Select Currency
Translate this page

EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE IN SELECTED SITES

Format: MS WORD  |  Chapter: 1-5  |  Pages: 70  |  3975 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE

 

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND TO THE STUDY

The development of soil erosion began when man settled down and started turning pasture land into farmland. The intensive exploitation of the land disturbed the natural soil vegetative cover and exposed its, surface to the effect of erosive agents and to introduce such forms of agriculture that did not destroy the land the devastation of land by erosion often led to the down fall of civilization e.g in Mesopotamia Syria, China and else where. According to Robert. M. (1984), Erosion is manifested by the determination of soil surface effected by exogenous forces, especially water. Ice wind and, man as the significant anthropogenic factor. The disturbance of soil surface is accompanied by the removal of the detached soil particles by the force of kinetic energy of some of the erosion agents, namely water and wind and the deposition of this matter with a decrease in this energy. Erosion is caused by surface num off and result complex natural process. Water erosion is caused by precipitation. Areas with a low precipitation usually have a small surface num off because precipitation water infiltrates into the soil is consumed by vegetation erosion which may also be broadly cause by a natural factor organ.

It can also be carried by improper channeling neglect of natural sewage systems and obstruction of naturally sewage by buildings. Form land and other unplanned structure causes a great deal of damage. Although the nature of soil within the area under consideration is mostly sandy with a very low water storage capabilities. Practical observation orchestrated form visit to those site prone to erosion have shown that their may be possibility of erosion if the nun off water is not properly channel e.g the nature of the soil. In sandy soil they can form a very good soil material but danger exist if the water table is near or surface nun off is not adequately channeled. The sandy easily eroded a way from it position their by causing or may lead to fully erosion. Furthermore, erosion is seen as one of the most serious defects in contemporary residential buildings, it is observed here that apart form it causing rapid destruction of structure / buildings, it also result to severe damage to the soil and in severe case it adversely affect the health of the occupants.

1.2  STATEMENT OF PROBLEM

A certain condition or factor can make a soil or structure / building to loose their Sharpe effectively or ineffectively attain their maximum structural physical and economic life span. It has been seen that a number of fact observed to be responsible for the in-adequate or in-appropriate functioning channeling of sewage surface nun off water at the due time. These in turn expose the building site to the danger of erosion which accelerate their dilapidation. Among the factors or improper channeling / neglect of natural sewage system and obstruction of natural sewage by building without following the local authorities rules dropping of refuse in the drainage ways. Erosion plays a critical role in dilapidation of building and visible in construction industry as one of the most serious defect in contemporary residential buildings. All soils can suffer erosion but some are more vulnerable than others. Soils with dispersible subsoils, for example, are subject to serious erosion by funneling and gully formation.

1.3   RESEARCH AIMS AND OBJECTIVE

The major purpose of this study is to determine. The effective way of controlling erosion in a construction site prone to erosion problem.

1) Identity the various causes of erosion in building sites.

2) Examine the appropriate materials and (new and old) used in controlling the erosion.

3) Determine the most appropriate materials and techniques required for the controlling it.

4) To recommend measure if implemented will lead to effective control of erosion in a construction  

1.4  RESEARCH QUESTIONS

The study sought to answer the following research questions

1)  What are nature and various causes of erosion in building sites

2)  What are the process to be applied in erosion control.

 3)  What are the  various types of materials to be used in controlling erosion

4)  If implemented will lead to effective control of erosion in an erosion prone site  

 1.5    SIGNIFICANT OF THE STUDY

The significance of this study shall include the follow:

1)  Contractors and engineers shall know how to control erosion in an erosion prone site.

2)  The engineers and the general public will because more aware on the importance of erosion control in a site.

3)  Lecturers, students consultants and other stakeholders in the construction industry will be theoretically & technically equipped on how to control erosion in an erosion prone construction site.

1.6   STUDY OF AREA

This study was delimited to the problem of erosion in a site prone to erosion. It focused on the type and magnitude of erosion at site in Anambra state and also looked at the specific remedial techniques to that building site will function effectively and efficiently. Attempt should be made to look into laboratory experimentation of the material used for effective control of erosion in building site prone to erosion. Ekwulobia erosion is gully erosion-gully erosion is of concern due to periodically intense rainfall and a large average of erodible soils. Effective design of gully control system must consider the gully network as a whole and be based on geomorphologic indicators such as type of network, order and stage of development. 

1.7   DEFINITION OF TERMS

According to Grolie (1990). Erosion is the wearing away of the earth surface by the action of water.According to Milos Holy (1987). Building is permanent or temporary structure enclosed within exterior walls and a roof and including all attached apparatus. Equipment and fixtures that cannot be removed without cutting into ceiling floors or walls. In the year 1960 Bernard Huss define soil as the top layer of the earths surface in which plants an grow consisting of rock and mineral particles mixed with decayed organic matter and having the capability of retaining water. 

  DOWNLOAD THE COMPLETE PROJECT

EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE IN SELECTED SITES

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE IN SELECTED SITES INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE IN SELECTED SITES?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE IN SELECTED SITES?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EFFECTIVE WAYS OF CONTROLLING EROSION IN A BUILDING SITE IN SELECTED SITES, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!