Select Currency
Translate this page

REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 58  |  4518 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT

 

ABSTRACT

The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu. The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equipment in the pilot plant, so that student would use it in understanding the nature of the flow of fluid through pipe lines, these process was also for the development of the knowledge of every one who carried out the operation. The process involved in the refurbishment of the fluid flow demonstration unit were in stages and it started with the finding of faults, at this stage the equipment was operated to know where the possible fault would arise from, while water was passing through the cylindrical glass tube, it was not visible, which we noted was due to dirt’s cloged in the pipes internal surface.  The storage tank was filled with clean water, when this water was pumped out, it was dirty then we noted also the storage tank was dirty.  Some pipes were not held firmly to the board this was due to worn out clips, bolts and nuts, we also noticed leakages in some hose pipes. Since the faults has been found we started servicing by first decoupling of the cylindrical glass tubes from the board one after the other with utmost care using screw drivers, spanners and pliers gradually all the tubes were removed from the board.  After dismantling these tubes, sulphuric acid {H2S04}, detergent, water and brush which would be used for washing the pipes were brought in place, the sulphric acid was passed through the pipe to soften the dirt’s in the pipe, then the detergent was dissolved in water, with brushes of different sizes all the pipe were washed and rinsed with clean water and allowed to dry.  After these a dry rag was soaked in detergent and water which was used in cleaning the board removing the stains and dirts from it, then it was allowed to dry.  The board was later painted with a white oil paint using a brush to coat it first and allowed to dry then finally painted.  The storage tank was also washed with detergent and waters the allowed to dry, then it was painted with the aid of a brush both internally and externally.  Some bolts, nuts, chips and hosepipe that was leaking were replaced. Finally the fluid flow demonstration unit was brought back in place for use, giving the unit along lasting use, enabling the use in the Chemical Engineering pilot plant.

  DOWNLOAD THE COMPLETE PROJECT

REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for REFURBISHMENT OF FLUID FLOW DEMONSTRATION UNIT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!