Select Currency
Translate this page

AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 85  |  2682 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT

 

ABSTRACT
Generally, for existing Insulation co-ordination studies the power system has been modeled either by deterministic mathematical techniques or by statistical methods. The shortcoming of the existing conventional mathematical technique of Insulation co-ordination analysis is that it assumes that the power system dynamics is linear. This makes analysis of over voltage response of the system under transients less optimal for determining over voltage withstand of system elements. Thus, this work seeks to model a lightning induced over voltage transient in a High voltage power system substation(132/33KV) used as a case study) using Hidden Markov Model, to determine the maximum likelihood lightning surge signalThe stationdata and configuration was modeled/simulated (in a MATLAB environment), which implements the algorithms used in the work. The Hidden Markov algorithm(which makes use of observable parameters to study what is happening at the hidden states), was used to formulate the problem, while the Baum-welch and Viterbi algorithm were used to find/identify the maximum likelihood lightning overvoltage waveform. These hidden states are represented with different scenarios introduced in the work and the waveform identified, is used to determine the Basic Insulation level(BIL), which is used to determine other parameters accurately, which in turn helps to ensure an optimal/novel Insulation coordination procedure for power system equipment in the station.
The results showed that the minimum required margin(15%) exceeded by a little value(i.e. about 1.08) and the evaluation carried out to raise the protection margin to 18% meant the relocation of the arrester to within 5.56m of the transformer.

CHAPTER ONE

INTRODUCTION
Background of the Study
The demand for the generation and transmission of large amounts of electric power today, necessitates its transmission at extra-high voltages. In modern times, high voltages are used for a wide variety of applications covering the power systems, Industry and research Laboratories. Such applications have become essential to sustain modern civilization[1].
The diverse conditions under which a high voltage apparatus is used necessitate careful design of its insulation and the electrostatic field profiles[2]. This entails the analysis of the electrical power system to determine the probability of post insulation flashovers. For instance, analysis must be carried out to determine that the insulation contained within power system components like transformers has the acceptable margin of protection. Since the internal insulation is not self-restoring, a failure is completely unacceptable. An insulation co-ordination study of a substation will present all the probabilities and margins for all transients entering the station.
Over voltages are phenomena which occur in power system networks either externally or internally. The selection of certain level of over voltages which are based on equipment strength for operation is known as Insulation co-ordination[3]. It is essential for electrical power engineers to reduce the number of outages and preserve the continuity of service and electric supply. In another perspective, Insulation co-ordination is a discipline aiming at achieving the best possible techno-economic compromise for protection of persons and equipment against over voltages, whether caused by the network or lightning.

  DOWNLOAD THE COMPLETE PROJECT

AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for AN INSULATION CO-ORDINATION PROCEDURE FOR POWER SYSTEM EQUIPMENT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!