Select Currency
Translate this page

INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE

Format: MS WORD  |  Chapter: 1-5  |  Pages: 52  |  7534 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

1.1 INTRODUCTION

The site under investigation is Hillview of ESBS Road Enugu.

Along the site failures are observed especially depress on pavement and lost of pavement totally which are caused by excessive moisture in the sub – grade.

The aim of the investigation is to know  the extent of the failure on the flexible pavement and the nature of the failure.

The aim is also to give recommendation on how to improve the pavement which has occurred at the site under investigation.

1.2 LITERATURE REVIEW

The uses and application of modern technologies and new concepts have been deviced to tackle problem of pavement failure by many organized bodies.

1.3 DEFINITION OF PAVEMENT

a pavement can be defined as the hard crust of the road structure placed above the soil formation or sub-grade.

1.4 FUNCTIONS

The function of pavement is to transmit acceptable pressure to the bearing subgrade through sub base soil which must be less than the bearing capacity of the soil sub-grade.

1.5 TYPES OF ROAD PAVEMENT

There are two main types of pavement

(i)  Flexible Pavement

(ii) Rigid Pavement

1.6 FLEXIBLE PAVEMENT

This consist of various lagers of high way building materials compacted so as to be void free and finished with elastic surface such as bitumen as asphalt maintain intimate constant and distributes inter lock, particle reaction and cohesiol per stability.

1.7  ADVANTAGES OF FLEXIBLE PAVEMENT

If good services are to be received from bituminous pavement it must be for its full life, retain the following qualities.

(i) Smooth riding or in skid surface

(ii) Tight, impermeable surface or porous surface

(iii) No cracking or fatigue failure

(iv) Resistance of weather

(v) Resistance of moisture

1.8 DISADVANTAGE OF FLEXIBLE PAVEMENT

If not properly constructed --- will be

(i) Poor weather resistance

(ii) Presence of cracking

(iii) High cost is incurred during construction

(iv) Fatigue failure will occur

1.9 RIGID PAVEMENT

This type of pavement is made up of reinforcement or non – reinforcement concrete slab. It consist of two layers the cement slab and the snobs of granular material or stabilized soil.

These two large are sprees I n separate construction operation.

1.10 ADVANTAGE OF RIGID PAVEMENT

This types of pavement has long life, when properly design constructed.

It has low maintenance cost

The reinforcement made it not flexible

1.11 DISADVANTAGE OF RIGID PAVEMENT

(i) Trans-cracking of concrete paving slab under combined flexural and direct tensile stress is inevitable.

(ii) Longitudinal crack slab more than one lone wide is also inevitable 

 

  DOWNLOAD THE COMPLETE PROJECT

INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!