ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 78  |  926 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION

 

ABSTRACT

This project work was chosen in order to determine an assessment for the application of value analysis and value engineering in cost reduction. It will X- Ray the gains, Benefits and contributions of value analysis and value engineering in an organization with special reference to Nigerian Bottling Company Owerri. The topic in question will reveal the methods by which value analysis and value engineering techniques can be applied as well as the contribution of other functional departments in the application of value analysis and value engineering.It will also identify the factors that are responsible for unnecessary cost of products and the reasons why value analysis programme fail some times. 

 

CHAPTER ONE

1.0 INTRODUCTION 

1.1 BACKGROUND TO THE STUDY

Value Analysis as an organized study of the function of materials, parts and components involves the critical examination of goods or products, which is aimed at improving its efficiency in use by changes in design, production techniques, packaging and other related process where as value engineering represents the application of value analysis at the pre-production stage. It centers more on cost avoidance ie it ensures that those things that adds to cost are being removed at the production floor before the materials are being processed in to finished product while value analysis is concerned more of cost corrections. 
Value analysis is an organized procedure for the efficient identification of unnecessary cost by analysis of the function (ie the property of the product which makes it work or sell). The essence of value analysis, therefore, is fist to identify the function of the product and then, examine alternative ways in which this function can be achieved choosing that which involves the least cost. Value analysis is probably the greatest cost- saving techniques used in industries today. It represents a powerful set of tools which can be used by management in controlling costs. The fundamental objective of value analysis activities is the procurement of materials representing the, “Best Buy” in terms of function to be performed. The general idea behind this is the issue of quality and cost. The main objective of every organization is to make profit. Just as a product is purchased to satisfy a particular purpose. For this reasons, it becomes important to correct or even avoid those unnecessary cost elements in a production design. This in essence stimulated the researcher most in carrying out this research.

1.2 STATEMENT OF PROBLEM: 

Nigeria as a nation is blessed with so many industries whose services the nation cannot do without. These industries are charged with the responsibilities of providing goods and services of high quality standard at a reduced and affordable price for the citizens. Materials in this respect becomes so Vital that no result could be achieved without good procurement procedures. This is essentially as a result of the fact that purchased materials contribute very tremendously to companies profit and profitability. 
Apparently, this stems very sufficiently as a result of recognition being accorded to purchasing function by most of these companies. It is a material fact that a company that buys wisely and economically profits well and therefore less vulnerable to economical doom. 

The researcher is associated with the following  1. The organization does not have enough time to examine critically, all the possible alternative materials and processes. 2. The organization inability to apply a formalized approach to the identification and elimination of unnecessary cost.  3. The Materials procured by the organization are very expensive and adds values to cost. 4. The purchasing function is not accorded it due recognition in performing their function in an organization. 5. The organization does not have the skill to consider the technical and commercial aspect of conducting a value analysis programme.

1.3 OBJECTIVE OF THE STUDYS 

This study is undertaken in order to explore the academic relationship between classroom theory and what is practically obtainable in bottling company having chosen the project topic. As assessment of the application of value analysis and value engineering in cost reduction “(A case study of Nigerian Bottling Company. Owerir), 

1. To investigate those factors that are responsible for unnecessary cost of an item in an organization.

2. To identify the benefits that can be derived from the implementation of effective value analysis programme in an organization.

3. To investigate what should be the role of purchasing in value analysis in an organization.

4. To identify those areas in which value analysis is applicable; that well result into cost reduction to the overall goal of organization.

5. To cause top management to realize that value analysis should really be every body’s business. In one sense, maximum potential can be realized from a values analysis programme only if management properly takes these potential resources. 

1.4 SIGNIFICANCE OF THE STUDY:

In view of the huge expenditure on purchase of materials used in industries, it becomes imperative for the implementation of value analysis techniques to reduced cost of production in industries. It is the significance of this study to make a viable and significant rectification so as to determine alternative ways of obtaining same quality materials or items but at a reduced cost. 

• It is also the significant of this study to accuse consciousness to the benefits of effective value analysis program in organizations.

• The project will also show how purchasing as a member of value analysis team is involved in value analysis programme.

• This project is also aimed at reviewing the way cost is being reduced by the use of value analysis techniques in an organization.

• The study is also undertaken in partial fulfillment of the national Board for Technical education and the Federal Polytechnic Nekede, for the award of HND in purchasing and supply.

• Finally, it will remain as a data bank for future researchers.

1.5 RESEARCH QUESTIONS

To achieve the objectives of the study, the following research question are necessary, notable among them are;

1. Is value analysis an effective technique in respect to cost reduction programme?

2. Does value analysis lead to a drastic cost reduction in products and services in industries? 

3. Does purchasing play a vital role in value analysis programme? 

4. Do those involved in product design; have enough time to critically examine possible alternatives materials and processes? 

5. What has firms benefited from the application of value analysis programme?

1.6 HYPOTHESIS

Based on the research questions above, the following hypothesis are formulated to be tested. 

1. Ho: Value analysis is not an effective technique in respect to cost reduction programme?

H1: Value analysis is an effective technique in respect to cost reduction programme.

2. H0: Not every firm requires the application of value analysis.

H1: Every firm requires the application of value .analysis 

3. H0: There is no need for the application of value analysis in respect to cost reduction in Bottling companies. 

H1: There is need for the application of value analysis in respect to cost reduction in Bottling companies.

4. H0: The application of value analysis has not in any way benefited firms.

H1: Firms has in no measure benefited a lot from the application of value analysis programme.

5. H0: Purchasing do not play a dual role in value analysis.

H1: Purchasing plays a vital role in value analysis.

1.7 SCOPE OF THE STUDY

This study is supposed to cover notable bottling industries, but as a result of the researcher being a student, faced with so many work in school which involves lectures and studying for the final exams and writing of this project at the same time and due to time constraints this research work will be focusing on the very department in “ Nigerian Bottling company. Owerri “that will make impact on the subject matter and these departments are as follows: Purchasing production. Quality control, Accounting, Design and Engineering Departments.

1.8 LIMITATION OF THE STUDY:

The researcher is handicapped by a number of factors, notable among them are:
a. Time factor
b. Finance 
c. Insufficient literature materials 
d. Poor response 

( a) Time: Time factor was one of the limiting factor that affected this project work, that is to say, the time within which to compete this work relatively short and does not allow or does not enable the researcher to get a detailed investigation and information of the facts needed. 

(b) Finance: In a project like this, there are bound to be some hindrances and obstacles posing a threat to the progress of the project. 
As we all know, money is not easy to come by as the researcher has to limit herself to the available financial resources and has to structurally adjust the project. 

C. INSUFFICIENT LITERATURE MATERIALS: The greatest hindrance of this project work is the unavailability of literature material for this work to be effectively and efficiently carried out by the researcher.

D. POOR RESPONSE: The response of people during interview was very poor and there were some questions asked and their response could be that they were incompetent to speak on such issues or they would tell you that it is confidential. As a result of this, information was not let out easily. There was also the risk of running up and down to collect the necessary data for the project, as they could not be collected at once. Also, the condition under which we are subjected to study is very poor and the research had to attend her lectures, do her assignments together with carrying out this project work. This did not affect the design of the project itself, rather, some of the figures and facts inside are accurate account based on the best of my knowledge.

1.9 OPERATIONAL DEFINITION OF TERMS:

FUNCTIONAL VALUE: Functional value as used is simply that which enables an item or product to fulfil its stated function. It can also be called used value. 

AESTHETIC VALUE: This is simply the measure of value of beauty attached to an item that increases its desirability. 

ANALYSIS: This is the detailed study of something in order to understand more about it or what it consists. 

PURCHASING: As used here, it an important part of material management, standing mainly for obtaining the right quality material from the right source, in the right quality, and at the right time. 

ALTERNATIVE: This is something you can choose or have out of two or more possibilities to achieve the same objective 

EXCHANGE VALUE: This is the cash worth of something in its present form. It is the price, a purchaser offers for an item.

VALUE ANALYSIS: This is the systematic study of product or material with a view to reduce their cost by redesigning or eliminating the design features which adds to cost but do not contribute to value. 

VALUE ENGINEERING: This is the application of value analysis techniques in the pre- production stage.

RE- DESIGN: This is the process of designing a product or material again in a different way. It is an adjustment on a product design by eliminating certain features of the product. 

COST: This is the price paid or required for acquiring producing or maintaining something measured in money. 

PRODUCTION: This can be defined as the creation or manufacturing of goods and services in to finished product with exchanges value.

VALUE: value is simply the desirability of a thing.

ORGANIZATION: This is the formal meeting of people who come together to achieve a particular goal 

QUALITY: This is the totality of features and characteristics of a product or a service that satisfy a stated need.

PROCURE: It simply means to obtain or acquire. 

SPECIFICATION: This is the description of any object, materials or process in sufficient detail to enable its manufacture and further identical reproduction 

ELIMINATE: It simply means to remove or take out 

RAW MATERIALS: These are materials on which further manufacturing process is carried out. It is the materials out for further production of goods of services. 

PROFIT: This is the excess of revenue over quality and expenses in business enterprise. 

DEPARTMENT: This is a specialized division of a large concern, such as business. 

TECHNIQUE: This is a practical method or act applied to a particular skill. 

INDUSTRY: This is simply a branch of commercial enterprise concerned with out put of a specified product

COMPONENT: Is a constituent part or aspect of something more complex. 

RELIABLE: It simply means able to be trusted and dependable.

FEATURE: This means a prominent or distinctive part.

  DOWNLOAD THE COMPLETE PROJECT

ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ASSESSMENT OF THE APPLICATION OF VALUE ANALYSIS AND VALUE ENGINEERING IN COST REDUCTION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!