Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM

Format: MS WORD  |  Chapter: 1-5  |  Pages: 54  |  3964 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM

 

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND OF THE STUDY

The advent of computer Technology has brought relief to repetitive tasks and has helped in the better management and origination of data.  Information management system can be applied to any system that facilitates storage, management and retrieved of data and information required for some particular application within a computer system.  This makes it easier for data to be handled or managed. The stadium staffs have been finding it so difficult to manage information for example, in the existing system where everything is processed manually,  the operators find it difficult to store, locate or retrieve information when necessary.  Also the issue of crowd control and ticketing, which is needed in events to generate income for the sector.  Processing ticket for an event manually can be costly, time – consuming and waste ticket stock which is always encountered in some event due to the excess ticket processed manually. The computer system can be used in so many ways in the stadium, for example, crowd control, processing of ticket for an event, managing office files and so on. This work concentrates on the computerized ticket, crowd control, information management in the stadium and facility management.  With the aid of computer system, the data will be properly managed, organized and construction of a suitable program that will help in the management of stadium.  

1.2     STATEMENT OF THE PROBLEM          

Following the problem encountered in the organization, tickets that are processed for an event and the end, there will be left over (waste ticket stock) which create loss in the finance of the stadium unable to communicate with one another in other to share information which leads to time-consuming, re-entering of information and lack of centralized system for customer information.      

1.3     OBJECTIVES OF THE STUDY          

This work is aim to reduce the work of stadium operators,  managers, and individuals.  Furthermore, the aim of this work it to:

(i)   study the present way of processing ticket.

(ii)  Design a new system that will be more convenient and efficient, which will take care of difficult encountered in the present system.

(iii)  Design a new system that will enable the organization control crowd in every events.

(iv)  Design a system that will make access to record or information easier.  

1.4     SCOPE OF THE STUDY          

There are lot of activities that takes place in the stadium an example is the processing of ticket and management of information.  This research will base on a computerized management information system in the stadium.      

1.5     LIMITATIONS OF THE STUDY          

The following constraints were experienced during the course of the research.

a   Time Constraint  Due to the shortness of the semester and other activities within the school, there was no much time to carryout more research.

b   Lack of Money  The issue of going from one place to another in search of materials relevant to the work calls the attention of monetary problems which limit the cost of this research.  

1.6   SIGNIFICANCE OF THE STUDY          

The significance of this research is to help the staffs attain excellence, accurancy, and effectiveness in the data or information with aid of an information management system.      

1.7   ASSUMPTION

The design of the system is assumed to be cost effective and beneficial to stadium management.  The design will reduce the problem facing staff or operators of the organization.  
1.8     DEFINITION OF TERMS

Data – It is a law fact or it is an unprocessed information.

Information – They are data that has been processed and ready for use.

Management – It is the bringing together of resources and people for the accomplishment of a specific goal.

Information Management – It is the organization and management of related data within a system. Information

Retrieval – It is the method used in recovering specific information.

Maintenance – It is a way of taking care of facilities in an organization

Record – It is the collection of related fields raw data from within the organization.

Input – It is the capacity or collecting of raw data from within the organization.

Output – It is the transfer of processed information to the people or activities where it will be used.

Processing – This is the converting of raw data into a more meaningful form.

Information system – It is defined as a set of interrelated components that collect (or retrieve), process, store, and distribute information to support decision making and control in an organization.

Stadium – It is a place set aside for sport activities.

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!