Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION.

Format: MS WORD  |  Chapter: 1-5  |  Pages: 65  |  2395 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION

 

CHAPTER ONE

INTRODUCTION

A quality control system in production management is a qualitative technique with strong financial implication having direct relationships with production, marketing, purchasing and financial policies. Also, it is a system used in the management of manufacturing held by any organization as it concern addition to, storage and removal from the trading organization with appropriate record keeping. S.E.D.I. Ltd, Enugu as an assembly plant maintains a large amount of stick vehicle spare parts which are imported from any of her vendor, Viz:- MBAG-Mercedes – Benz AG Germany, MBBRAS-Mercedes-  Benz Brazil or MBE-Mercedes-Benz Espana for the production line or sales to distributions or authorized agents/dealers. These stocks are held for various reasons among which are:

(a)To ensure unit sufficient goods are available to meet anticipated demand.

(b) To provide a buffer between production processes. This is applicable to work in progress stocks effectively decouple operation.

(c)  To meet possible shortages in the future.

All these spare part, which may similar menu by description, varies greatly among themselves depending on the type of model of vehicle using them. Thus, the management and operation of stores functions and the control of stock can only be performed in an efficient manner when there is an appropriate means of upturning and storing information and the facility of the analysis and use of this information. In the light of the above S.E.D.I. Ltd Enugu maintains a visible records system return to as KARDEX, As a prerequisite  in any quality control system ANAMCO Ltd maintains a peculiar but unique  coding system such that all the numerous spare parts are each uniquely  coded and identified for accurate and specific information on them.

The operation of the KARDEX was of ten prove to redundancy or duplication of items when ever there is mistitling, it requires a lot of paper work with their possible variation or discrepancies during documentation; it involves, so many people thereby wasting a lot of man hours; increased cost of procurement storage of non-moving or obsolete items leads to customer dissatisfaction due to time wasting and unavailability of information. Thus, the efficiency of the system is greatly depending on human factor and as such accuracy. So, it is an attempt to rectify and modify the above inadequacies that we have decided to develop and implement an integrated computerized stock control system so as to maximize the operation efficiency, ensure customers satisfaction based on quick services, minimize the non-hour requirement involved reduce the running costs, guarantee accuracy and at the same time generate report that assist management in her decision making as it concerns planning organizing and controlling.

1.2  BACKGROUND OF THE STUDY (MB-S.E.D.I LTD ENUGU)

Sequel to the recommendation of the fourth (4th) National Development plan in 1975 to increase the number of automobile plants in Nigeria in order to address the problem of transportation a Mercedes Benz plant was chosen. Other reasons for establishing the plant being to

(a)  Transfer of technology                       

(b) Manufacture and assembly of indigenous man-power training 

(c)  Modernisation of industrial workers and       

(e) Diversification and rapid industrialization of the Nigeria Economy.

MB-S.E.D.I. Ltd, as it is famously known and called means Mercedes-Benz Anambra Motor Manufacturing Company Limited Enugu. The company is strategically located along IBB-Airport Link Road Enugu Industrial Layout Enugu. The pliant is a joint owned by the government and people of the Federal Republic of Nigeria and Daimier-Benz AG of Germany. Their share equity is in the ratio of 60% to Nigeria and 40% to Daimier-Benz AG Germany. Therefore Mercedes-Ben S.E.D.I.  Ltd. Enugu was licensed to manufacture Mercedes-Benz commercial vehicle in Nigeria. The company was incorporated in Nigeria as a Private Limited Company.

On the 17th day of January 1997. On the 12th day of May 1978, its foundation stone was laid by Colonel John Atom Kpera then the military Governor of the thin ANAMBRA STATE (NOW, ENUGU and ANAMBRA). Later, on the 8th day of June 1980 Mercedes-Benz ANAMCO LTD, wad commissioned by Alhaji; Shehu Usman Aliju Shangari, then the President Head of State Commander in Chief of the Nigeria Armed forces S.E.D.I. LTDM commenced production officially on January 1981, ever since the n her services work has spread throughout Nigeria. The company uses foreign and local contents in the manufacture of the Mercedes-Benz commercial vehicles.

1.3   STATEMENT OF THE PROBLEMS

It is a common knowledge that decision makers in any organization requires, Information to perform the great functions of planning. Therefore, it is necessary to discover an adequate means of making the information available in making everyone concerned. This is because, for decision to be made correctly. The information must be consistent, accurate, time and reliable. Thus, this work is aimed at developing and implementing an integrated computerized quality control system in production of an automobile firm (Case study S.E.D.I Enugu Nigeria

1.4       PROBLEMS OF THE STUDY

(1) The problem encountered when carrying out this study are that obtaining this necessary information from the staff of S.E.D.I. was not easy because some of their information are regarded as company secret.   

(2) There is competition of the way few pass personal computer, which has DBASE 111, plus application because many students make use of them in missing their project program.  

(3) Production of spare part on manual approaches has been very difficult.

(4) Problem of fund a lot of money is been incurred in carry out this project.

(5) There may be inadequate or not existent stock records.

(6) Obsolete items are retained in stock, which makes in difficult for one to know the overall items in stock.

1.5   THE PURPOSE OF THE STUDY

The objectives of this work include the following

(1) To ensure appropriate stock quality control coding with a view to minimizing stock redundancy or duplication inherent in the manual system of quality control system in production.

(2) To ensure operational efficiency thereby martimasing the customer services level with increased accuracy.

(3)  To generate consistent accurate timely and reliable reports that consist the management in her decision as it affects the stock and the organization for affective planning, organization and controlling.     

1.6   SCOPE

Even though that Mercedes-Benz S.E.D.I. Ltd is the case study with her diverse inventories this work is only continued to the  administration of spare parts (finished good type of inventory) as it concerns ordering, receipts, sales and reports. Therefore, it excludes the W.I.P work-in-progress) and other forms of quality stock control. It also excludes other automobile firms.

1.7   AIMS AND OBJECTIVES

The aims and objectives of this work is that when the system becomes operational, it will:

(1)  Permit on-line time data storage and information retrieval.

(2) Save the production time per section and as such ensure customer satisfaction. 

(3)  Increase the operation efficiency and accuracy

(4) Reduce stock redundancy or duplication inherent in manual system.

(5)  Reduce the operational cost.

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION.

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION. INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION.?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION.?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION., What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!