Select Currency
Translate this page

ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM

Format: MS WORD  |  Chapter: 1-5  |  Pages: 79  |  2683 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM

 

ABSTRACT

This study was carried out to assess environmental impacts of a proposed tankfarm which is to be situated at the Olokola Free Trade Zone in Ondo State (OKFTZ). It encompasses various field sampling which includes soil, air and noise sampling taken from the proposed site. These samples were tested in the laboratory for parameters such as Total Hydro Carbon, pH values, Total Mean Percentage of Organic Matter, Heavy Metal Investigation, cation concentration. The Total Hydro Carbon which ranges from 4.8 to 33.0 milligram per kilogram (mg/kg) in the wet season and 4.0 to 78.5 mg/kg for dry season. The THC is reflective of an unpolluted environment, and it is widely accepted that soils with a hydrocarbon level below 100 mg/kg are considered unpolluted. Heavy metals investigation showed that Iron had the highest mean concentration (2213mg/kg) followed by Zinc (4.82mg/kg) and Copper (3.78mg/kg) for dry season while for wet season, Iron had 2039mg/kg followed by Zinc (8.68mg/kg) and copper (3.0mg/kg). The concentration of the monovalent cation in the soils was generally high. Sodium (Na) concentrations ranged between 2,136 and 7,341mg/kg in the wet season and 6,175 and 10,308 mg/kg in the dry season while potassium (K) ranged between 0.09 and 0.15 mg/kg in the wet season and 0.04 and 0.45mg/kg in the dry season. The high sodium content could be attributed to the proximity of the study area to the ocean.  Suspended Particulate Matter Levels for Wet and Dry Season on shows that there are more suspended particulate matter in the dry season as the result indicated a value of 196 µg/m3 against 64µg/m3 in the wet season. Comparing these findings with EGASPIN guidelines for national air quality standards, more air quality monitoring is needed during the dry season as it reaches a high of 196 though it is still within the EGASPIN (Environmental Guidelines and Standards for Petroleum Industries in Nigeria)  limits. Noise measurements showed that the measured levels varied significantly in the different locations monitored and ranged from a low of 55.2dB to a high of 66.7dB, for the dry season and 52.7dB to a high of 67.9dB, for the wet season as compared to the World Bank standard of 45 dB(A) for residential areas during the daytime. It is recommended that environmental performance be monitored regularly to ensure compliance and those measures to be taken where necessary. The OKFTZ site is generally suitable for the proposed bulk fuel storage facility and all environmental risks can be minimized and managed through implementing preventative measures and sound environmental management systems.

 

CHAPTER ONE

INTRODUCTION

Environmental Impacts Assessment is an assessment or the analysis of the possible positive or negative impact that a proposed project may have on the environment together consisting of the environmental, social and economic aspects (International Association of Impact Assessment, 2002). Environment Impact Assessment or EIA can also be defined as the study of predicting the effect of a proposed activity/project on the environment. A decision making tool, EIA compares various alternatives for a project and seeks to identify the one which represents the best combination of economic and environmental costs and benefits. EIA systematically examines both beneficial and adverse consequences of the project and ensures that these effects are taken into account during project design. It helps to identify possible environmental effects of the proposed project, proposes measures to mitigate adverse effects and predicts whether there will be significant adverse environmental effects, even after the mitigation is implemented (IAIA , 2002). By considering the environmental effects of the project and their mitigation early in the project planning cycle, environmental assessment has many benefits, such as protection of environment, optimum utilization of resources and saving of time and cost of the project (Wikipedia, 2013).  

Environment refers to the totality of natural resources including the intricate interrelations among living and non living things which constitute the ecosystem and biomes (Randall et al; 1987). Webster’s new collegiate dictionary (2012) defined environment as the aggregate of all the external conditions and influences affecting life and development of organisms. Sada and Odemerho (2001) conceive environments as a system within which living organisms interact with the physical elements. Environment is a common property not only of existing stakeholders but also of the future generations (Okonkwo, 2004) A Tankfarm is also known as an oil depot or oil terminal, a facility for storage of petroleum products or petrochemical products from which these products are usually transported to end users for further storage facilities. An oil tankfarm typically has tanks or either above or under the ground and gantries for the discharge of products into road tankers or other vehicles such as barges or pipelines. Tankfarms are usually situated close to oil refineries or locations where marine tankers or vessels containing products discharge their cargo.

A Tankfarm is a comparatively unsophisticated facility in that (in most cases) there is no processing or other transformation on site. The products which reach the depot from refinery are in their final form suitable for delivery to customers. Modern Tankfarms comprise the same types of tanks, pipelines and gantries as those in the past and although there is a greater degree of automation in site, there have been significant changes in depot operational activities over time (Wikipedia 2013). One of the key imperatives of Health, Safety and Environment (HSE) is that the operators of a Tankfarm must ensure that products are safely stored and handled. There must be no leakages which could damage the soil or the table water and these forms of undesirable activities gives rise to the analysis of some predictable and unpredictable impacts of Tankfarm to the existing environments and thus brought about the delivery of this project.

  DOWNLOAD THE COMPLETE PROJECT

ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ENVIRONMENTAL IMPACT ASSESSMENT OF A PROPOSED TANKFARM, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!