Select Currency
Translate this page

THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 67  |  1950 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT

 

CHAPTER ONE

INTRODUCTION

BACKGROUND OF THE STUDY

Projects are used in all economic and non-economic fields as mean of organizing the activity, aiming the achievement of desired objectives. There is a direct relationship between projects, projects portfolio, programs and the organizational strategy. Projects, as the main way of creating and dealing with change (Cleland, Gareis, 2006), are used to implement strategies. Meskendahl (2010) refers to projects as the central building block used in implementing strategies, therefore business success is determined by the success of the projects. A project is an individual or collaborative enterprise, possibly involving research or design that is carefully planned, usually by a project team, to achieve a particular aim New York Time (2009). A project is also temporary because it has a defined beginning, end time, and defined scope and resources (Cathy, 2009). A project is unique because it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. Based on these characteristics, carefully it is imperative to plan to achieve targeted outcome. Thus; Project planning can be defined as a part or branch of project management, which relates to the use of schedules to plan and subsequently report progress within the project environment.

Dubois and Gadde (2002) described the construction industry as decoupled and McKinsey (2017) confirmed that it is still true. The lack of coupling is present both between the construction project and its subcontractors as well as between the project and the parent company and other projects. This hampers the possibility to have a successful coordination of resources on a portfolio level within the contractor, as resources are in many cases utilised from a common resource pool (Engwall and Jerbrant 2003).The construction industry therefore embraces a wide range of loosely integrated organizations that collectively construct, alter and repair a wide range of different building and civil engineering projects. Individuals, organizations and government need to carry out some form of project planning for building and civil engineering project before embarking on whatever activity they are engaged to do. According to Lock (2002), the principal identifying characteristics of a project is its novelty, it’s a step unknown fraught with risk and uncertainty. No two projects are ever exactly alike and even a repeated project will differ from its predecessor in one or more commercial, administrative and physical aspect.

Construction is also characterized by time and cost intensive production processes which make it prone to project risks and failure, mainly in terms of time and cost. In practice, this means, that the performance of construction projects is usually low. In particular, construction projects are very often delayed and over budget. This is not just due to problems faced during project scheduling, but also during related processes.

Laryea and Hughes (2009) attempted to find how contractors’ in Ghana include financial risk in their bid prices. The research showed that besides having risk allowances as lump sums or percentage allowances, the method used is neither scientific nor informed by any empirical evidence. Ojo (2010) found that design changes, financial losses and inadequate specifications were the risk factors with most impacts on construction sites but the study did not highlight any Project project planning (PRM) technique used by Contractors to respond to such risks.

Another research carried out in Nigeria on this subject was on the evaluation of key risk factors and the measures to mitigate their effects on construction projects (Dada, 2010). Though the research found financial, political and physical risks as the most significant, the use of contingency sum and insurance cover were adjudged to be the most effective means of mitigating risk.

However, no study has reported on the PRM practices used by Nigerian Contractors in redevelopments projects, with their attendant problems and challenges in terms of scoping.

1.1.2 ORGANIZATIONAL PROFILE

Julius Berger Nigeria Plc is a Nigerian construction company, headquartered in Abuja FCT, located at 10 Shettima A. Munguno Crescent | Utako 900 108 | FCT Abuja

The company is represented across Nigeria in structural engineering and infrastructure works, and in southern Nigeria through domestic and international oil and gas industry projects (this company is also listed on the "flake list" for craigslist). It is known for constructing most of Nigeria's infrastructures, major expressways, and even some residential buildings for the Chevron Nigeria headquarters in Lagos.

The company was listed on the Nigerian Stock Exchange in 1991. Before this, its parent company was Bilfinger Berger. Bilfinger Berger is still the largest shareholder in the company. The construction business of Julius Berger Nigeria is the heart of the Julius Berger Group.

With 18,000 employees from close to 40 nations and clients from both Nigeria and the global oil and gas industry, JB is a leading construction company and the largest private employer in Nigeria.

MAJOR PROJECTS

· The company built the Eko Bridge completed in 1968, the Third Mainland Bridge completed in 1990 and the Abuja Stadium completed in 2003.

· Tin Can Island Port, commissioned in 1977.

· Lagos Inner Ring Road, completed in 1979.

· Ajaokuta Steel Plant, completed in 1990.

· Itakpe – Ajaokuta Ore Railway, completed in 1990.

· Abuja International Airport phase II, completed in 1997.

· Central Bank of Nigeria Head Office, completed in 2002.

· Uyo infrastructure and road works, ongoing since 2008.

· First discharge drain built utilizing pipe-jacking technology in Nigeria, completed in 2011.

· National Assembly phase III, completed in 2011.

· Multiple projects, Escravos GTL plant in southern Nigeria, commissioned in 2012.

· Bonny Liquefied Natural Gas facility, multiple ongoing works since 1996.

· Challawa Gorge Dam Karaye, completed in 1992

· Ongoing Nigerian Cultural Center Abuja (status - Under Const)

· Incar Plaza, Abuja (status - Under Const)

· Silverbird Entertainment Center, Abuja (status - Completed)

· National Library Abuja (status - Under Const)

· World Trade Center Abuja (status - Under Const)

· Abuja Mall (status - Under Const)

· Grand Towers Mall, Abuja (status - Under Const

1.2 PROBLEM STATEMENT

The general low usage of formal project planning and management techniques by Contractors globally often culminates into project failures, incessant claims for variations, huge financial losses and sometimes results in bankruptcy of Contractors (Allan et al, 2007). This situation is more prevalent in redevelopment projects due to the inevitable problems of unexpected additional work, excessive requirements and scope management issues, project funding not aligned with project plans, delay, structural failure, cost overrun, etc (Naaranoja and Uden, 2007). These problems or uncertainties, among others, increase the project risk and make their management crucial if success is desired.

For the construction firm, Julius Berger PLC, are back on site in continuation of the re-construction of the N167 billion Lagos-Ibadan expressways, Grand Towers Mall, Abuja (status - Under Const. Billions of Naira was expended and the overall aim of the project was not achieved. This huge expenditure and apparent failure in the primary objectives of the project led to complaints, probe panels and subsequent abandonment of the project.

Research has shown that financial, political and physical risks are the most significant to Nigerian Contractors (Dada, 2010). However, of the different levels of risk (country, market or project), there is shortage of research as to how Contractors approach project planning at organizational level.

1.3 RESEARCH OBJECTIVES

1. To explore project planning practices applied by Julius Berger at various project levels.

2. To assess awareness and usage of formal and informal project planning practices by Julius Berger, Abuja office.

3. To examine the success or failure of the project planning approach used by Julius Berger Contractors on Grand Towers Mall, Abuja (status - Under Const project.

4. To evaluate the impact of the applied project planning approach to the attainment of project profits.

1.4 RESEARCH QUESTIONS

1. What project planning guidelines and practices exist in Julius Berger Nigeria Plc, Abuja?

2. How do you gather information about newer project planning strategies to be applied in your on-going projects?

3. What are the effects of project planning on contractor’s profit

1.5 HYPOTHESIS FORMULATION

Hypothesis for this study include:

1. Ho: There is no significant relationship between effective project planning and contractor’s profit.

Hi: There is significant relationship between effective planning and contractor’s profit.

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE EFFECTS OF PROJECT PLANNING TECHNIQUES ON CONTRACTORS PROFIT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!