Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM.

Format: MS WORD  |  Chapter: 1-5  |  Pages: 50  |  901 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM. (A CASE STUDY OF N.B.C PLC 9TH MILE CORNER NGWO)

 

ABSTRACT

This project is on design and implementation of a computerized office inventory system that is based on a system of valuation known as office system due to fluctuation of market price.  The project is also aimed at finding out how computer can be applied to office inventory system. The prevalent method of controlling inventory in most offices is manual method, which has a lot of set backs.  Such set back include tedious work, delay in transaction and time wastages in file assessment and accuracy of inventory record.  It is therefore of great importance to carry out this research aimed at finding out how computer can help to maintain efficient and accurate records of goods in stock, and also making updating easy, all at a fantastic speed. The information to this study is gotten through oral interview and record inspection of some offices. This enables one to get information about the old system and how the benefit the proposed system have over the one i.e. the cost benefit analysis matter.

 

CHAPTER ONE

INTRODUCTION

In an organization, it is very essential and need greater attention towards effort made to achieve and mandation an economic balance between the cost incurred and saved, by holding material in stock. This process can be obtained by ensuring that the acquisition, storage, handling and usage of raw material are fully controlled at all times.  This process is considered under the study of office inventory system which embraces, the total raw material to be used, work in progress and the stock counting of the finished goods. Inventory then means the measured amount of goods, which varies in quantity overtime in response to “demand” process, which operates to diminish the stock and an “repleshement” process, which operates to increase it. Due to fluctuating market prices of material in store, two system of valuation of issued of an inventory are adopted by most

Due to fluctuating market prices of material in store, two system of valuation of issued of an inventory are adopted by most organization periodic and office system, which was defined by new lexicon Webster dictionary as records maintained for a manufacturing  business so that, they show a continuous inventory of such items as raw materials and goods in process. For further  implementation of this study, reference will be made to offices when the problems faced with inventory management is proposed to be narrowed down with the aid of computer to make work easier and to achieve accurate results, when updating files and also assessment of files.

1.1   STATEMENT OF PROBLEM

Generally, in inventory system, some of the problem encountered in relation to office inventory system are considered in three stages.

(1) The planning stage in how the raw material needed for production are gotten, what kind of raw materials needed too. 

(2)  Production stage

(3) The finished goods product.  Before a product, the company or the organization encountered the problem of:

a) Seeking for the consent of the marketing manager of the company on how profitable the particular product to be produced is in the market.

b) Consumption pattern: This depends in the quality of the product, the quantity and the purchasing power.

c) Problem of working off-take, this is the estimated quantity of product to be produced at a given period in time problem.

d) Head – time problem.

e) Not providing a competent coverage for the raw materials ordered for.

f) Purchase of sub-standard materials, which could result to wastage and low quantity product, damaging of machine and will eventually affect the profitability of the organization.

g)  Having an unrealistic supplier.

(2) PROBLEM ASSOCIATED WITH THE PRODUCTION

(1) The percentage permulation of the product, it should not be determined by assumption.

(2) Individual mistake

(3) Not putting the shelf of the product into consideration

(3) PROBLEM ASSOCIATED WITH THE FUNISHED GOODS.

(1) The order level of the production or stock level or consumption.

(2) The price of the product:  It depends on the availability of capital and the opportunity to acquire item at low price.

(3) The risk of obsolenscence and determination.

(4) The cost of stage and space available.

(5) Insurance cost

(6) Government regulation

(7) Transport cost.

(8) Improper stock counting

1.2   THE PURPOSE OF THE STUDY

The purpose of this study is to minimize the numerous setback associated with manual system of inventory system.  These setbacks, tends to diminish the progress of many companies. This project also serves, as a motivator to many organizations or companies by exposing the greeter advantages computer can be if effectively implemented.  Furthermore no major categorization of staff activity exists in the inventory system. However to appreciate how system carries out this functions to meet it’s set objectives various activities that take place in the system are described below:-

1.  The pre-order activities

2.  The order activities

3.  The receiving and checking activities

4.  Storing and distribution

5.  File updating

6.  Accounting and report activities.    

1.3     OBJECTIVE OF THE STUDY

The main objective of  this study is to maintain adequate stick level of the product by ordering acquiring and issuing while avoiding stoppages and consequent and increase cost of emergency action. And also relieve the management of the organization taking decision for  every items carried in stock

1. Receive and process request for materials needed for the products.

2. Select relevant items needed for the product for ordering

3. Ensure that orders are dispatched for immediately after completion for prompt supply of items

4. Maintain a regular supply of raw materials of reasonable price and quantity and of a good quantity 

5. Ensure the follow up of ordered item when they are over due.

6. The take of necessary action on the arrival of ordered items

7. Prepare for payment of all items acquired by the company  

8. keep current  records of the event occurring within the system. 

9. Compile a continuous report of the activities carried out during the specified period.

10.  Ensure that the various unit including the production unit stock unit and  ware house receives the request on time.

1.4   THE SCOPE OF THE STUDY

In actual sense the scope of the problem of this study is narrowed down to ordering, stocking and delivering of the product out to customers and also the accounting and reporting of  expenditure for all ordered and delivering made so find it reasonable to have the research to office inventory on stock of goods.

1.6   DEFINITION OF TERMS

INVENTORY:- it mans the aggregate of those items of tangible personnel property which are:

Held for sale in the ordinary cause of business.

In process of production for such sale. To be errantly consumed in production of goods or services to be available for sale.

OFFICE INVENTORY:- A system of accounting for merchandise that provides a continuous record showing the Quantity and cost of all goods on hand. Also it is a carnival operation involving computing the theoretical balance after each issues of receipt

COVERAGE:- Frequently  used interchangeably with the word protection” or” insurance”. The extent the insurance afforded under an insurance contract.

ORDER:- A written instruction or commission to do something such as buy sell negotiate or supply.

COMPUTER:- Thisis an electronicsmechanical device that accepts input process it and relinquishes information at a fantastic rate.

UPDATING:- this is the process of adding and altering a master file so that it process a arrant status.

MINIMUM LEVEL:- it isotherwise called the buffer stock it is set by the rate of consumption recorder level and lead-in-time and at this point stock will not be allowed to fall.

MAXIMUM LEVEL:- this is the stock level which must not be exceeded at all time and it is determine by the rate of consumption reorder level and lead-in-time (delivering time)

LEAD-IN-TIME:-The time between when items are ordered and when they arrived and are available for us.

FILE:- A collection of related records

SHELF LIFE:- the duration a practical or production can stay before it expires

ECONOMIC ORDINARY QUALITY:- this is a calculated reorder quality which immunize the balance of cost between caring cost and ordinary cost.

PLANT:- A restricted sense building as the term “plant and equipment also machinery use for manufacturing process.

  DOWNLOAD THE FULL PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM.

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM. INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM.?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM.?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM., What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!