Select Currency
Translate this page

THE EFFECTS OF CONTAMINANTS ON THE FLOW OR RHEOLOGICAL PROPERTIES OF OIL BASED MUD

Format: MS WORD  |  Chapter: 1-5  |  Pages: 79  |  2659 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION

 

1.1     Background of Study

Drilling for oil and gas with a drilling mud began many years ago in the 18th century. The first reported use of a drilling fluid was noted in France in 1845, when water was pumped down a hollow boring rod, while drilling water wells to bring the cuttings from the bottom of the well to the surface. (Ikeh, 2014)

 

Through the 1920's Iron oxide and Barium Sulphate (Barite) was used to increase the density of the drilling mud, thus preventing entry of the formation fluid into the borehole. The use of bentonite in 1930's to suspend Barite formed the basis for today's large commercial drilling mud industry. (Evabeta, 2004)

 

The term "drilling fluid" includes air, gas, water and mud or could either be a combination of two or all the above. The common type of fluid most often used in mud suspension of solid clay is a liquid and emulsion mud (suspension of solid and droplets of liquid). The drilling fluid is a term that comprises all the components of clay and additives suspensions used to effect the removal of rock cuttings from the subsurface (bottom hole) to the surface while drilling.

 

Thus, in other to enhance the drilling operation, the selected drilling mud must perform certain functions to avoid delay in operation and occurrence of associated drilling problems. Some of these functions are highlight below.

 

1.1.1  Functions of drilling fluids

 

Lubricate  the  drill  bit,  string,  bearings,  mud  pump  and  drill  pipe,  particularly  as  it  wears against  the  sides  of  the  well  when  drilling  deviated  wells  around  corners.  Clean  and  cool  the  drill  bit  as  it  cuts  into  the  rock. Lift  rock  cuttings  to  the  surface  and  allow  cuttings  to  drop  out  in  the  mud  pit  or  shakers  to prevent  them  re-circulating.

  IV.            Suspend cuttings and weighting material when circulation is interrupted

Protect the formation from caving Provide  information  to  the  drillers  about  what  is  happening  down  hole  by  monitoring  the behavior,  flow  rate,  pressure  and  composition  of  the  drilling  fluid. Prevent  well  blow-out  by  including  very  heavy  minerals  such  as  barite  (weighing  agent)  to counteract  the  pressure  in  the  hole  (reservoir  pressure). Drilling  mud  helps  in  suspension  of  drilling  assemble  and  casing,  delivery  of  hydraulic energy,  being  a  suitable  medium  for  logging  and  to  being  environmentally  acceptable.

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECTS OF CONTAMINANTS ON THE FLOW OR RHEOLOGICAL PROPERTIES OF OIL BASED MUD

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE EFFECTS OF CONTAMINANTS ON THE FLOW OR RHEOLOGICAL PROPERTIES OF OIL BASED MUD INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE EFFECTS OF CONTAMINANTS ON THE FLOW OR RHEOLOGICAL PROPERTIES OF OIL BASED MUD?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE EFFECTS OF CONTAMINANTS ON THE FLOW OR RHEOLOGICAL PROPERTIES OF OIL BASED MUD?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE EFFECTS OF CONTAMINANTS ON THE FLOW OR RHEOLOGICAL PROPERTIES OF OIL BASED MUD, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!