Select Currency
Translate this page

IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015)

Format: MS WORD  |  Chapter: 1-5  |  Pages: 56  |  4343 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015)

 

CHAPTER ONE
INTRODUCTION
1.1   BACKGROUND TO THE STUDY
Electricity is pivotal to the economic development of nations. Its use is directly correlated with healthy economic growth (Kaseke & Hosking, 2013). Nigeria is one of the most populated countries in Africa but only about 40% of the people are connected to the energy grid. The people who actually have power experience difficulties around 60% of the time (Aliyu, Ramli & Saleh, 2013). Aliyu, Ramli and Saleh, (2013) claim that these blackouts that is occasioned by poor power generation has crippled the industrial sector. For example outages in this area of the world also have implications for the mining industry. When power fails, workers may be trapped in the mines, so as soon as there is a risk of failure the operations are such down, which leads to economic difficulties (Kaseke & Hosking, 2013).
Poor power generation also causes problems for agriculture. Most irrigation lines are run by electricity, so when the power is cut out then the crop yield decreases, (Kaseke & Hosking, 2013). Nigeria’s energy grid is arguably in crisis due to lack of development. The key to making a more reliable energy sector is to find and use a renewable energy resources, rather than simply relying on the country’s non-renewable resources for power generation. The crisis of power generation is a complex problem stemming from a variety of issues. This study will cover the impact of power generation on the economy of Nigeria between 1990 and 2015 and the effect on the people who live in Nigeria and the potential solutions to the crisis. The people in Nigeria near the oil and natural gas reserves often vandalize or steal oil because they feel like they should have a share in the oil that is coming from their area of the country (US Energy Administration, 2013). In Nigeria the shortfall of electricity leads to the overuse of generators for energy. It is estimated that about 30% of power generated is produced in this manner (US Energy Administration, 2013).
Currently the only plan the government has in place to help solve the power generation crisis is to expand the fossil fuel burning sector (US Energy Administration, 2013). Nigeria has a reputation of having one of the most corrupt governments in the world (Ejiogu, 2012). It is rich in natural resources, which should and does create billions of dollars of revenue, the production of the oil is not shared with the rest of the country. About 70% of people in Nigeria live below the poverty line and the unemployment rate is 21% (Ejiogu, 2012). Alternative forms of power generation are not used probably because of availability of oil in Nigeria, as it has the world’s seventh largest oil reserves (Ejiogu, 2012). Currently Nigeria uses four different types of energy sources for power generation and they includes natural gas, oil, hydro and coal (Aliyu, Ramli & Saleh, 2013).
The power generation sector is heavily dependent on petroleum as a method for electricity production which has slowed down the development of alternative forms of energy (Aliyu, Ramli & Saleh, 2013). Three out of the four above resources used for energy production in Nigeria are linked with increasing greenhouse gas emissions: coal, oil and natural gas, with coal emitting the worst of the three (Middleton 2013). The effectiveness of the six power generation companies (GENCOs) in Nigeria has been questioned by stakeholders in recent times. The concerned authorities has continued to blame the failure of these generation companies on the activities of pipeline vandals and other agitating groups sabotaging the efforts of government. However, all these has greatly affected the economic growth of the nation negatively. As at 1990, the generation and distribution of electricity in Nigeria is handled by the National Electricity Power Authority (NEPA).
By 1999-2005 (The advent of democratic government), an act was enacted establishing PHCN, an Initial Holding Company (IHC), as a result of Government effort to revitalize power sector. This was an intended name for privatization which was meant to transfer assets and liabilities of NEPA to PHCN. It was officially commissioned on the 5th of May 2005 and was to carry out business of NEPA which is still on. In the same vein, the National Integrated Power Projects (NIPP) was inaugurated in 2004 to be able to catalyze and fast track the upgrading of adding more capacity to the current available power generating capacity in the country. The PHCN, as a Company, was unbundled into 18 companies as follows: six (6) generating companies, one (1) transmission company (i.e. Transmission Company of Nigeria-TCN), and eleven (11) distribution companies. The generating companies are Egbin Electricity Generating Company (EEGC), Sapele, Ughelli, Afam, Shiroro and Kainji. There are also some new Independent Power Producers under the auspices of the Niger-Delta Power Holding Company (NDPHC).
The 11 distribution companies are Abuja Electricity Distribution Company (AEDC), Benin Electricity Distribution Company (BEDC), Eko Electricity Distribution Company (EkEDC), Enugu Electricity Distribution Company (EnEDC), Ibadan Electricity Distribution Company (IbEDC), Ikeja Electricity Distribution Company (IkEDC), Jos Electricity Distribution Company (JEDC), Kaduna Electricity Distribution Company (KdEDC), Kano Electricity Distribution Company (KnEDC), Port-Harcourt Electricity Distribution Company (PHEDC), Yola Electricity Distribution Company (YEDC). Currently, the Federal Government owns 100% of the transmission company, while its hold on the generating companies is 20 per cent (with 80 per cent of equity sold to private investors. In other words; the transmission company of Nigeria (TCN) is 100 per cent owned, generating companies (GENCOs) 20 per cent owned by government and 80 per cent private sector ownership. On the 30th of September 2013, the Federal Government handed over certificates of ownership to prospective owners. Since then the generation and distribution of electricity have been transferred to the private investors. On Wednesday February 12, 2014, the Nigerian Electricity Regulatory Commission at the meeting held with power generating and distributing companies in the country unanimously agreed that the Transition Electricity Market (TEM) idea should be left in the cooler for the meantime. The meaning of this is that the electricity industry in the country is believed to currently operate in the transition regime.  
1.2   STATEMENT OF THE PROBLEM
Power generation is the hub of both economic and technological development of any nation. The electricity industry in the Nigeria has gone through quite a lot of metamorphosis between 1990 and 2015. Power generation and electricity supply is a very sensitive issue with several political and economic sophistications in many countries which most of the time define the industry’s effectiveness. Thus, it has continuously drawn great attention from both the industrialists and the political class. As a matter of fact, it has become a veritable avenue to gaining more votes during elections. More important is the fact that every other sector of the economy depends on adequate supply of electricity through effective power generation.
1.3   OBJECTIVES OF THE STUDY
The following are the objectives of this study:
1.  To examine the impact of power generation on the economy of Nigeria between 1990 and 2015.
2.  To examine the level of effectiveness of the Power generating companies in Nigeria.
3.  To identify the factors limiting the adequate generation of Power in Nigeria between 1990 and 2015.
1.4   RESEARCH QUESTIONS
1.  What is the impact of power generation on the economy of Nigeria between 1990 and 2015?
2.  What is the level of effectiveness of the Power generating companies in Nigeria?
3.  What are the factors limiting the adequate generation of Power in Nigeria between 1990 and 2015?
1.5   HYPOTHESIS
HO: There is no significant relationship between power generation and economy development in Nigeria between 1990 and 2015.
HA: There is significant relationship between power generation and economy development in Nigeria between 1990 and 2015.
1.6   SIGNIFICANCE OF THE STUDY
The following are the significance of this study:
1.  The outcome of this study will educate the general public on the impact of power generation on the economy of Nigeria between 1990 and 2015.
2.  This research will be a contribution to the body of literature in the area of the effect of personality trait on student’s academic performance, thereby constituting the empirical literature for future research in the subject area
1.7   SCOPE/LIMITATIONS OF THE STUDY
This study will cover the activities of power generation companies in Nigeria between 1990 and 2015 and examining its effect on economic development.
LIMITATION OF STUDY
Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).  
Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

REFERENCES

Aliyu, A., Ramli, A., Saleh, M. (2013). Nigeria electricity crisis: Power generation capacity expansion and environmental ramifications. Energy, 61(8), 354-367. doi:10.1016/j.energy.2013.09.011
Ejiogu, O. (2012). Assessment of utilization of wind energy resources in Nigeria. Energy Policy 38 (2). Retrieved from: doi:10.1016/j.enpol.2008.10.020
Kaseke, N., Hosking, S. (2013). Sub-Saharan Africa Electricity Supply Inadequacy: Implications. Eastern Africa Social Science Research Review 29(2), 113-132.
Organization for Social Science Research in Eastern and Southern Africa. Retrieved February 21, 2014, from Project MUSE database. Middleton, Nick, 2013, The Global Casino - An Introduction to Environmental Issues, Fifth Edition, New York, NY: Routledge.

  DOWNLOAD THE COMPLETE PROJECT

IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015)

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015) INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015)?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015)?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for IMPACT OF POWER GENERATION ON THE ECONOMY OF NIGERIA (1990-2015), What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!