ENERGY OPTIMIZATION AT GSM BASE STATION SITES LOCATED IN RURAL AREAS
The work presented in this thesis explored the potential of using a mix of renewable energy resources (hybrid power systems, HPSs) to generate electricity that meets power needs of mobile base stations at rural areas in Nigeria. The study was based on theoretical mathematical modeling and simulation using the hybrid optimization model for electric renewables (HOMER) software. A sample of eight hypothetical off-grid remote telecommunication base station (BTS) sites at various geographical locations in Nigeria was used for the study. These locations include: Abaji (Abuja, FCT), Nkanu-West (Enugu), Ikwerre (Rivers), Nembe (Bayelsa), Mopa-Muro (Kogi), Kauru (Kaduna), Guzamala (Borno), and Tureta (Sokoto), and were selected to reflect the various climatic conditions in Nigeria. Eight different combinations (HPS options) of four energy resources [small-hydro power (SHP), wind turbine generator, solar photovoltaic (SPV) and diesel generator (DG)] were studied and compared for each of the eight selected BTS sites. These are: Hybrid (Solar, Wind & Hydro) + DG; Hybrid (Solar & Hydro) + DG; Hybrid (Wind & Hydro) + DG; Hydro only + DG; Hybrid (Solar & Wind) + DG; Solar only + DG; Wind only + DG. Total Net Present Cost (NPC) and total CO2 generated are used as indices for measuring the optimization level of each energy solution, and the option with the highest optimization value is considered to be the best energy solution for that base station site. The quantitative results of the study (as reported here) show that the hybrid power system can be more cost-effective and environmentally friendly in providing energy to BTS sites than diesel generators. The results also show that there is no general least-cost option for powering GSM base station sites at different locations. It all depends on climatic conditions and available renewable energy resources. A major contribution of this work is the demonstration (by these results) that it is possible to develop an optimized energy map for appropriate locations of GSM Base Station sites in Nigeria, both as a design guide for network operators and for the formulation of energy use policies by the national telecommunications regulatory authority (the NCC). One of such policies could be the requirement that any network operator intending to site a base station in any location should first produce an optimized energy feasibility study of the location before an approval would be granted.
CHAPTER ONE
INTRODUCTION
1.1 Background to the Study
Communication services have faced several challenges with the increasing spread of wireless voice and data signals into remote areas [1]. Power supply is one of the critical challenges the telecommunication operators confront in deploying their networks. This challenge is readily overcome in the developed countries as a result of well-developed power infrastructure. In the developing world, where national electricity grid exists, it is always the energy solution of choice for powering Base Transceiver Stations (BTSs). Unfortunately, it is not always reliable and has limited coverage. This is complicated in developing countries like Nigeria as mobile communication extends more and more into rural areas outside the reach of national grid. The electrification by grid extension or secondary power station can only reach a small minority of the population
How do I get this complete project on ENERGY OPTIMIZATION AT GSM BASE STATION SITES LOCATED IN RURAL AREAS? Simply click on the Download button above and follow the procedure stated. |
I have a fresh topic that is not on your website. How do I go about it? |
How fast can I get this complete project on ENERGY OPTIMIZATION AT GSM BASE STATION SITES LOCATED IN RURAL AREAS? Within 15 minutes if you want this exact project topic without adjustment |
Is it a complete research project or just materials? It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data |
What if I want to change the case study for ENERGY OPTIMIZATION AT GSM BASE STATION SITES LOCATED IN RURAL AREAS, What do i do? Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
How will I get my complete project? Your Complete Project Material will be sent to your Email Address in Ms Word document format |
Can I get my Complete Project through WhatsApp? Yes! We can send your Complete Research Project to your WhatsApp Number |
What if my Project Supervisor made some changes to a topic i picked from your website? Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
Do you assist students with Assignment and Project Proposal? Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
What if i do not have any project topic idea at all? Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373 |
How can i trust this site? We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe! |