Select Currency
Translate this page

THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 50  |  2283 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA

 

CHAPTER ONE

INTRODUCTION

1.1   Background of the Study

In general, the environment provides all life support system in the air, water, on land and in the forests (Glasson et al; 1999). However, the Nigeria environment generally, and Benin City in Edo State in particular, today presents a grim litany of woes across the length and breath of the country. Environmental problems therefore manifest as a result of different land use activities of man to earn his living and his livelihood. In the urban land use, deforestation has become a peculiar problem in Nigeria and Benin City in particular, which results from uncontrolled logging and tree felling for the purpose of urban development. In many parts of the Southern States of Nigeria, this goes with its loss of precious biological diversity. Afolabi (2005) noted that the environment is itself, the point in which one is found at a time, the surroundings, the more distant places, other earth components, conditions, prospects and problems which account for its flourishing or otherwise. Flooding can be described as high water stage in which water overflows its natural or artificial banks on the normally dry land, such as stream or river  inundating its adjacent lowlands.

In this regard, geophysical hazards can be wrought on civil artifacts, facilities, other aspects of human activities and occasionally loss of human lives may be incurred, (www.vision 2010.org, 2009).  Adebayo (1987) recognized four major mechanisms for the increase in the flooding potentials of urban catchments. The first one is increasing the percentage of impervious surface that infiltrates in the ground and increase in the total volume of runoff. Secondly, paving, straightening or otherwise improving stream channels, all of which reduces the time lag between rainfall and channel runoff. Thirdly, landscaping and subdivision of land into building sites, a process that shortens the distance over which the water flows before reaching drainage way and hence reduces the time lag between rainfall and channel runoff. Lastly, filling in and human settlement on flood plains, which reduces the space available for storing flood waters. African Research Review Vol. 4(1) January, 2010. Pp. 390-400.

The phenomenon of flood hazards, according to Ward (1978), comprises several aspects including structural damage, loss of lives and properties, disruption of socio-economic activities including transport, communication and the destruction of agricultural land. According to Ayoade (1979), floods are natural phenomena rather than natural disasters. They, like drought, form part of the normally occurring range of stream flow conditions. Flood disasters are man-made as they occur when and where man puts himself at risk by developing and occupying floodable areas, there by causing damage, congestion and hold ups to the transportation networks in the area. Man, therefore, develops and occupies flood plains, at risk of flooding, out of ignorance or for economic reasons.

Statement of the Problem

The basic cause of urban flooding is man’s modification of the basin network and channels characteristics during the process of settlement on the particular flood plain (Adeleke, 1978). Natural surfaces are replaced by more impermeable roads and concrete which have very low infiltration capacity. The hydrological consequences of this is that water which should normally infiltrate into the ground or be intercepted by vegetation and then delay for some time before running, would be immediately available for runoff. This considerably decreases the lag time between rainfall and storm water and increase the runoff with concomitant increase in peak discharge and total volume of runoff (Adeleke, 1978).

Aim and Objectives of the Study

The aim of this study is to investigate the propelling environmental mechanisms of flooding prevalent in the Benin City Metropolis as they affect transportation land use. The specific objectives of this study are to:

i. Identify the causes of flooding prevalent on transportation land use in Benin City.

ii. Examine the environmental problems of flooding on transportation land use in Benin City.

iii. Recommend possible control measures on the problems of flooding on transportation land use in Benin City.

Hypotheses

i. There is no significant difference between the causes of flooding on transportation land use in the Benin City Metropolis.

ii. There is no significant difference between the environmental

problems of flooding on transportation land use in the Benin City Metropolis.

The Study Area

Benin City has a history of being one of the foremost destinations of Europeans during their exploration of African continent many centuries ago, (www.edo-nation.net, 2008). Some of her flash points have remained enviable tourist attractions for the state. Benin City is the capital of Edo State. Benin City lies approximately between latitude 60 201 North of the equator and longitude 50 371 East of the Greenwich meridian. The distinct relief regions in Benin City are the swamps/creek. In the Benin low land is found sandy coastal plain and alluvium clay with some hills in the East. River Osse, Orhionmwon and Ikpoba drain the area.

Soil types in the Benin low land ranges from loose poorly productive sand in the South-east to fertile clayey soil in the North-east close to the Niger, the Osse and Benin drainage basins have alluvial and hydromorphic soils. The climate of Benin City is typically tropical with two major seasons. The wet (rainy) and the dry seasons. The wet season lasts from April to November and the dry season from December to March. The natural vegetation of Benin City consists of tropical rainforest in the Benin low lands. Human interference has, however, led to the presence of plantation for rubber and oil palm as well as forest reserves.

The main ecological problem in Benin City is flooding, soil erosion and scarcity of water and out crops of basement rocks. Flooding and erosion are acute in Oredo, Egor and Ikpoba-Okha local government area of Benin City. Rainfall and the removal of vegetal cover and unplanned land use development are the main cause of the problem  Transportation in Benin City is mainly by road and to some extent by air and water. On road transportation, Benin City is transverse by a network of Federal (Trunk A), State (Trunk B), township and rural earth roads (Benin City 2005).

  DOWNLOAD THE COMPLETE PROJECT

THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE ENVIRONMENTAL IMPACT OF FLOODING ON TRANSPORTATION LANDUSE IN BENIN CITY, NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!