Select Currency
Translate this page

RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 73  |  1232 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA

 

ABSTRACT
A power system is set up basically to meet the demands of the customers. However, interruptions which are largely unavoidable contribute to the unavailability of power and thus prevent power system from achieving this. In most cases, it is the sustained interruptions that greatly affect both the utility company and its customers. Hence, it is necessary to find means of determining which component failure contributes most to the unavailability of the distribution system, and how this unavailability actually affects the customers. This is to enable system planners and designers to seek better ways of improving the reliability of a typical secondary distribution substation system having a single-end fed radial configuration. By using analytical method and network reduction technique, the substation reliability was analyzed based on the outage data gotten from the utility company. The conclusion from this work shows that transformer failure followed by the fuse failure contributes most to the substation’s unavailability. The overall system availability shows that the system’s performance is poor.
CHAPTER ONE 
INTRODUCTION
1.1        BACKGROUND OF THE STUDY
Electric power system is basically set up to supply electricity with little or no interruptions to its customers. The number of interruptions that occur while the system performs its intended function is part of what determines the overall reliability of the system. The other factor that determines its reliability is the quality of electricity delivered. Furthermore, the capability of a power system to continuously deliver quality electricity means that the customers are satisfied and the electricity providers are having favorable returns on their investment as they continue their business of supplying electricity. As electricity consumption has become an important factor that affects the drive needed for technology to grow and to facilitate the development of modern society, it is very important therefore to take seriously the issue of reliability of an electric power system.
Generation, transmission and distribution are the three subsystems of an electric power system. At the generating station, electricity is generated and transmitted through the high voltage transmission lines to the distribution substations. The distribution substation system considered covers the electrical system between the substation fed by the subtransmission system and the supply line to the consumers’ meters i.e. 11kV to 0.415kV transformation (Theraja and Theraja, 2005). The distribution substations are usually sited relatively near the customers for effective delivery, monitoring and maintenance of the substation and the customer end and are usually referred to as secondary distribution substation system. Distribution systems basically serve as the link from the distribution substation to the customer. Reliable and safe transfer of electricity to the customers covered by the distribution area is ensured by this system and is the main subject studied in this dissertation.
In terms of reliability evaluation and modeling, generating stations have justifiably received more attention than the other systems because they are individually capital intensive. In addition, in the event of generation inadequacy and generation loss there is usually widespread catastrophic effects on the society and environment. It impacts directly on the whole system and even distribution system will not be able to perform its duty because there will be no electricity to supply to customers. However based on published research work and studies, distribution systems have begun to receive moderate attention compared to past decades. In most cases, when there is disturbance in form of failure which results in outages in the distribution system it affects only the localized territory. Only in few cases does the fault move up in to the system largely as a result of protection failure. Analysis of the customer failure statistics of most electricity companies shows that the distribution system makes the greatest individual contribution to the unavailability of supply to a customer (Gonen, 2014). In effect, the purpose of establishing generating stations and the hurdles overcome to transmit electricity is defeated when it does not get to the user end as a result of distribution system failure. This makes distribution system to be highly important. The distribution systems account for up to 90% of all customer reliability problems, improving distribution reliability is the key to improving customer reliability (Billinton and Jonnavithula, 1996).
Meanwhile, as the main aim of a power system is to meet the electricity needs of the customers and this can only be achieved when the components making up the system are performing their intended function properly for as long as the system is in operation, it is important that the demand for electricity and its supply be properly viewed and included in setting up the system. Therefore, due to its high impact on the cost of electricity and its corresponding effect on customer satisfaction, distribution reliability is very important. However, as in any other viable engineering system, there are challenges that face power distribution system which tends to make the system unreliable. One of these is the issue of serving its main purpose which is to supply quality electricity with little or no interruptions. This problem is inevitable in power systems across the world but the way they are managed is what makes it different from country to country. For instance in the United States, there is nearly an uninterrupted delivery of quality electricity to its numerous customers which makes it rank among the most dependable in the world. It is in management of the power systems that reliability evaluation becomes significant. Reliability evaluation does not in any way make a system more reliable but it helps in system planning and identification of weak components.

  DOWNLOAD THE COMPLETE PROJECT

RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!