Select Currency
Translate this page

EXPERT SYSTEM – BASED COST PREDICTIVE MODEL FOR BUILDING WORKS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  2297 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

 

INTRODUCTION

1.1   Background

 

Cost is one of the three main challenges for the construction manager, where the success of a project is judged by meeting the criteria of cost with budget, schedule on time, and quality as specified by the owner (Rezaian, 2011). In which, poor strategy or incorrect budget or schedule forecasting can easily turn an expected profit into loss (Cheng, et al., 2010). Therefore, effective estimating is one of the main factors of a construction project success (Al-Shanti, 2003). Accordingly, cost estimate in early stage plays a significant role in any construction project (Ayed, 1997), where it allows owners and planners to evaluate project feasibility and control costs effectively (Feng, et al., 2010).In addition, the cost of a building is significantly affected by decisions made at the early phase. While this influence decreases through all phases of building project (Gunaydın & Dogan, 2004).

 

Due to this prominence of cost estimate in early stage and limited availability of information during the early phase of a project, construction managers typically leverage their knowledge, experience and standard estimators to estimate project costs. As such, intuition plays a significant role in decision-making. Inasmuch the essential needs of project owners and planners to a tool to help them in their early decisions; researchers have worked hard to develop cost estimate technique that maximize the practical value of limited information in order to improve the accuracy and reliability of cost estimation work (Cheng, et al., 2010). Thus, many methods either traditional or artificial intelligence methods were studied and examined for their validity in estimating the project cost at conceptual stage.

 

In the last years a new approach, based on the theory of computer systems that simulate the learning effect of the human brain as Artificial Neural Networks (ANNs) has grown in popularity (Cavalieri, et al., 2004).

 

One major benefit of using ANN is its ability to understand and simulate more complex functions than older methods such as linear regression (Weckman, et al., 2010). In addition, it can approximate functions well without explaining them. This means that an output is generated based on different input signals and by training those networks, accurate estimates can be generated. (Verlinden, et al., 2007).

 

1.2   Problem Statement

 

In preliminary stage of a construction project in Lagos , there is a limited available data and a lack of appropriate cost estimate methods, where most of common estimate techniques that are used in Lagos  are still inadequacy traditional methods (Al- Shanti, 2003).

 

All parties involved in construction project are in need of reliable information about the cost of a project in the early stages. Therefore, many researchers are still searching and developing a new technique that is capable of dealing with very limited data and giving more accurate cost estimate.

 

However, many researchers in recent years applied ANN approach in various fields of engineering prediction and optimization, but the authors reckon that the researches and studies on utilizing neural networks to estimate the cost of construction projects at various stages are very limited until now (Arafa & Alqedra, 2011; Gunaydın & Dogan, 2004; Harding, et al., 1999; Adeli & Wu, 1998; Sonmez, 2004).

 

1.3   Research Aim

 

The aim of this research is to develop a new model for early cost estimate of building projects in Lagos  by developing an Artificial Neural Network (ANN) model. This model is able to help parties involved in construction projects (owner, contractors, consultants, and others) in obtaining a cost estimate at the early stages of projects with limited available information and within possible time and high accuracy.

 

1.4   Research Objectives

 

The principal objectives of this study are:

 

1. Identify the most prominent parameters affecting the accuracy of estimating the building project cost in Lagos .

 

2. Develop a comprehensive tool for parametric cost estimation using the optimum Neural Network model.

 

1.5   Research Importance

 

The contributions of this thesis are expected to be relevant to both researchers and practitioners:

 

§  To researchers, the findings should help to investigate the accuracy of applying Artificial Neural Network model on several building types (not only one type), in addition to identifying the most influential parameters on the total cost of these several types.

 

§  As for practitioners, the findings should help to easily estimate the cost of new building projects after programing the developed model into marketing programs.

 

1.6   Research Scope and Limitation

 

This research focuses on buildings sector of construction projects in Lagos ; including the main two phases of construction building; skeleton and finishing phases. Thus, many building projects that were implemented between 2009 and 2012 were collected, and some types of these building projects were excluded according to lack of available frequency such as hospitals, laboratories and universities.

 

1.7   Methodology Outline

 

The objectives of this study will be achieved through performing the following steps:

 

-  Conduct a literature review of previous studies that are related to construction cost estimate and paying special attention of using ANN.

 

-    Conduct quantitative and qualitative survying techneques to ldentify the influntial factors on cost of building projects in Lagos .

 

- Conduct exploratory interviews with all engineering institutions to obtain the relevant data of building projects; to be used in building the model.

 

-     Select the application Neurosolution software to be used in modeling the neural network.

 

- Examine the validity of the adopted model by using statistical performane measurements and applying sesitivity analysis.

 

1.8   Organization of the study

 

The current study was included six chapters explained as follow:

 

Chapter (1) Introduction

 

An introductory chapter defines the problem statement, the objectives of this study, the methodology and an overview of this study.

 

Chapter (2) literature Review

 

Presents a literature review of traditional and present efforts that are related to the parametric cost estimating, and application of Artificial Neural Network (ANN) model in related field with its characteristics and structures.

 

Chapter (3) Research Methodology

 

The adopted methodology in this research was presented in this chapter including the data-acquisition process of influential factors that relate to cost estimating of building projects and historical data of building projects that necessary for the proposed model.

 

Chapter (4) Data Results

 

Presents statistical analysis for questionnaire surveying, Delphi technique and data frequency. It also presents the adopted influential factors in this study and the encoded data for model implementation.

 

Chapter (5) Model Development

 

Presents the selected application software and type of model chosen and displays the model implementation, training and validation. As well, the results of the best model with a view of influence evaluation of the trained ANN model are showed.

 

Chapter (6) Conclusion and Recommendations

Presents conclusions and recommendations outlines for future work.

  DOWNLOAD THE COMPLETE PROJECT

EXPERT SYSTEM – BASED COST PREDICTIVE MODEL FOR BUILDING WORKS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EXPERT SYSTEM – BASED COST PREDICTIVE MODEL FOR BUILDING WORKS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EXPERT SYSTEM – BASED COST PREDICTIVE MODEL FOR BUILDING WORKS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EXPERT SYSTEM – BASED COST PREDICTIVE MODEL FOR BUILDING WORKS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EXPERT SYSTEM – BASED COST PREDICTIVE MODEL FOR BUILDING WORKS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!