Select Currency
Translate this page

PRODUCTION COST CONTROL IN MANUFACTURING ORGANISATION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 50  |  1620 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND OF STUDY

The main aim of this research work is an attempt to verify the indiscriminate increase in the prices of commodities produced in this part of the country by manufacturing organization and companies. This continuous rise in prices has attracted the attention of many citizens, mostly those who have ignorant of the adverse effect of this continuous rise in the prices on the citizen and the country economy. This research paper will therefore aim at giving a comprehensive account of the control of cost in the production field with emphasis on the manufacturing organization. The attribute of every organization is the pursuit of a goal and this goal exists in different forms.  It is evident, therefore that every manufacturing organization be it sloe, partnership, corporation, among others have an objective and this primary objective is profit maximization other objective such as social is purely secondary and solely depend on the profit.

Profit is the surplus or excess of to all income over total cost during a specific period of time.  It therefore follows that before any organization can make profit, they must exercise control over their production and services. There are other one still under production and the best ingredients are used for production in PRODA. Administration and Staffing.  Although the government Board has responsibility for general management as set out in the natural science and Technology, Act 1980, the day to day running of the institute is the function of the direct or research.

Administration, the institute is organized into divisions science, Engineering, ceramics and administration. The activate division form the point of view of research and development functions are science, Engineering  and ceramics. In order, both their research and development work and their production work be given equally emphasis each of these activities division is in turn organized into research units. 

1.2    STATEMENT OF THE PROBLEM

Many organizations operating in our country today try every effort to make use of they break even in order to make profit, still al these efforts seems t be worthless.  They reduce their cost in order to maximize as suppose to be, why do so many organization still not breakeven, not to talk of making profit after all their efforts to control cost? Does it mean that their cost control is not effective?  The researcher will give answer to these questions in his subsequent chapters.

1.3    PURPOSE/OBJECTIVE OF THE STUDY    

Some of the objectives of this research work is

i. To assess the various production cost control techniques and effectiveness as well s the efficiency.

ii. To know some of importance and need for cost control.

iii.To know cost control and reduction Technique in manufacturing originations.

Iv  To know the use of budgetary control system manufacturing organization.

V  To know the use of budgetary control system in cost control

1.4   SIGNIFICANCE OF THE STUDY

This research work as carried out by the research on production cost control in manufacturing organization will be of great important to so many manufacturing firms in the area of cost control in order to maximize profit.  Also individuals who are interested in entering into the business manufacturing will equal benefit from this project.

1.5   LIMITATION OF THE STUDY

The following limitations were faced by the researcher and limit efforts in elaborating the researcher work. 

Finance:  The researcher is a student with no souce of income and has been discouraged from traveling to all the labour market in Nigeria to collect dta for this study.  She ahs therefore chosen Enugu metropolis because of proximity and ease of contract to the workers.

Time:   This project work has just one semester time limit.  It would have been desirable for a longer time to complete the topic and extend the coverage but it was not possible.

Pressure from Academic Work:  The student was jam-packed with other academic activities and at the same time writing this research work and this brought little difficult in finishing this research work on time.

  DOWNLOAD THE COMPLETE PROJECT

PRODUCTION COST CONTROL IN MANUFACTURING ORGANISATION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON PRODUCTION COST CONTROL IN MANUFACTURING ORGANISATION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on PRODUCTION COST CONTROL IN MANUFACTURING ORGANISATION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on PRODUCTION COST CONTROL IN MANUFACTURING ORGANISATION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for PRODUCTION COST CONTROL IN MANUFACTURING ORGANISATION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!