Select Currency
Translate this page

MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN

Format: MS WORD  |  Chapter: 1-5  |  Pages: 63  |  1542 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN

 

CHAPTER ONE

INTODUCTION

1.1     BACKGROUND OF THE STUDY

Nigeriais blessed by nature with a lot of natural resources amongst which, water is one of them. WHO (1976) confirmed thatNigeriawas blessed with abundant water resources, the excess of which has been floods and erosion in many parts of the country. However, the distribution of this water resources was not evenly spread over the country. Life and other agricultural activities every year irrespective the drought that frequently occur in the northern part of the country of course man had been obtaining water for domestic and other purposes since man’s creation. Water supply can therefore be said to be as old as man itself.  Inspite of the availability of this water resources, WHO (1976) maintained that its supply to be majority of the population especially the rural area is every much inadequate.

Ilo (1993), affirmed that whenever a communally rural or urban exists, that these is already a supply of some sort, otherwise, there would not bare been people residing.  He noted that rural water supply covers a wide category of schemes.  Anambra state of Nigeria Edict No. (1978) simply defines rural water supply as a wide category of schemes ranging from a well width buckets supplying water to a few isolated huts to river pumping schemes from such or simple treatment as communal stand pipes to tap in individuals homes and provisions for livestock and vegetable garden Ilo (1973) however stated that various traditional means of obtaining water has been developed by individuals and communities for many centuries and that some of these systems were very much in use by various communities both rural and urban, in Anambra State and indeed, Nigeria he however maintained that the rural water supply may be inadequate in quantity.  Dangerous to health, inconvenient and unreliable but basically “water is there and is being used”

The United Nations Economic Commission for African (1973) confirmed that it was only about 20% of the populations ofNigeriathat have access to potable water supply.  It further stated that have access to people are those that are living in the urban and semi-urban areas of the country and that even the privilege places that have access to such facilities were not being served sufficiently.  This is the need for the provision of adequate water supply and sanitation is highly appreciated.  And this has promoted the choice of the topic on the management and operational problems of rural water supply inNigeria.  A case study of water corporationEnugu, with a view to recommend solution which if accepted would help to solve these and as well, facilitate to the alleviation of the suffering of the people.  Water corporation was established as a parastatals under Anambra State of Nigeria Edict N0. 16 of 1978.  the corporations was originally charged with the statutory responsibility of supplying drinking water to all the urban as well as the rural communities of old Anambra State.  It was formally the water section of the then East Central State Ministry responsible of works and housing.  The General Manager is responsible for the day to day running of the corporation, while the board of directors the commissioner of the controlling ministry in the absence of the governing board, is responsible for policy matters only operating eleven (11) zonal offices in the state including Enugu he stated that the corporation is principally maintained from government subventions and budget allocation for capital projects and from internally generated revenues, water tariffs, sale of metres fees etc for its day to day operations.

1.2   STATEMENT OF THE PROBLEM

Enugu as a growing industrial and commercial town has been without adequate supply of potable water.  This potable water supply inadequacies being experienced in the rural communities ofEnuguhave been brought about by many factors.  Despite the huge sums of money being sunk into these rural water supplies, yet water is still very inadequate. It has been difficult for the society to understand the extent of the aims and objectives for setting up the water corporation. Another problem is weather the resources both human and material are adequate. The attitude of water consumers has also constitute a problem. The instability in government constant changes in leadership is another problem. That has been a problem to understand that of the rural consumers.

1.3   OBJECTIVES OF THE STUDY

The purpose of this research project on the management and operational problems of rural water supply in Nigeria.  A case study of water corporation Enugu to investigate the followings.

1.  To extent to which the aims and objective of rural water supply programme are being achieved in Nigeria with particular reference to Enugu rural communities.

2.  To find out the extent of adequacy and suitability of materials and human resources for change in rural water supply programme in Enugu.

3.  To ascertain the extent to which the changes in government and leadership affect the steady water supply.

4.  To find out the extent to which the management and operational problems affect the functionality of the rural water supply service in Nigeria with respect to Enugu.

1.4    RESEARCH QUESTIONS

To guide this study five research questions were formulated, they include the following.

1.  What are the characteristics of rural water staff and socio-economic characteristic of rural household?

2.  To what extent are the aims and objectives of rural water supply programme being achieved in water co-operation?

3.  How adequate and suitable are the materials and human resources for change in rural water supply programme in Enugu?

4.  To what extent does the management and operational problems affect the functionality of rural water supply services in Enugu?

5.  To what extent does the changes government and leadership affect the management of water corporation Enugu?

1.5       SIGNIFICANCE OF THE STUDY

The issue of the benefits in effective and increased water supply in the rural areas of Enugu cannot be overemphasized as it has been stated earlier.  Inadequate water supply coupled by sanitation had been the bare of rural communities in Enugu.

1.  The growing industrial and commercial town of Enugu has been without adequate supply of potable water since the collapse of the two boreholes at Umuokpu pumping station.

2.  It is however hoped that the research the management and operational problems of rural water corporation Enugu will provide information, which if utilized, will help in finding solution to the above problem.

3.  The information gathered from this study is also expected to serve as a basic for social policy decisions which will enable the government to designs specific policies that will be beneficial to the community and will improve and enhances the efficiency of water corporation Enugu.

4.  It is also hoped that participation in this research project will help to burden the knowledge of the researcher, in the field of management & operation. 

  DOWNLOAD THE COMPLETE PROJECT

MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for MANAGEMENT AND OPERATIONAL PROBLEMS OF RURAL WATER SUPPLY IN NIGERIAN, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!