Select Currency
Translate this page

BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION.

Format: MS WORD  |  Chapter: 1-5  |  Pages: 86  |  1167 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION (A CASE STUDY OF HOTEL INDUSTRY IN LAGOS STATE NIGERIA)

 

TABLE OF CONTENTS

CHAPTER ONE

1.0     INTRODUCTION

1.1     Background to the study

1.2     Statement of the Problem

l.3      Purpose / objective of the study

1.4     Research questions

1.5     Research hypotheses

1.6     Significance of the study

1.7     Scope and limitations of the study

1.8     Brief description of selected hotels

References

CHAPTER TWO

2.0     LITERATURE REVIEW

2.1     Introduction

2.2     The concept of budgeting

2.3     Principles of budgeting

2.4     Prerequisites for effective

2.5     Budgetary system

 

2.6     Budgetary control

2.7     Behavioural implications of budgeting

2.8     Types of budgets

2.9     Budgeting techniques

2.10   Dynamism

2.11   Dynamic budgeting techniques

2.12   Budget and strategy

CHAPTER 3

RESEARCH METHODOLOGY

3.0     INTRODUCTION

3.1     Restatement of research questions and hypothesis

3.2     Research design

3.3     Sampling procedure

3.4     Data collection procedure

3.5     Questionnaire design

3.6     Statistical tools

CHAPTER FOUR

DATA PRESENTATION AND ANALYSIS

4.0     INTRODUCTION

4.1     Characteristics of the population

4.2     Presentation of data

4.3     Analysis of data

CHAPTER FIVE

SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

5.1     SUMMARY

5.2     CONCLUSIONS

5.3     RECOMMENDATIONS

BIBLIOGRAPHY

 

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND TO THE STUDY

There is the need for optimization of the scarce resources available to organizations, that is available resources are to be put to their most optimal or profitable use. Since these resources are scarce, a plan has to be drawn to eliminate wastage and arbitrary resource allocation. This trend of thought brings us to the "concept of budgeting".

An organization plans ahead in terms of sources of revenue and avenues of expenditure within a specific time frame. Irrespective of the fact that it is privately or publicly owned, organizations find it of utmost importance to prepare budgets and put in place budgetary controls for the purpose of achieving the best possible results.

Omolehinwa (2001 :309) defines budgeting as "the plan of the dominant individuals in an organization expressed in monetary terms and subject to the constraints imposed by other participants and the environment indicating how the available resources may be utilized to achieve whatever the dominant individuals agree to be the organization’s 'priorities'.

In real world policy- and decision-making, information is intertwined with, and therefore reflects, interests and ideologies of various stakeholders (Weiss 1983). The information-content of (performance) measurement systems has an impact on how management and policy are defined, controlled, reported on and legitimized (Bouckaert 1995:384).

Thus the information-content of budgetary control systems can be part of strategies to create meaning, exercise control or establish legitimacy. (Meyers 1994; Rubin 1997).

Schick (1996) identified three ideal-type budget functions: control, management and planning and throughout the 20th century, other functions have been added to those outlined by Schick, for instance achieving savings or increasing accountability (Rubin 1996). As a result budget processes have gradually accumulated functions (Caiden 1988). Contemporary budget systems can thus be understood as multi-functional, multi-formatted and multi-procedural phenomena. Budget reform then can be described as shifts in functions, formats and procedures.

1.2     STATEMENT OF THE PROBLEM

The focus on improving financial control has resulted in introducing more sophisticated financial accounting techniques in organizations, requiring long-term financial planning, and more comprehensive financial statements and financial audits. The performance oriented reforms at this level have focused on strategic and performance planning, aligning budget formats to these performance plans, linking performance monitoring with accrual and cost accounting and conducting performance audits.

It is a common practice for corporate bodies to prepare their yearly budget proposals for approval, the budget approval in most cases is hinged on the performance and actualization of the previous years' budgets.

However the underlying problem of the budgetary system is its strict implementation within the dynamic of an ever changing business and political environment of the corporate business world.

Thus for corporate management, budgeting and budgetary controls may be reviewed periodically to attain given objectives with organizational goals.

That practice of performance measurement against plans would make management able to take remedial action against variances in order to bring the deviating operations/departments back on course.

1.3     PURPOSE / OBJECTIVE OF THE STUDY

The purpose of this study is to examine how budgeting and budgetary control has been used as a tool for effective managerial planning and control in organizations in the hotel industry.

It will highlight the budgeting and budgetary control procedures as they apply to these organizations and the recent innovation in budgeting and the constraints of administration of budgetary control for effective decision making and attainment of organisational goals/plans.

1.4     RESEARCH QUESTIONS

This study attempts to proffer answers to some relevant research questions, and is meant to give a thorough insight into the analysis of the concepts and objectives of the study that would enable the researcher to extract useful deductions from the research work.

1.        Are there qualified and experienced manpower adequate for the formulation of the budgetary control techniques and budget preparation?

2.        What types of budgetary and budgetary control systems are available?

3.        What causes inefficiency in the budgetary process?

4.        What is the root cause of poor budget implementation and budgetary control in organizations?

5.        What are the available budgetary control techniques used by the organization?

6.        What other control techniques are available other than budgetary control methods which the organization uses?

7.        To what extent does the organization’s budget control its activities?

1.5     RESEARCH HYPOTHESES Hypothesis 1

Ho:    There are not enough qualified and experienced manpower for theformulation and implementation of the budgetary control techniques.

H1:    There are enough qualified and experienced manpower for the formulation and implementation of the budgetary control techniques.

Hypothesis 2

Ho:    The organization’s budget to a large extent does not control its operations and activities.

H1:    The organization’s budget to a large extent controls its operations and activities.

1.6     SIGNIFICANCE OF THE STUDY

The significance of this research project is that budget functions always involve an element of control (top-down) as well as an element of accountability (bottom-up). Control and accountability may thus be regarded as 'permanent' budget functions. The way in which these permanent functions are defined however, has varied according to time and place.

 

The place under scrutiny in this study is the hospitality industry where the purpose has been to use the budget as a management policy tool and the concept of accountability has been defined in terms of quality of service clients. Where the purpose has been to use the budget as an instrument for financial control, accountability has been defined in terms of detailed line-items. Where the purpose has been to improve management, accountability has been defined in terms of performance or results. These 'purposes' can be regarded as 'variable' functions, whose dominance has been contingent with changes in the administrative, political and societal context and in the perceptions and behaviour of the all levels of management in the hospitality and tourism sector of the economy.

1.7     SCOPE AND LIMITATIONS OF THE STUDY

The study concentrated on the problems associated with budgeting and budgetary control which have brought about changes in policy from the use of a planning programme budgeting system.

This study covered practice and problems of the budget process in relation to organizations in the hotel industry. Specifically the five selected hotels are Sheraton Hotel and Towers, Federal Palace Hotel and Suites, Lagos Airport Hotel, Ikeja Palace Hotel and Eko Hotel and Suites; all located in Lagos.

However the limitations of this study included the difficulty in getting extremely busy financial executives and officials to fill the questionnaire and fear of information divulgence. Non-disclosure letter, particularly to competitors was submitted to allay fear by the researcher.

In addition some respondents did not answer correctly some of the questions in the questionnaire while a few others returned partially filled questionnaires.

1.8     BRIEF DESCRIPTION OF SELECTED HOTELS

Lagos Airport Hotel, was established in 1942 as 'Grand Hotel', present owners bought it through the Western Region Government in 1959 and it became a subsidiary of Odua Investment Company. Incorporated in 1961 as a Private Limited Liability Company. Located on ObafemiAwolowo Way, Ikeja. Presently it has 277 rooms and suites, halls, restaurant, bars and swimming pool. Other hotels in Odua group are Lafia Hotel and Premier Hotel, both located at Ibadan.

Eko Hotel and Suites was established in 1974 but started operation in 1977, jointly owned by Lagos State Government (25%) and OHA Ltd - a French company (75%). Located on AdetokunboAdemola Street, Victoria Island overseeing the Atlantic Ocean and Kuramo Lagoon. Eko Hotel and Suites is made up ofEko Hotel, Eko Suites, Kuramo Lodge and Ocean View Restaurant. Presently it has 604 rooms and suites, ballrooms, restaurant, exhibition centre, bars, sports / health club and swimming pool.

Lagos Sheraton Hotel and Towers, a public quoted company, IS owned majorly by Ikeja Hotels PIc. Sheraton was opened in 1985. It is managed and operated formally by Sheraton Overseas Management Corporation and presently by Starwood Hotels and Resorts Inc and located on Mobolaji Bank Anthony Way, Ikeja. Presently it has 332 rooms and suites, ballrooms, night club, discotheque, restaurant, exhibition centre, bars, sports / fitness centre and swimming pool.

Federal Palace Hotel and Suites, still undergoing renovation on one of two wings was built in 1960 at the dawn of Nigeria's independence, incorporated in 1964 and owned by the Federal Government of Nigeria until 1992 when it was acquired by The Tourist Company of Nigeria. One of the wings was built to coincide with Festival of Art and Culture (FESTAC) '77. Located on Ahmadu Bello Way, Victoria Island overlooking Lagos Harbour. Presently it has about 632 rooms and suites, ballrooms, restaurant, mini-bars, sports and health club and swimming pool.

Ikej a Palace Hotel, is privately owned by His Royal Highness, Oba G.

A. Banjo, the Ajalaye of Ilugun South, Alaro Ogun State, was established in 1979 located on Toyin Street right at Toyin, Allen and Opebi Roundabout. Presently it has 20 rooms and casino, restaurant, bars, sports/ health club and houses many shops including Courier Company, bureau de change and boutique.

 

REFERENCES

Bouckaert, Geert. (1995) "Improving Performance Measurement." pp. 379- 412 in The Enduring Challenges in Public Management. Surviving and Excelling in a Changing World, Eds. ArieHalachmi and Geert Bouckaert. San Francisco, CA: Jossey-Bass.

Caiden, Naomi. (1988) "Shaping Things to Come: Super-Budgeters As Heroes (and Heroines) in the Late-Twentieth Century." Pp. 43-58 in New Directions in Budget Theory, Ed Irene S. Rubin. Albany: State University of New York Press.

Meyers, Roy T. (1994) Strategic Budgeting. Ann Arbor: University of Michigan Press.

Neuby, Barbara L. (1997) "On the Lack of a Budget Theory." Public Administration Quarterly 21(2):131-42.

O.E.C.D. (1995) Assessing Financial Management Reforms. Overview. PUMAlSBO (95)4. Paris: O.E.C.D.

O.E.C.D. (1997) "Modern Budgeting." Paris: OECD.

Omolehinwa E. O. (2001) Government Budgeting In Nigeria. PumarkNig Ltd, Lagos.

Rubin, Irene S., Ed. (1988) New Directions in Budget Theory. Albany: State University of New York Press.

Schick, Allen. (1966) "The Road to PPB: The Stages of Budget Reform." Public Administration Review 26(4):243-58.

Van Reeth, Wouter. (1996) "The Search for Meaningful Budgeting." research paper presented at the EGP A Conference in Budapest, August 1996.

Weiss, Carol H. 1983. "Ideology, Interests and Information: The Basis of Policy Decisions." Ethics, the Social Sciences and Policy Analysis, Eds. D. Callahan and B. Jennings. New York: Plenum. 

 
 

  DOWNLOAD THE FULL PROJECT

BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION.

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION. INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION.?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION.?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION., What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!