Select Currency
Translate this page

DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 81  |  4962 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION

 

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

Indoor sports hall are universally useful spaces designed to accommodate a variety sports. Some of these can take in a suitable games hall, and consequently it will be important to settle on upon the range of games and levels before deciding the floor required area. (Peter Ackroyd 1995). The indoor game hall can be as a solitary 'stand-alone' structure with smallest bolster space or as a segment inside a larger structure. This sport building began to spring up during the end of the twentieth century.

Earlier examples being basic 'games outbuildings 'on school places that gave fundamental climate projection to open spaces playing ground. Others were a section of larger public sport building that were built in the 1970's. Different developmental project and sport programmer in the 1980's saw the advancement of standard reduced and design that were economical (Sports hall design and layout February 2012). Indoor sport hall activity can be competitive, sport or for exercise purposes. Most sporting hall are designed in such a way that both national and international sport competition as well as county and club completion can take place in them.

In this part the data given about every sport activity will by and large be limited to the required general sizes at the different perceived levels. Some of the sport building are large structure bounded by both dry and wet sport. It is feasible to have a dry or wet or sport complex. (Geraint John 1995). Such that variety of games can be hosted in a multipurpose indoor sporting hall, each of this games have individual court with the appropriate colour marking. However, the utilization of lines minimizes the utilization of space and tend to bring harmony between the different sporting activities.

1.2 STATEMENT OF THE PROBLEM

Kaduna the Kaduna state capital boasts of facilitating numerous sport events be it at local, nationwide, and sometimes worldwide. As a result of this the facilities available which for to host this games are now inadequate while some of them are overstretched. To this end, there is a requirement for construction of new indoor sport hall. According to the World Bank and World Health Organization (W.H.O) persons with physical impairment make up 15% of the world populace with the greater part of them in the third world nations. (World Report on Disability, World Health Organization, 2011). Physical impairment is increasingly being acknowledged as a human rights issue. Without a doubt, individual that make up the disability movement observe disability human rights as the last liberation struggle. The new UN Convention on the privileges of persons with disability was received in January 2007, and numerous nations have passed their own domestic disability law. Probably the comprehensive disability legislation exists in third world nation. On the other hand, making an interpretation of rights on paper into genuine enhancements for the lives of disable people is to a great extent harder. The Nigeria Building Code obviously diagram the fundamental necessity a building ought to have for the building to be accessible by both the physically able and disable It shows up just as these essential necessities have been traded off both the designer who plans building and the engineer of the building. Toward this impact, the physically tested within the general public have thought that it was hard to get to some building in addition to make compelling utilization of the building and should not be so. Each individual irrespective of physical status has the privilege of accessibility into an indoor sport hall implied society. After some moment in time, creators as well as proprietors of indoor sport hall have dismissed this right. Consequently, this project will investigate indoor sport hall and the procurement made by the architects for the physically disabled in the general public will be surveyed.

1.3 AIM AND OBJECTIVE

1.3.1 AIM

The aim of this research work will be to assess available indoor sport hall in an attempt to find out the essential facilities set up to help the physically disabled in accessing and the maximum utilization of space in an indoor sport hall of the building.

1.3.2 OBJECTIVES

i. to access the level of accessibility by the physically challenge in existing indoor sport hall;

ii. to highlight likely ways accessibility can be upgraded in existing Indoor Sport hall; and

iii. to propose a design for Indoor Sport hall, that is accessible to the physically challenge person.

1.4 SCOPE

The physically disabled in the general public are of various groups and their need in a building is dependent on the group they fall under. This research study will concentrate more on mobility impaired spectators and they include;

i.  People in wheelchairs who remain in their wheelchairs throughout the match.

ii.  People who arrive at the ground in a wheelchair and then transfer to a seat.

iii.  People who watch the event from their own special vehicle. Ambulant disabled spectators, who can walk either unaided, with difficulty or only with help.

1.5 JUSTIFICATION OF STUDY

According to a research done by W.H.O, 10 percent of the world populace live with one type of disabilities. It is subsequently fundamental for Indoor sport center to focus on the different need that will make such building readily accessible by the physically challenge. Sport serves as a medium of social association for man since he is a social being who has graving for collaboration with others in exchanging of ideas, thought sharing, express his emotions and to share information around a specific subject. To enhance such kind of relationship the existence of a facility that welcomes both people with or without disabilities is paramount. This research project will give one of such sport building. The project an Indoor sport hall will give an opportunity for people with or without physically disability to interact with each other using sport as a medium.

1.6 LIMITATION

The security situation in Nigeria specifically in the north, made data gathering during the course of the research difficult and impossible in some cases. In some facility access into the sport hall were strictly for staff members and only except in the event of sporting activity

1.7 CONTRIBUTION TO KNOWLEDGE

This research work will contribute to designer and facility manager knowledge in the range of giving universally acknowledged design guide line standards making Indoor sport hall available to everybody. It will likewise proffer arrangements that will make existing structures more available. 5

1.8 STUDY AREA

Kaduna State created by the then military head of state, Gen. Murtala Mohammed in 1975, with every single particular identity amalgamated into one state without a choice. The state subsequently is the successor of the old Northern Region of Nigeria, which had its capital at Kaduna which is currently the capital of the state with a population of around 6.3 million individual (Nigeria statistics figure, 2006). Kaduna state consists of twenty-three (23) Local Government Areas. They are: BirninGwari, Chikun, Giwa, Igabi, Ikara, Jaba, Jema'a, Kachia, Kaduna North, Kaduna South, Kagarko, Kajuru, Kaura, Kauru, Kebab, Kudan, Lere, Makarfi, SabonGari, Sanga, Soba, ZangonKataf, Zaria. Kaduna State lies on the 7°.45° East and longitude 10°.20° North. There are 57 ethnic group in Kaduna State. These groups include:

1. Adara (dubbed Kadara), 2. Akurmi (labelled Kurama by the Hausa), 3. Anghan (dubbed Kamanton by the Hausa), 4. Amo, 5. Aruruma (named Ruruma by the Hausa), 6. Atachaat (dubbed Kachechere), 7. Atyab (dubbed Kataf by the Hausa), 8. Atuku,9. Ayu, 10. Bajju, 11. Bakulu (Ikulu by the Hausa), 12. Bhazar (named Koro), 13. Bur (Sanga),14. Binawa, 15. Dingi, 16. Fantswam, 17. Fulfulde (Arrived around 1800s), 18. Gbagyi, 19. Gure, 20. Gwandara, 21. Gwong (Kagoma in Hausa), 22. Ham (dubbed Jaba in Hausa which is a derogatory name), 23. Hausa, 24. Jangi, 25. Kaibi, 26. Kahugu, 27. Kanufi, 28. Kigono, 29. Kinugu, 30. Kitimi, 31. Kiwafa, 32. Kiwollo, 33. Kono, 34. Kuvori (call Surubu), 35. Kuturmi, 36. Lemoro * not sure, 37. Mada (Mardan) Mada must have migrated during colonial rule, 38. Nandu, 39. Nduyah, 40. Numana, 41. Nindem, 42. Ningeshe, 43. Ninkyop, 44. Ninzo, 45. Nyenkpa (Yeskwa), 46. Oegworok, 47. Pikal, 48. Pitti, 49. Ribang, 50. Rishuwa, 51. Rumada, 52. Rumayya, 53. Shemawa, 54. Sholio (Dubbed Marwa), 55. Siyawa (Bauchi state?), 56. Takad, 57.Tarri, and 58. Tsam (Chawai) (Hayab,J.P. 2014 ongoing research). 

  DOWNLOAD THE COMPLETE PROJECT

DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN OF AN INDOOR SPORT HALL FOR THE PHYSICALLY DISABLED AND MAXIMUM UTILIZATION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!