Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 56  |  896 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT

 

CHAPTER ONE

1.0 INTRODUCTION

Material Procurement can be defined as the purchase of goods or services at a total cost of the optimum possible in the correct amount and quality of procurement. These goods and services are also purchased at the right time and location to express profit or the use of Government, business, business, or individuals by signing a contract.

The process of acquisition of goods or services that are required as a raw material (direct procurement) or for operating purposes (indirect procurement) a company or a person might call acquisition. The procurement process involves not only the purchase of commodities, but also the quality and quantity of controls. Typically, providers are listed and pre-determined by the contracting company. This makes the smoother process, the promotion of a good relationship between the buyer and the supplier.

The synonyms for procurement, which are the gain, purchase, and acquire, can shed light on the meaning of procurement. The procurement process may vary from company to company, and a Government entity can have a slightly different procurement process compared to a private company.

Acquisitions can also be defined simply as the procedure in which the goods or raw materials are purchased when prices are low. Procurement is advantageous if the goods are purchased in large quantities. E-procurement is another method of electronic media is used for the acquisition or purchase of goods. Everything is processed electronically, the search for the right bidder delivery and payment.

The procurement procedure may vary depending on the product and the uses of the product. Health team must be efficient and reliable, and the procurement process is carried out carefully in order prevent the defective equipment purchase. Another important factor that usually includes definitions of the procurement is the amount purchased the product. This is important because the quantity of purchased goods is inversely proportional to their cost. Thus, acquisition is a process that is carried out by the company almost every individual and for their own personal benefit or benefits, involving the purchase of commodities by choosing the appropriate provider.

1.1 Statement of the Problem

Most company’s are suffering some set backs due to their procurement system. Most often low quality goods are purchased and they end up loosing money. Also at times, they lack a steady supply, resulting to lack of materials for production, hence the need for computerization of bill of material processing system.

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERISED BILL OF MATERIAL PROCESSING PROJECT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!