ABSTRACT
Research has shown that construction labour output is crucial to the success of construction projects. However, existing labour output used for the preparation of construction estimates in Nigeria are outputs derived from untested experiences. The focus of this study is to use the work study approach to empirically establish labour output for painting activities for the Nigeria construction industry using the classification in the BESMM3 as a guide. The procedure adopted field survey involving work measurement to observe and measure operatives output. Data were collected from on-going construction works and analysed using descriptive and regression analysis. The analysis carried out established general average output value per day as follows; painting of general surfaces of walls, girth greater than 300mm with (textured paint, 128.53m2; emulsion paint, 81.07m2; gloss paint, 72.58m2). Painting of general surfaces of walls, girth less than or equal to 300mm with (gloss paint 211.10m, emulsion paint 277.59m); Painting of general surfaces of ceiling soffit, girth greater than 300mm (emulsion paint 85.31m2).The findings in this study revealed a higher output per day for painting of general surfaces of walls, girth greater than 300mm using (textured paint, 128m2). This study shows that different items of work in painting trade have various measuring units and also various labour outputs. The results of the analysis suggested that mode of employment, qualification of workers, temperature of the work environment, period of observation and experience of the operatives affect output of workers to varying degrees based on the location of application of the paint and the unit of measurement of the work items. This study has recommended that the established output should serve as an effective baseline for efficient estimating process and be in compliance with the BESMM requirements.
CHAPTER ONE
INTRODUCTION
1.1 Background to the Study
Estimating is one of the key fundamental functions of the Quantity Surveyor and accurate estimates are very vital to clients when making decisions therefore, clients expect useful and objective information from estimators. Cost estimates provide a useful basis for budgetary planning and cost control for construction projects. Garret (2006) reported that the sustainability and success of the construction industry depends greatly on the level of accuracy in project cost estimates. Estimating the costs of construction works involves the multiplication of unit rates and the measured quantities in the Bill of Quantities.
How do I get this complete project on AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY.? Simply click on the Download button above and follow the procedure stated. |
I have a fresh topic that is not on your website. How do I go about it? |
How fast can I get this complete project on AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY.? Within 15 minutes if you want this exact project topic without adjustment |
Is it a complete research project or just materials? It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data |
What if I want to change the case study for AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY., What do i do? Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
How will I get my complete project? Your Complete Project Material will be sent to your Email Address in Ms Word document format |
Can I get my Complete Project through WhatsApp? Yes! We can send your Complete Research Project to your WhatsApp Number |
What if my Project Supervisor made some changes to a topic i picked from your website? Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
Do you assist students with Assignment and Project Proposal? Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
What if i do not have any project topic idea at all? Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373 |
How can i trust this site? We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe! |