Select Currency
Translate this page

AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY

Format: MS WORD  |  Chapter: 1-5  |  Pages: N/A  |  4579 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION

Many reservoirs are comprised of relatively young sediments, which are so poorly consolidated that sand will be produced along with the reservoir fluids unless the production rate is reduced significantly. Sand production leads to many numerous production problems including erosion of down hole tubular, valves, fitting and surface flow lines, collapsed casing because of lack of formation support. Thus a means to eliminate sand production without greatly limiting production rates is desirable. Sand production can be controlled using different methods but the method of utmost importance to this project is the mechanical method which basically involves the use of gravel pack (GRAVEL PACKING). This method is considered the oldest and most effective sand   control mechanism. It is simply a down hole filter designed to prevent the production of unwanted sands which involves the placement of gravel across a perforated interval in the sand screen annulus and also in the perforation tunnel to prevent the influx of sand. Inaccurate determination of gravel pack size, could lead to sand influx which could be detrimental to both the technical and economic aspect of production which is the overall objective of this project aimed at identifying means to selectively select appropriate gravel pack sizes from formation sands produced through sieve analysis to meet optimum sand control for maximum production without any detrimental effect to production hard wares. In a gravel pack completion, sand that is larger than the average formation sand grain is placed between the formation and a screen or slotted liner with the aim of retaining most of the formation sand, but letting  very fine particles through it and be produced. The two most common types of gravel pack completion are the inside casing gravel packing or internal gravel packing (IGP) and underreamed gravel pack or external gravel pack (EGP). The underreamed casing gravel pack provides better conductivity through the gravel but is limited to single zone completion.  

AIMS AND OBJECTIVES

This project is aimed at

1. To study   the various types of gravel packing methods  used in  the petroleum industry.

2. To analyze sieve analysis data of formation sands gotten from OBEN13L in other to determine the appropriate gravel pack size used.

3. To make conclusions on the state of OBEN WELL 13L on the basis of sieve data analysis and give possible recommendations.  

SCOPE AND LIMITATION

The scope of this project is limited to the mechanical method  of sand control with more emphasis on the sieve analysis of formation sands gotten from OBEN13L.    

METHODOLOGY

The method to be adopted for this project is the use of sieve analysis and sucier correlation to determine the gravel pack size to be used  for OBEN WELL 13 with formation sands gotten  from  the case study as mentioned above and useful information gotten from the internet, textbooks, petroleum journals. This method simply involves collecting core samples  and running them through different sieves with different opening sizes, usually sieves with larger openings at the top and sieves of smaller opening at the bottom and plotting each weight retained on each sieve against the sieve opening size to determine the average formation sand size which is used to find accurate gravel size using  sucier correlation.

  DOWNLOAD THE COMPLETE PROJECT

AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!