Select Currency
Translate this page

ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE)

Format: MS WORD  |  Chapter: 1-5  |  Pages: 58  |  1011 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE)

 
CHAPTER ONE 
INTRODUCTION
1.1   Background of the study 
In many markets, firms compete over time by expending resources with the purpose of reducing their costs. Sometimes, the cost reducing investments operate directly on costs. In many instances, they take the form of developing new products that deliver what customers need more cheaply. Therefore, product development can have the same ultimate effect as direct cost reduction. In fact if one thinks of the product as the services rendered to customers, then product development often is just cost reduction. The globalization of trade and subsequent breakdown in trade barriers has generated tremendous growth in maritime transportation. Thus the stiff competitions among part operators have increased the desire to attract port uses. Therefore, port operators will have to optimize the cost of their operations if they must benchmark good productivity and performance for their terminals. There is no doubt that the maritime sector especially the port system is vital and instrumental to the national economic survival of the country. Nigeria is a popular nation, renowned for her international nature of business. Quality customer service is the benchmark principle for the maritime professional and customer care techniques. Therefore, the economic justification of a port is its ability to satisfy its customers at a lower price and also be able to make profits. With regards to costs emanating from the vessel, it can be affirmed that port costs, above all are the most significant, since they depend on the gross tonnage of the vessel and the time it spends in the port. Bulk carriers are those which tend to spend most time in port as well as being the greatest in size. The costs of towing, which depend on the circumstances of the movement, tend to represent approximately 10% to 15% of the cost scale of the vessel [5]. More so, other costs due to the vessels stay at port, including agency fees average approximately 5 or 10% of the total. The port tariffs on the merchandise are situated at less than 50% of the total. Where all costs of unloading are considered in relation to port costs, the former are situated at about 70% of the total where all costs are also included storage, weighing etc. With a clear tendency to drop when using cranes of greater efficiency and capacity, about 30% would correspond to port costs. It is evident that Nigerian ports operate at very low optimal capacity, in spite of the expected large volume of cargo traffic that passes through it. It is very pertinent to note that vessel delay period is a very serious problem that contributes to over 60% of our ports low productivity problem in recent times. Ndikom [3], further confirms that regrettably, at Lome port, dock workers load 700mts per day as against less than 250mt per day at Nigerian ports. The five days difference in loading arrangements between Nigerian ports and other ports in terms of ship delay rate billings of US$4,000 is rather too staggering and unfortunate. In clear terms, this is enough to deny Nigerian ports cargo and revenue that would ordinarily have come our way. Kaspi, et al, looked at the minimization of cost and optimum port performance as anchored on reducing port turnaround time. They developed a regression model to relate turnaround time and port cost which was highly related with allocation of port facilities. Beatriz et al, argues that the optimal organization of the industry can be studied by means of cost and production functions. They reviewed the literature on econometric ports’ structure and propose that the calculation of key cost indicators (economics of scale, scope and so forth) is best in determining optimal port structure is order to minimize the cost of port operations.
1.2  Statement of the problem 
It is evident that Nigerian ports operate at very low optimal capacity, in spite of the expected large volume of cargo traffic that passes through it. It is very pertinent to note that vessel delay period is a very serious problem that contributes to over 60% of our ports low productivity problem in recent times. Ndikom [3], further confirms that regrettably, at Lome port, dock workers load 700mts per day as against less than 250mt per day at Nigerian ports. The five days difference in loading arrangements between Nigerian ports and other ports in terms of ship delay rate billings of US$4,000 is rather too staggering and unfortunate. In clear terms, this is enough to deny Nigerian ports cargo and revenue that would ordinarily have come our way. Kaspi, et al, [2], looked at the minimization of cost and optimum port performance as anchored on reducing port turnaround time. They developed a regression model to relate turnaround time and port cost which was highly related with allocation of port facilities. Beatriz et al [1], argues that the optimal organization of the industry can be studied by means of cost and production functions. They reviewed the literature on econometric ports’ structure and propose that the calculation of key cost indicators (economics of scale, scope and so forth) is best in determining optimal port structure is order to minimize the cost of port operations. Significance of the study This study attempts to optimize the cost of port operations in Nigeria.With regards to costs emanating from the vessel, it can be affirmed that port costs, above all are the most significant, since they depend on the gross tonnage of the vessel and the time it spends in the port. Bulk carriers are those which tend to spend most time in port as well as being the greatest in size.In the light of the above, this study attempted bridging the gap by offering an optimal cost to port operations in Nigeria. 
1.3  Objectives of the study 
The broad objective of the study is the analysis of optimum cost of port operations. The specific objectives include: 
1. Determination of the minimum cost of port operations
2. Determination of the optimality range of cost variability. 
3. Determination of the optimality range of resource variability. Research questions 
1. Is there a minimum cost of port operations?
2. What is the optimality range of cost variability? 
3. What is the optimality range of resource variability? Research hypotheses 
1. Ho: There is no minimum cost of port operations. :There is minimum cost of port operations. : There is no optimality range of cost variability. : There is optimality range of cost variability. : There is no optimality range of resource variability. : There is optimality range of resource variability.
1.4   Limitations of the study 
1. Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview). 
2. Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work. Scope of the study The study focuses on the analysis of cost optimization of port operations using Apapa port as a case study. 
1.5  Definition of terms 
Cost: This is an amount that has to be paid or spent to buy or obtain something. 
Cost optimization: This means finding an alternative with the most cost effective or highest achievable performance under the given constraints, by maximizing desired factors and minimizing undesired ones. 
Port: This refers to a town or city with a harbor or access to navigable water where ships load or unload. 
1.6  References 
Ajidahun, C.O. (2007). The training, development and education of library manpower in information technology in university libraries in Nigeria.World Libraries 17 (1). Appleby, P.C. (1991). Modern business administration. London: Pitman. Boock, M., & Vondracek, R. (2006).Organising for digitization: A survey. Portal: Libraries and the Academy 6(2): 197-217. Cortez, E.M., Dutta, S.K., &Kazlauskas, E.J. (2004).

  DOWNLOAD THE COMPLETE PROJECT

ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE)

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE) INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE)?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE)?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ANALYSIS OF COST OPTIMIZATION OF PORT OPERATION (A CASE STUDY OF APAPA PORT IN LAGOS STATE), What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!