Select Currency
Translate this page

AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY

Format: MS WORD  |  Chapter: 1-5  |  Pages: 64  |  869 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY

 

ABSTRACT

This research work has seriously analyzed procurement reforms act as tool for cost savings and accountability MKRPIC. Where the data was collected and used for the compilation of this research. An introduction was made which comprises the statement of general problem, the background of the subject matter, objectives of the study and the significance of the study. Existing literature on procurement reforms act, determination of needs, some purchasing objectives, purchasing practice and techniques, some management function were also discussed and reviewed. Random Sampling method was used as the basis of this study. A sample size of 39 out of total populations of 130 was selected. The research work shows that procurement reforms act n KRPC is always influenced or rather ineffective. The study recommends that due process should be complied with in order to enhance cost savings and accountability in KRPC. Also total commitment of the entire staff of KRPC.

 

CHAPTER ONE

INTRODUCTION

1.1   Background to the Study

In the past, huge sums of government money have been siphoned through the processes     of contract awards. A major thrust of this administration therefore, is the acceptance of Procurement Reforms Act as a tool for embracing transparency, competition, fairness, integrity, openness and value for money in the procurement reforms Act and seek the support of all governance for the implementation of the scheme in various ministries and government parastatals. The researcher intends to analyze on procurement reforms Act as a tool for cost savings and accountability in Kaduna Refining Petrochemical Company (KRPC) considering the several abuses to rules and standards in the award and execution of contracts. These abuses are in the form of over-invoicing, inflation of contract costs, proliferation of white elephant projects, poor project delivery, overpayment as well as manipulations of the processes leading to the award of contracts.

The Kaduna Refining and Petrochemical Company is in the business of refining Crude oil into valuable petroleum and petrochemical products and manufacturing and packaging products efficiently. And the way and manner in which procurement practices are carried out is of great concern to the researcher.

The edifice is a process plant designed to run steadily with minimum operating costs so as to make profit. In order to achieve this notable objective, it is imperative that replenishment drives are made to ensure that operational spare parts are readily available in the warehouse.

Since over seventy percent (70%) of the company’s expenditure is in the area of materials procurement. It is with this realization in mind that several efforts have been made by both corporate and the subsidiaries management to control and regulate materials management activities, especially in the area of procurement of materials in order to save cost and enhance company’s operations. In this project the terms procurement and purchasing would be used interchangeably.

The researcher developed interest to write on this topic because of personal interest in procurement reforms act and persona interaction with some staff who work in the procurement department under the umbrella of material management department (MMD) in Kaduna Refining and Petrochemical Company (KRPC).

The researcher got an insight into the procurement activities of the company the company and the problems facing them and therefore feels that it would be of great benefit to the company to conduct a detailed study into its purchasing departments with the aim of identifying the problems and after necessary suggestions toward the solution of such problems for effective and efficient operations of the company, Kaduna Refining and Petrochemical Company (KRPC).

1.2  Statement of the Problem

The Material Management Department (MM) of the KRPC Ltd operates in an integrated form to make materials available in the warehouses because the spare parts are stored. “JUST IN CASE” for timely maintenance intervention or as the need may arise. However, KRPC has taken a back seat in the implementation of the provisions of the Procurement Refining Act. Also, the statement of the general problem is the non-adoption of the Procurement Refining Act in KRPC Ltd.

And over the years there have been incessant cases where critical material needed for maintenance intervention and other requests, are either over-stocked, under-stocked or out of stock. The scenario depicts the existence of procurement deficiencies in the area of planning, replenishing, coding and inventory control which affects plant sustainability in KRPC Ltd. Besides 2008 annual stock taking in KRPC revealed the available materials to the value of N8 billion which could be used for other purposes.

1.3       Objectives of the Study

The study is geared towards achieving the following objectives:

· Outline the risks associated with non-implementation of the provisions of the procurement Act in KRPC Ltd.

· Determine the impact of the non-implementation of Procurement Reforms Act to the organization.

· Examine the factors responsible for the non-implementation of the Act in KRP Ltd.

· Suggest or proffer solutions to the problems.

1.4   Significance of the study

The benefits derivable under this study can be seen below:

·  It serves as a guide for the organization in which the researcher as chosen as a case study i.e. KRPC.

·  It is meant for students for are willing to embark on further studies in this perspective.

· It is a prerequisite for an award of Higher National Diploma (HND) in purchasing and supply.

1.5   Scope of the Study

The scope of this research work shall be limited to Kaduna Refining and Petrochemical Company particularly the department under the umbrella of material management department. The researcher also aimed at analyzing the procurement reform act as a tool for cost savings and accountability in KRPC. Also, comparative notes shall be made where necessary with other department within KRPC.

1.6       Research Questions

i)  What are the risks associated with the non-implementation of Procurement Reforms Act in KRPC?

ii) How does the non-implementation of the Procurement At affect the organization?

iii) What are the factors responsible for the non-implementation of the Procurement Reform Act?

iv)  What are the remedies for solving these problems?

1.7    Definition of Terms

-      Procurement: Means purchasing and/or supplies.

-      Supplier: This is the term used to describe a seller of goods or items in a given place.

- Inventory: This refers to the list of goods or items in a given place.

- Quotation: Is a list showing the prices of items.

- Purchase Order: It is an order in a printed firm to transmit the company’s requirement to supplies.

- Negotiation: Is a term used to arrive at a final and reasonable price.

- Specification: This is the information by the buyer to supplier indicating descriptions dimension and analysis performance of a product.

- Public Procurement: Means the acquisition by means of goods, works or services.

- Efficiency: Means the ability to minimize the use of resources in achieving organization’s objectives i.e. doing the right thing.

- Effective: Means producing the result that is wanted or intended.

- Due Process: Is a mechanism for ensuring strict compliance to rules and procedures that should guide contract award.

- BMPIU: Budget Monitoring and Price Intelligent Unit. This is the unit tasked with implementing Nigeria’s public procurement reform programmes.

  DOWNLOAD THE COMPLETE PROJECT

AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for AN ANALYSIS OF THE PROCUREMENT REFORMS ACT AS A TOOL FOR COST SAVINGS AND ACCOUNTABILITY, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!