Select Currency
Translate this page

A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 60  |  2654 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA

 

CHAPTER ONE

1.0     INTRODUCTION

The dictionary definition of trends simply means “to move or extend in a specific direction” (Long Man Family Dictionary) also trends simply means “a general direction in which a situation is changing or developing” (Advance Learner’s Dictionary). Leaning on, this definition of “trends” thus the subject matter “trends in building cost in Nigeria” can be described as a way to move or extend in a specific direction of building cost in Nigeria. This trend in building cost is associated with the cost of erecting a building which includes the physical preparation and developmental cost. The construction industry is very vital to the socio-economic development of a nation, this is because the affordability or otherwise of construction affect the confidence of the citizen in their existence in any nation. One of the first and most fundamental aspect of human needs is shelter, therefore, it become necessary that the cost of constructing a given building project should be within the reach of the average citizens, (Dr. A.R Oladele 2007). Over the years, the discovery of oil in Nigeria alongside with increasing population led to the increase in the demand for building in Nigeria. Also the unscheduled changes of government in Nigeria lead to the formulation of policics from one government to the other which sometimes do not favour the construction industry. These trends in building cost are caused by the following factors which include:

Method of construction

Limited number of manufacturers of building materials

Employment of foreign expatriates

Increment of wages

Import tariff

Fuel scarcity

Bribery and corruption

Second tier of foreign exchange

These reasons mentioned above are making a tremendous contribution to the increasing building cost which in turn posing a potential blockage to the chance of the less privileged ones to own a house or building and also went further to make it difficult for them to pay rent charged by the lessor on a house. Therefore, this project is aimed at highlighting various factors that influence these trends in building cost in Nigeria. And to come up with possible solution to curtail these treads through oral interview and questionnaires with parties involved also to asses the changes within the period of ten years (10 years) (2000-2010).

1.1  STATEMENT OF THE PROBLEMS

One of the challenges faced by the construction industry in Nigeria is the fluctuation of the prices of building materials which lead to upward and downward movement of building cost in Nigeria. Most average Nigeria citizens are of low income thereby making it difficult for them to own a building if these trends are not properly study to plan ahead of time for a given project.

1.2     AIMS AND OBJECTIVES OF THE STUDY

1.2.1 Aim: The aim of this study is to access the trends in building cost in Nigeria from (2000-2010).

1.2.2 OBJECTIVES

This project has the following objectives:

To identify the behavioural pattern of building cost within a given period of time.

To determine the effects of these trends as it affect the society

To identify the causes of trends and how it can be controlled in the society.

To make probable recommendations on where appropriate.

1.3     SIGNIFICANT OF THE STUDY

To ascertain possible ways of using cost comparison of different cost of building project in Nigeria.

1.4 SCOPE AND LAMINATION

This thesis is to examine a general tendency on how cost of building changes in regards to time and in relation to plant, labour and materials.

The study is limited to the comparison of the cost of a two bedroom bungalow over a period of ten years(10yrs) through updating of some major building element obtained from bill of quantities from tender rates in relation to the trends from (2000 – 2010) using the cost index method of analysis.

1.5 METHODOLOGY

The method adopted for this thesis includes: oral interviews, questionnaires and case study of two (2) bedroom bungalow.

  DOWNLOAD THE FULL PROJECT

A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!