Select Currency
Translate this page

DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 80  |  3201 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS

 

ABSTRACT

Oil deposits are often found in association with a communicating gas or water zone. The production of the oil often leads to the coning of water or gas. This dynamic interaction can be captured by a properly detailed reservoir simulation, which unfortunately may not always be practical. To bridge the gap, researchers over the years have developed both analytical and empirical methods of modelling gas and water coning in oil reservoir. The fundamental questions have always been: what is the critical rate of oil production; what is the breakthrough time if the critical rate is exceeded; and what is the post-breakthrough behaviour? Using analytically derived line source vertical and horizontal well breakthrough time expressions, a method has been developed to estimate oil critical rate, breakthrough time and post-breakthrough trend for inclined wells. The Post-breakthrough prediction scheme was extended to vertical and horizontal wells. Simplified correlations have also been generated for the easy application of the method without the need of analyzing complex mathematical functions. Within the accuracy of the numerical simulation results, the breakthrough times for the inclined well were consistently and correctly predicted. Literature correlations and numerical simulation comparisons showed that the post-breakthrough production predictions tended to underpredict oil production, but the trends were much more consistent with simulation results than other correlations studied. To the best of the knowledge of the author, this is the first semi-analytical coning model of an inclined well, as well as, the first semi-analytical post-breakthrough trend prediction for vertical and horizontal wells.

 

CHAPTER ONE

INTRODUCTION 

Quite often, oil deposits are associated with an underlying water aquifer and an overriding gas cap. In many situations, the oil reserve is desired at the surface while the associated fluid is preferred within the reservoir either because they are not valuable at the surface as in the case of produced water or the resources to harness the gas if produced to the surface are not readily available. The reservoir water or gas may also be required for pressure maintenance in production optimization within the reservoir. Whatever may be the intention of prefering to keep the water and/or gas within the reservoir, it is found in practice a difficult goal to achieve due to coning of the unwanted fluid(s). Coning is the tendency of the underlying water in contact with the oil to rise locally towards the producing well due to the greater pressure depletion near the producing well and the viscous drag the production of oil is having on the water-oil interface. The same holds for the gas oil interface in which case the gas projects downwards towards the producing well’s perforation against gravitational force arising from gas-oil density difference. The projection is a result of viscous drag on the fluid interface and the local pressure depletion around the well due to oil production.

The production of either water or free gas with the oil will result in the reduction of the rate of oil production and the ultimate recovery of the oil. The reduction of oil production arises from the simple fact that some portion of the well bore that would be transporting oil will have to transport the unwanted fluid. Reduction in recovery arises from pressure depletion and trapping of oil behind the advancing unwanted fluid front. Ordinarily without coning, the unwanted fluid pushes the oil to the well as production progresses but with coning, the unwanted fluid leaves the oil behind, enters the well and may lead to early abandonment of the well.

The production of water has other damaging effect on hydrocarbon production profitability as it increases the spate and damage of corrosion. Corrosive agents like acid anhydride require the presence of water for ionization and chemical activity on metallic materials used in making the production string and other facilities. Obviously, the handling and disposal cost of produced water increases with the rate of coning. Depending on the prevailing environmental policy and the contaminant present in the produced water, this may constitute a huge cost burden. Gas handling, especially in areas with little market for gas, can become very demanding with gas coning. Treatment, pressurization and storage or re-injection may have dear financial implications. The environmentally-damaging alternative to the gas handling problem common in some countries is gas flaring. The latter constitutes enormous economic and environmental hazard. As can be appreciated, for technical and economic reasons, it is crucial that coning be minimized or delayed. Thus coning minimization or delay is an important aspect of reservoir and production management. Numerous studies1,2,3,4 have been conducted to understand the initiation and evolution of coning in order to control or minimize the stated negative consequences.

1.2 STATEMENT OF PROBLEM

Work on coning had generally been pursued along the path of preventing or delaying cone generation and evolution, the time to breakthrough if advancement is not checked and the performance of the well after cone breakthrough. A number of empirical and analytical studies have been conducted to model and determine these properties5. As will be discussed in detail, in the section on literature review, correlations and models for the determination of critical rate of oil production, time to breakthrough when producing at super-critical rate and the performance of the well after breakthrough have been developed for vertical and horizontal wells.

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DEVELOPMENT OF GENERALIZED WELL SEMI-ANALYTICAL CONING MODELS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!