Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM IN STOCK PRODUCT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 60  |  1557 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ABSTRACT

The purpose of the study is to computerize quality control system in production (A case study of Anammco Nig. Ltd Enugu) and to develop a computer packages whereby the technique observed from the manual method can be improved on. It is a known feet that the manual method of quality control in production has been associated with lots of inaccuracy in quality control and this has lead to early break down of parts when in service. The software when developed will facility and enhanced the mode and methods of quality control in spare parts production of Anamco.

 

CHAPTER ONE

INTRODUCTION

A quality control system in production management is a qualitative technique with strong financial implications having direct relationships with production, marketing, purchasing and financial politics. Also, it is a system used in the management of stocks held by any organisation as it concern addition to, storage and removals from the trading stock with appropriates record keeping. ANAMMCO LTD, Enugu as an assembly plant maintains a large amount of stock vehicles spare parts which are imported from any of her vendors, Vce:- MBAG.  Mercedes Benz AG Germany, MBBRAS.  Mercedes – Benz Brazil or MBE – Mercedes.  Benz Espama for the production line or sales to distributors or authorized agents dealers.

The stock are held for various among which are:-(a) To ensure unit sufficient goods are available to meet anticipated demand.(b) To provide a better between production processes.This is, applicable to work in project stocks which effectively decouple operation. (c) To meet possible shortage in future (d) To absorb seasonal fluctuation in usage or demand. (e) To enable production process to flow smoothly and efficiently. (f) As a necessary part of the production process. All these are logical yet, stocks accumulate due to the Less promise worthy reasons which are:- (a) Obsolete items are retained in stock (b) Poor or non-existing inventory control resulting in over targe orders, replacement orders being out of phase with production etc. (c) Inadequate or non-existing stock records (d) Marketing departments. Whether as a deliberate policy or not, sticks, represents an investment by the organization.  

Thus, as with any other investment, the cost of holding stock most be related to the benefit to benefit to be gains.  To do this effectively the cost must be identified and this can be done in the three categories:-

(a) Cost of obtaining stock

(b) Stock out costs. 

All these spare parts which may how similar menu by description varies greatly among themselves depending on the type or model of vehicle using them.  Thus, the management and operation of stories function and the control of stock on only be performed in on efficient manner when there is an appropriate means of up turning and storing information and a facility for the analysis and use of this information. In the light of the above, ANAMMCO Ltd Enugu maintains a visible record system returned to as KARDEX, a manual form of inventory control system. As a prerequisite in any quality control system, ANAMMCO Ltd maintains a peculiar but unique coding system such that all the numerous spare parts are each uniquely coded and identified for accurate and specific information on them.

The operation of the KARDX was often prove to redundancy or duplication of items whenever there is instilling; it requires a lot of paper work with their possible variations or discrepancies during documentation; it involves, so many people thereby investing a lot of man hours; increased cost of procure storage of non-moving or obsolete items leads to customer dissatisfaction due to time wasting and unavailability of information.  Thus, the efficiency of the system is greatly dependent on human factor and as such accuracy. So, it is an attempt to rectify and modify the above inadquaciets that we have decided to develop and implement on integrated computerized stock control system so as to maximize the operation efficiency, ensure customer satisfaction based on quick. Services, minimize the non-hour requirement involved, reduce the running costs, guarantee accuracy and at the same time generate reports that assist management in her decision making as it concerns planning, organizing and controlling.   

1.2   BACKGROUND TO THE STUDY (MB-ANAMMCO LTD) ENUGU.

After the recommendation of the fourth (4th) National Development plan in 1975 to increase the number of automobile plants in Nigeria in order to address the problem of transportation, a Mercedes Benz Plant was chosen.  Other reasons for establishing the plant being to:

(a) Diversification and Rapid industrialization of the Nigeria Economy

(b) Modernization of industrial workers

(c) Indigenous man-power training

(d) Technology transfer and

(e) Manufacture and Assembly of Mercedes Benz commenced vehicles and trucks in Nigeria.  MB-ANAMMCO LTD, as it is famious by known and called means Mercedes-Benz Anambra motor manufacturing company limited Enugu.  This company is strategically located along IBB A port link Road Enugu Industrial Layout Enugu. The plant is a joint owned by the Government and people of the federal Republic of Nigeria and Daimier-Benz AG of Germany.  Their share equity is in the ratio 60% to Nigeria and 40% to Daimier, Benz AG Germany. Therefore Mercedes-Benz ANAMMCO LTD, Enugu was Licensed to manufacture Mercedes Benz commercial vehicles in Nigeria.

The company was incorporated in Nigeria as a private limited liability company on the 17th the day of January 1977.  On the 12th day of May 1978, it’s foundation store was laid by colonel John Atom Kpera the then military Governor of ANAMBRA States (Now, ENUGU and ANAMBRA STATE).  Later on the 8th day of June 1980, Mercedes-Benz ANAMMCO LTD, was commissioned by Alhaji Shehu Usman Aliyu Shagard, the them president Head of state and commander in client of the Nigeria Armed forces; ANAMMCO LTD, commenced production officially on January 1981.  Ever since them her services network is speed throughout Nigeria.  The company uses foreign and local contents in the manufacture of the Mercedes Benz commercial vehicles.

1.3   STATEMENT OF THE PROBLEM

It is a common knowledge that decision makers in any organization require information to perform the great functions of planning, producing and controlling.  Therefore, it is necessary to discover and adequate means of making the information available to every on concerned.  This is because, for decisions to be made correctly, the information must be consistent, accurate, timely and reliable. Thus, this work is aimed at developing and implementing an integrated computerized quality control system in production of an automobile firm (case study ANAMMCO LTD ENUGU NIGERIA). 

1.4   PROBLEMS OF THE STUDY

1.The encountered when carrying out this study are that obtaining necessary information from staff of Anammco was not easy because some of their information are regarded as company secret.

2. Production of spare parts on manual approaches has been very difficult.

3. There may be inadequate or non-existent stock records.

4. Obsolete items are retained in stock, which makes it difficult for one to know the overall items in stock.

5. Finally, problem of fund, the economy is bed, so to get money now is difficult.

1.5   THE PURPOSE OF THE STUDY

The objectives of this work inadequate the following:

1. To ensure appropriate stock quality control coding with a view to minimizing stock redundancy or duplication inherent in the manual system of quality control system in production.

2. To ensure operational efficiency thereby maximizing the customer services level with in level with I menaced accuracy.

3. To generate consistent, accurate timely and reliable reports that assist the management in her decisions as it affects the stock and the organization for effective pleasing, organizing and controlling.

1.6   SCOPE OF THE STUDY

Even though that Mercedes-Benz Anammco Ltd, is the case study with her divers inventories, this work is only continued to the administration of spare parts (finished good type of inventory) as it concerns ordering, Receipts, soles and Reports. Therefore it excludes the W-I-P work-in- progress) and other forms of quality stock control.  It also excludes other automobiles firms.

1.7   AIMS AND OBJECTIVES

The aims and objective of this work is that when, the system becomes operational it will.

1. Permit on-line-time data storage and information retrieval

2. Save the production time per section and as such ensure customer satisfaction   

3. Increase the operational efficiency and accuracy

4. Reduce stock redundancy or inherent in the manual system.

5. Generate consistent, Accurate, timely, and effective stock control towards profit making and

6. Reduce the operational costs

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM IN STOCK PRODUCT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM IN STOCK PRODUCT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM IN STOCK PRODUCT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM IN STOCK PRODUCT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM IN STOCK PRODUCT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!