Select Currency
Translate this page

THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE

Format: MS WORD  |  Chapter: 1-5  |  Pages: 57  |  4883 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION  

1.0    BACKGROUND TO THE STUDY

The ultimate or core aim of an organization in this world today with the level of competition is to maximize profit and the satisfaction of consumers need through quality product irrespective of competitors and this can be achieved by quality control in an organization. Quality is concerned with fitness or proper quality of product and it also goes with it price and delivery quality control takes this form of fitting standard quality, according to specification delivery and to schedule, the process through which the establish and need standard is commonly call “control series” this process consist of university accepted series of steps applied to problems quality to follows:             

i.  Choosing the control subject that is selecting what is to be regulated. 

ii.  Selecting a standard values that is specifying the quality characteristics

iii. Creating sourcing services which can measure these characteristic in terms of unit of measure

iv.   Interpretation the difference between actual and standard decision making and acting on the difference. When the universal regulatory process as in the above is applied to problem of product quality. It is often called “quality control” quality control have many definition such as. Quality control is an attempt to identify and analyze weakness in product and decide on how best it is to decide with those problem or weakness so that the organization will grow. Sometimes, the problem with a product is not that it fails to perform to specification but rather that it does not offer any significant advantage over competitors products already in the market. Organization may have employees that are able and having appropriate equipment that leads to the increase in productivity yet sales falls below. Expectation the missing factors in many cases is the lack of effective quality control model in the organization. A manager in any organization needs to have technical knowledge and competence about their product and best control model to be adopted and the best way of handling them effectively. ­

1.1    STATEMENT OF THE PROBLEM

Quality control cannot be ignored if meaningful goals and objectives are expected to be achieved. Quality must be control as well as all other resources use in ensuring quality product. Currently Nigeria major problems in quality control is the use of outdated or inappropriate technology and lack of managerial experience is another problem facing quality control. The success of our present day industries depends on how to manage our resources and to enhance growth and development for the success of industrialization to this end this research is preoccupied Peugeot automobile (Nig.) Kaduna.

1.2    BACKGROUND OF THE ORGANIZATION

The initiative to establish Peugeot automobile Nigeria limited was taken by the federal military government under the leadership of General Yakubu Gowon. The idea was concretized on October, 6, 1969 when the government invited 16 reputable vehicle manufacturing companies in the world to establish a vehicle assembly plant in the country. Twelve years before the initiative was taken Peugeot cars make their first entry into Nigeria when individual imported about 100 units of the cars soon become popular due to their legendary reliability and suitability to Nigeria road conditions. The demand for Peugeot cars in Nigeria rose sharply again in the 1960s with the further introduction of the Peugeot 404 model with the high demand of Peugeot product which was a mark of acceptability. It was therefore, not surprising when in may 7, 1971, Automobile Peugeot of France proposal was selected out of those tendered by 16 various vehicle manufacturers. Peugeot automobile Nigeria limited, PAN was incorporated in December 15, 1972 as limited liability company with an authorized share capital of three million Naira. Twenty seven months after incorporation, the head of state commissioned the assembly plant on march 14, 1975, and through full operations had commenced on march 2, 1975.  

1.3    OBJECTIVE OF THE STUDY             

i. To look into the process of quality control in the manufacturing organization.

ii. To find out the possible causes of low quality of the organizational product 

iii. To know the systems of correction of quality defect of companies and suggestion and recommendation.         

iv. To reduce over dependence on import in Peugeot Automobile Nigeria company.

1.4   SIGNIFICANCE OF THE STUDY

The significance of quality control in the production systems cannot be over emphasized more so, in a competitive environment such as Nigeria, it is imperative for firms to emphasis quality control to enjoy competitive leverages so that their product could compete favourably with the imported goods. However, the attitudes of Nigeria manufacturing towards quality control are less encouraging. This is evidence in poor quality products. They do not make available to consumer or consumers it is then store of inverse importance to the manufacture  as the study has the overall objectives at attaining suggestion which they can effectively handle the challenges of quality control measure in their production activities.

1.5    RESEARCH QUESTIONS             

i. What are the processes of quality control in the manufacturing organization?           

ii.  What are the causes of low quality product in the organization?         

iii. What are the system involved in correcting quality defect of the companies?         

iv. In what way can over dependency on import be reduce in Peugeot Automobile Nigeria Limited?

1.6   SCOPE OF THE STUDY

Quality control management as chosen as a topic of relevant to the manufacturing industry in Nigeria.Although quality control management is an activity relevant to all business organization and employees of the manufacturing sectors. The research is restricted to the study of quality control management on organizational performance.

  DOWNLOAD THE COMPLETE PROJECT

THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!