the cost of roof

2.     To find out type of roofs and their costs implications.

3.     To examine the cost of the roof elements to the total cost of a building.

1.4 SIGNIFICANCE OF STUDY

The versatility in roof design implies that roofs vary as variety of designs thus affecting the total cost of the building. This should therefore advise careful selection of design and materials for roof structure.

1.5 SCOPE AND LIMITATION OF STUDY

The study is based on a building design with a selected range of differing roof designs. A comparison is thus made of the varying total building cost to prove the hypothesis.

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE EFFECT OF COST OF ROOF ON THE TOTAL COST OF A BUILDING, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!