STATISTICAL ANALYSIS OF TRAFFIC CONGESTION IN OSHODI-APAPA AXIS OF LAGOS
CHAPTER ONE
INTRODUCTION
1.1. Background of the study
Traffic congestion in commercial cities in Nigeria has been a cause for concern for every well-meaning Nigerian who craves for infrastructural development and maintenance. The continuous road traffic congestion in Nigerian cities especially in Lagos which started from the 1980s immediately after Udeoji award which enhanced household income and resulted to increased desire for both private and commercial vehicle ownership is intensifying on daily basis. The daily movement of people in Nigerian cities is becoming more difficult and complex.
Lagos state being the most populated state in Nigeria according to the national population commission has been engulfed in traffic congestion this may be due to population explosion and urban migration which has increased the pressure on the available infrastructure. This is reflected in the increasing bumper-to-bumper traffic being experienced in the major cities during the morning (7:00am – 9:00am) and afternoon (3:00pm – 6:00pm) peak hours (Okpala, 1981:46). In some cases, such as in Lagos, road traffic congestion is being experienced throughout the day from 8:00am – 9:00pm which can even extend into the dead of the night on occasions. In Lagos state especially, it is not uncommon for commuters to spend more than two hours enroute to work, school, market, hospital etc. or back home even when to and fro distance is not much. According to Okpala (1998: 23), the situation has become so common that it even appears that traffic hold-ups are becoming acceptable excuses for late attendance to work or even formal and informal meetings. This malady in most of the Nigerian cities has been causing people a lot of concern (Oyefesobi, 1981:35). It is posing formidable challenges to both state governments, Local government Councils, researchers and particularly the city residents.
1.2. Statement of the general problem
The search for an enduring solution to the traffic problems will necessarily commence with thorough investigation that will unveil the factors responsible for such problems. This is what this study intends to do with particular reference to Oshodi-Apapa express way Lagos.
1.3. Objectives of the study
This study aims at the following:
Ø To provide this missing link by way of making good attempt at identifying the factors which are responsible for traffic problems in Oshodiapapa express way.
Ø To recommend ways of easing traffic congestion in Lagos
Ø To examine the major causes of road traffic congestion in Lagos
1.4. Scope of the study
This study is on statistical analysis of road traffic congestion at the OshodiApapa express way Lagos state.
1.5. Research questions
Ø What are the major causes of traffic congestion
Ø What can be done to ease traffic congestion in Lagos?
Ø Is there a relationship between traffic congestion and increase in crime rate in Lagos?
1.6. Research hypothesis
H0: There is no significant relationship between crime and traffic congestion in Oshodiapapa expressway
H1: There is a significant relationship between crime and traffic congestion in Oshodiapapa expressway
1.7. Definition of terms
Ø Trafficthe movement of vehicles, ships, persons, etc., in an area, along astreet, through an air lane, over a water route, etc
Ø Crime:an illegal act for which someone can be punished by the government
REFERENCE
Adedimila, A. S. (2006), “Towards Improving Traffic Flow in Lagos,” Transportation in Nigerian National Development, Proceedings of A National Conference
Adenle, J. A. (2009), “Factors Militating Against Free Flow of Traffic in Metropolitan Lagos,” Transportation in Nigeria National Development, Proceedings of A National Conference, Onakomaiya, S. O. and Ekanem, N. F. (eds), NISER Publications, Ibadan, Nigeria. Pp 379 -399.
Creighton, R. L. (1999), Urban Transportation Planning, Urban, University of Illinois Press.
Ibrahim, I. D. (2004), “Problems of Journey to Work In Nigeria, A Case Study of Zaria,” Paper presented during 35th Annual Conference of Nigerian Institute of Town Planners, pp 20 – 27.
Nayer, K. W. (1978), The Urban Transportation Problems, Harvard University Press Cambridge, Massachusetts.
Okpala, D. C. I. (1998), “Urban Traffic Management in Nigerian Cities: The Necessity for Mass-Transit Priorities,” Transportation in Nigerian National Development, Proceedings of A National Conference, Onakomaiya, S. O. and Ekanem, N. F. (eds), NISER Publications, Ibadan, Nigeria. Pp 337 – 360.
Omo, A. (2004), “LanduseAnd Traffic Management In Nigeria Urban Centres: A Case Study of Benin City,” 35th Annual Conference of Nigerian Institute of Town Planners, pp 13 – 19.
Oyefesobi, S. O. (1981), “Measures to Improve Traffic Flow and Reduce Road Accidents in Nigeria,” Transportation in Nigerian National Development, Proceedings of A National Conference, Onakomaiya, S. O. and Ekanem, N. F. (eds), NISER Publications, Ibadan, Nigeria. Pp 400 – 405.
Orioke, J. M. A. (1981), “Traffic Education and Traffic Flow in Ibadan City,” Transportation in Nigerian National Development, Proceedings of A National Conference, Onakomaiya, S. O. and Ekanem, N. F. (eds), NISER Publications, Ibadan, Nigeria. Pp 406 – 415.
How do I get this complete project on STATISTICAL ANALYSIS OF TRAFFIC CONGESTION IN OSHODI-APAPA AXIS OF LAGOS.? Simply click on the Download button above and follow the procedure stated. |
I have a fresh topic that is not on your website. How do I go about it? |
How fast can I get this complete project on STATISTICAL ANALYSIS OF TRAFFIC CONGESTION IN OSHODI-APAPA AXIS OF LAGOS.? Within 15 minutes if you want this exact project topic without adjustment |
Is it a complete research project or just materials? It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data |
What if I want to change the case study for STATISTICAL ANALYSIS OF TRAFFIC CONGESTION IN OSHODI-APAPA AXIS OF LAGOS., What do i do? Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
How will I get my complete project? Your Complete Project Material will be sent to your Email Address in Ms Word document format |
Can I get my Complete Project through WhatsApp? Yes! We can send your Complete Research Project to your WhatsApp Number |
What if my Project Supervisor made some changes to a topic i picked from your website? Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
Do you assist students with Assignment and Project Proposal? Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
What if i do not have any project topic idea at all? Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373 |
How can i trust this site? We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe! |