Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM.

Format: MS WORD  |  Chapter: 1-5  |  Pages: 51  |  1030 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM.

 

ABSTRACT

Soil Erosion is an endemic problem in different part of the world especially places where there is marks of seasonal rainfall.  This overland flow resulting  from rain splash erosion and through flow of surface, flow appear to be too extremes of a continuous sequence and is a possible condition for gully development.  In order to prevent this gully development a body must or has been established to study and check the erosion development in so many areas.  As this project tends to focus on the erosion control system in Enugu using  ministry of works as our case study.  Our limit does not extend more than Enugu, Ministry of works in the body responsible for the control of erosion in Enugu state.

 

CHAPTER ONE

INTRODUCTION

1.1  BACKGROUND TO THE STUDY

The soil particles must be detects from the parent soil mass, Agriculture which occupy over two third of the eastern region area and land mass is seriously threatened by accelerates soil erosion which is systematically reducing the land area available for agriculture.  Causes, effects and control measures are always way been the confusing part of resolving the erosion problem in the eastern region.  Erosion is of different forms the common one along our roads includes, “Gully erosion” Gully erosion occurs in areas of strong relief or loose sandy soils.  It creates deep gorges or gullies which dissect the land surface and hind movement and the cultivation of land.  It is an advanced stage of rill erosion where surface channels has been eroded to the point where they cannot be smoothed over by normal tillage operations.  Gully erosion is simply defined as the run off concentration in channels greater than rills large channels. Often, gullies can be prevented if good land conservation measures are practiced on the farm.

The U.S department of Agriculture’s Hand book #667 (AGHBK 667) in the past used “design method for Grass – lined open channel” ECMDS.  The channel protection module utilizes calculations from federal highway Administration’s Hydrallic Engineering circular #15 (HEC 15) Tractive force procedure”.  The ECMDS which stands for Erosion control material design software, provided computer – assisted selection of material for slop erosion protection and channel source resistance.  Without this checks on these types of erosion or a computer-assisted selection material for channel source resistance.  The result of the occurrence and expansion of gullies in our roads has posed the following consequences.

(1) The damage of cultivated lands: Mainly farmers relying on proceed from sale of farm products can not achieve and produce agricultural products from damaged lands and the damages the gully is causing on our roads can not be over emphasized.  It is in this quest for preventions and erosion control system, that the term “A computerized erosion information stem” become paramount.  The system utilizers design procedures from the erosion control Technology council to correct failure.  Criteria bases on lining degradation and soil loss.

(2)  Accounts for differing vegetation growth habits and densities.

(3)  Accounts for differing soil ero dibility factors.

(4)  Build a web-base erosion control information system

STATEMENT OF PROBLEM

The existing system in the ministry of works has been proven to be the major hindrance to effective erosion control.  From a business and management perspective, information system are far more than just import-process-output machines operating in a vaccum.  The problem of the existing system as observed was lack of computerized processing, in the area of keeping record.  Record keeping in the ministry is based on manual systems.  It was quite alarming that at this very stage of it revolution I couldn’t observe any computer system readily available to support their services.  The knowledge workers was ingnonnt about the usefulness of the computer systems because they are not computer literate.  In the existing system frequent misplacement of vital information soften from the site.  No quick and timely study poor communication for contract bids as this only done on news paper instead of web-sites and other on-line marketing approach.

PURPOSE OF THE STUDY

This study became very important when I observed that ministry of works has really lost in the modern system running an organization.  Information systems are part of organization.  Indeed, for some companies or credit reporting firms, without the system there would be business.  The way elements of an organization are composed of different level and specialities. Their structure reveals a cleare – cut division of labour. owing to the fact that ministry of works is currently running on manual system of record keeping and poor information display of contract bids for erosion problems.  I became so interested in the ministry could be revived to meet up with modern day system of organization management.  So the essence of the new system is to introduce IT application in the area of erosion control approach.

SCOPE OF THE STUDY

The scope of this project is limited to erosion control information.  In order to provide complete channel protection, a turf reinforcement (TRM) must function to provide effective erosion control and turf reinforcement.  Through the three phase of a reinforced vegetative channel lining’s development.  In phase 1 the  TRM must control soil and seed loss immediately after installation to ensure the successful development of a permanent vegetative stand.  In phase 2, defined as the period of time from seed germination until a mature stand of vegetation is established, the matting must continue its role by supplementing the erosion protection provided by the vegetation as well as structurally reinforcing the development plants against hish shear stress water flows.  Finally phase 3, when the vegetation has become mature the matting must provide stem reinforcement and root zone protection by creating a software like that of North American Green’s Vmas3 composite turf reinforcement mats (C-TRM).

OBJECTIVE OF THE STUDY

My target in this project is to build a web-based information system that will be supported with vegetation selection modules.  The vegetation modules will utilize site specific information such as location, soil type, moisture regime and planned site maintenance to provide a list of adapted grass and legumes with corresponding seeding rates, as well as growth habits (bunch and sod farming) and longevity for each species.  The web-based information system will assist designers in selecting vegetation species well adapted to their site’s environmental conditions and erosion control.  Also to design a new system that will bring about computerized storage process, and to enlighten the knowledge workers how to implement a computerized erosion control information system

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM.

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM. INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM.?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM.?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EROSION CONTROL INFORMATION SYSTEM., What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!