BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS
ABSTRACT
Techniques in Geostatistics are increasingly being used to generate reservoir models and quantify uncertainty in reservoir properties. This is achieved through the construction of multiple realizations to capture the physically significant features in the reservoir. However, only a limited number of these realizations are required for complex fluid flow simulation to predict reservoir future performance. Therefore, there is the need to adequately rank and select a few of the realizations for detailed flow simulation. This thesis presents a methodology for building and ranking equiprobable realizations of the reservoir by both static and dynamic measures. Sequential Gaussian Simulation was used to build 30 realizations of the reservoir. The volume of oil originally in place, which is a static measure, was applied in ranking the realizations. Also, this study utilizes Geometric Average Permeability, Cumulative Recovery and Average Breakthrough times from streamline simulation as the dynamic measures to rank the realizations. A couple of realizations selected from both static and dynamic measures were used to conduct a successful history match of field water cut in a case study.
CHAPTER ONE
INTRODUCTION
1.1 PROBLEM DEFINITION
In Geostatistical reservoir characterization, it is a common practice to generate a large number of realizations of the reservoir model to assess the uncertainty in reservoir descriptions for performance predictions. However, only a limited fraction of these models can be considered for comprehensive fluid flow simulations because of the high computational costs. There is therefore the need to rank these equiprobable reservoir models based on an appropriate performance criterion that adequately reflects the interaction between reservoir heterogeneity and flow mechanisms. Most techniques used in ranking of realizations are based on static properties such as highest pore volume, highest average permeability, and closest reproduction of input statistics. The drawback of these simple techniques is that they do not account for dynamic flow behavior which is very essential in predicting future reservoir performance. This thesis work seeks to build and rank equally probable representations of the reservoir using petrophysical properties such as porosity, water saturation, and permeability. The multiple reservoir descriptions are ranked using both static (Stock tank oil originally in place) and dynamic (geometric average permeability, connected hydrocarbon pore volume, average breakthrough times and cumulative recovery) measures.
1.2 OBJECTIVES
The main purpose of reservoir characterization is to generate a more representative geologic model of the reservoir properties. The objectives of this study are as follows.
In building a static representation of what a reservoir is most likely to be it is necessary to adequately capture the uncertainty associated with not knowing its exact picture. In the effort of capturing the uncertainty, this study focuses on generating multiple equiprobable realizations of the reservoir with each having unique static and dynamic properties.
Only a few number of the realizations generated could be carried on for complex flow simulation due to the computational cost. Usually ranking of the realizations to select a limited number are done by static means which do not capture the dynamic mechanisms essential to reservoir performance. Only few dynamic ranking measures are currently in use. This research work seeks to define new dynamic ranking criteria and compare them with existing criteria.
How do I get this complete project on BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS? Simply click on the Download button above and follow the procedure stated. |
I have a fresh topic that is not on your website. How do I go about it? |
How fast can I get this complete project on BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS? Within 15 minutes if you want this exact project topic without adjustment |
Is it a complete research project or just materials? It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data |
What if I want to change the case study for BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS, What do i do? Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
How will I get my complete project? Your Complete Project Material will be sent to your Email Address in Ms Word document format |
Can I get my Complete Project through WhatsApp? Yes! We can send your Complete Research Project to your WhatsApp Number |
What if my Project Supervisor made some changes to a topic i picked from your website? Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
Do you assist students with Assignment and Project Proposal? Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
What if i do not have any project topic idea at all? Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373 |
How can i trust this site? We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe! |