Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF EXAMINATION TIMETABLING SOFTWARE USING GENERIC ALGORITHMS AND SIMULATED ANNEALING

Format: MS WORD  |  Chapter: 1-5  |  Pages: 70  |  1323 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

CHAPTER ONE

INTRODUCTION

1.1 General Overview          

The difficulties of developing appropriate examination time table for institutions and tertiary is increasing. Institutions are enrolling more students into wider variety of courses in many different fields. For example, at Osun State Polytechnic, Iree, approximately 14,000 students have to be filled into about 150 exams over two and a half week’s period. The examination timetable problem regards the scheduling for the exams of a set of polytechnic courses, avoiding overlaps of exams of courses having common students, and spreading the exams for the students as much as possible.          

Examination scheduling (timetabling) is a very important process in education institutions. The main challenge is to schedule examinations to timeslots and rooms over a specific period while satisfying a set of constraints. The previous attempts were based on the graph coloring concept. In this case the vertices represent causes, and join two vertices only if they cannot be scheduled at the same time. The problem is therefore to find the chromatic number of resulting graph. One of the major approaches in exam timetabling over the years has been constraint programming approach (Simulated Annealing). This method constraint programming logic language (chip) also to solve exam timetabling problem. Constraint programme phase provide an initial solution and a simulated annealing phase to improve the quality of solutions.          

The local search approaches play an important role in the exam timetabling literature. White and Xie and Di Gaspero and Schaef used tabu search method in exam timetabling. White and Xie Kept two table lists, the used short-term table list, and the long-term tabu lists keeps tracks of the most moved exams, Di Gaspero and Scheaf used a single table list, but when exams are added to this list, its for a randomly determined number of iterations. The polytechnic has two semesters per each academic year. Each semester per each academic year. Each semester is made up of up to fifteen weeks of teaching, by followed by two weeks of examination. There are two examination sessions per day except on Saturday where student are allowed to rest and start of Sabbath for seventh day Adventist. Examinations are mostly three hours long with a few exceptions which deviates for half an hour or two hours.          

There are an increasing number of courses which cut across facilities and polytechnics-wide courses which are offered to more than a thousands students at the same time. The problem is also complicated by the freedom of choices by students on optimal courses, where students have wide range of choices which cut across department and faculties. The Examination Timetable Problem (ETP) is usually modeled as an NP-Hard (non-deterministic polynomial time hard problem) combinatorial optimization problem. The problem demands that a given number of exams are scheduled in a limited number of periods and venues in such a way that no student will have more than one exam at a time and other constraint are satisfied.

Although consideration will be based in particular on exams timetabling, the ideas presented here can be extended to many other application, which include not only other scheduling problems but also multi-criteria problems. In general, the reason to present an application to exams time tabling is justified by the affiliation of the auditors and their awareness of the increased difficulty that some recent strategies have introduced in this academic task. Just as an example monitoring the tendency forwards the flexibility of curricular and the increase of the number of students enrolled in each course.  

1.2  Statement of the Problem          

In this project work, we present a new solution method for examination timetabling, consisting of two phase: a generic algorithm phase to improve provide an initial solution and a simulated annealing phase to improve the quality of solution. The simulated annealing applies kempe chain neighborhood and includes a mechanism that allow the user to define a certain period of time in which the algorithm should run. We perform preliminary experiments of the algorithm on the real data set from the OSUN STATE POLYTECHNIC, IREE. However, the main different between the two approach is that our simulated annealing phase is equipped with more refine mechanisms that help to determine crucial cooling schedule parameter.  

1.3    Aim and Objective of the Study          

The principle aim of this project aim of this project work is develop examination timetabling software that will be useful to our education institutions, using Generic Algorithms and simulated annealing.          

The following are the set objective

- Exploratory study of Generic Algorithm and simulated annealing in resolving conflicts associated with exam timetabling.

- Develop a computer software to automatically generate exam timetable using the two appropriate by considering Osun State Polytechnic exam time table data.

- To evaluate and compare the performance of  the two algorithms in term of their computational complexity.

1.4  Limitation of the Project

The project is developed to cover the fixing of examination timetables for all students in this institution of Osun State Polytechnic, Iree but it can be implemented in any other tertiary institution, this can be achieved by merely adjusting the input design of the program.  

1.5  Scope of the study          

In this project, attention is focused in formulating mathematical models for the examinations timetable at Osun State Polytechnic, Iree. This will act as a benchmark for testing  heuristic algorithms (describe an algorithm that modifies itself in response to the user) and help future reformations of the problem models. The Examination Timetabling Problems (ETP) differ considerably from the polytechnic curse scheduling problem.  

1.6  Significant of the project          

The significant of the research work is to assist to curb the examination timetable problems that may arise in the future, based on the following concussion and recommendation made by the researcher.  The finding of this study will enable us: To understand and the importance of good examination timetable system for the tertiary institution easy and effective also with the used of appropriate examination timetable tom stimulate the timetable of various resources combination so as to encourage  better timetable planning and information gathering. To minimize the length of examination period with the constraint given to used rate determine every student academic performance and also to allocate invigilator to time and venues. To give a technical knowledge and the competence of each student.

  DOWNLOAD THE FULL PROJECT

DESIGN AND IMPLEMENTATION OF EXAMINATION TIMETABLING SOFTWARE USING GENERIC ALGORITHMS AND SIMULATED ANNEALING

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF EXAMINATION TIMETABLING SOFTWARE USING GENERIC ALGORITHMS AND SIMULATED ANNEALING INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF EXAMINATION TIMETABLING SOFTWARE USING GENERIC ALGORITHMS AND SIMULATED ANNEALING?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF EXAMINATION TIMETABLING SOFTWARE USING GENERIC ALGORITHMS AND SIMULATED ANNEALING?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF EXAMINATION TIMETABLING SOFTWARE USING GENERIC ALGORITHMS AND SIMULATED ANNEALING, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!