Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA.

Format: MS WORD  |  Chapter: 1-5  |  Pages: 77  |  743 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA.

 

CHAPTER ONE

INTRODUCTION

1.1            BACKGROUND OF THE STUDY

The world is fast becoming a global village and a necessary tool for this process is communication of which telecommunication is a key player. The quantum development in the telecommunications industry all over the world is very rapid as one innovation replaces another in a matter of weeks. A major breakthrough is the wireless telephone system which comes in either fixed wireless telephone lines or the Global System of Mobile Communications (GSM). Communication without doubt is a major driver of any economy. Emerging trends in socio-economic growth shows a high premium being placed on information and communication technology (ICT) by homes, organizations, and nations.

Nigeria is not left out in this race for rapid development as the nation’s economy has been subjected to years of economic reversal via mismanagement and bad leadership. The Nigerian telecommunications sector was grossly underdeveloped before the sector was deregulated under the military regime of General Ibrahim Babangida in 1992 with the establishment of a regulatory body, the Nigerian Communication Commission (NCC). So far the NCC has issued various licenses to private telecommunications operator. These include 7 fixed telephony providers that have activated 90,000 lines, 35 Internet service providers with a customer base of about 17,000. Several VSAT service providers are in operation, and have improved financial intermediation by providing on-line banking services to most banks in Nigeria. These licenses allowed private telephone operators (PTOs), to roll out both fixed wireless telephone lines and analogue mobile phones. The return of democracy in 1999 paved the way for the granting of GSM license to 3 service providers: MTN Nigeria, ECONET Wireless Nigeria which is now called ZAIN and NITEL Plc which is now called ZOOM in 2001 and later GLO.

1.2     STATEMENT OF THE PROBLEM

It has been observed that calls across different networks are always difficult to connect, at times diverted and also attract more cost. This creates room for users to be confused as how much is deducted from their call credits or are compelled to having multiple GSM lines. As the network increases, more users makes call across different networks and there is need to record the call time, call network, and line identification and be able to put calls across the networks without much congestions.

Transmission of calls requires at least two points, A and B (point-to-point; point-to-multipoint or multipoint-to-point). Consequently, the interconnectivity problem within Nigeria is simply stated as follows:

1.     How can A and B, separated possibly by thousands of kilometers within Nigeria, transmit voice to each other without each having to be subscribers to the same operator?

2.     More importantly, how can we ensure multi-user resource allocation such that if A is the originating consumer, it does not matter technologically (even if financially) which of ALL the other operators that B is a subscriber to, nor does it matter what type of transmission he or she is sending?

3.     The transmission of calls with out much congestion in the network.

This will form the bases for the project work.

1.3     PURPOSE OF THE STUDY    

The purpose of this research work is to establish a transparent set of Interconnection Rules, which shall encompass at least the following requirements:

* Every operator must allow all other operators full interconnection to its network at technically feasible and convenient points of interconnection, such that traffic may originate on one network and terminate on another, or otherwise pass across networks, without interference, signal deterioration, delay, congestion, or restriction.

* To design software that will serve as a congestion control system for multi-user telecommunication networks.

1.4     SIGNIFICANCE OF THE STUDY

This study will help us to know the status of GSM network resource allocation in Nigeria with a view to knowing areas to be addressed for better performance. This research work will aid telecommunication companies in Nigeria to achieve the following:

1.                 Keep record of calls across the GSM networks.

2.                 Use Interswitch to put calls through to the right designation without delay, distortions or diversion.

3.                 Determine the calling network and receiving network and use this information for the purpose of interconnectivity tariffs.

4.                 Maintain a database of all registered GSM lines for all GSM communication companies.

1.5     AIMS AND OBJECTIVES OF THE STUDY

Basically the aim of this project work is to design and simulate a multi-user congestion control system for MTN.

1.6     SCOPE OF THE PROJECT

This research covers network connectivity and traffic control of MTN network in Nigeria. The system covers all forms of voice calls across the network. Both call identification, recording and network interconnectivity.

1.7     CONSTRAINTS AND LIMITATIONS

Some of the constraints encountered during this project design include the following:

·              Financial Constraints: The design was achieved but not without some financial involvements. One had to pay for the computer time. Also the typing and planning of the work has its own financial involvements.  However, to solve the problems I solicited fund from guardians and relations.

·              High programming Technique: The programming aspect of this project posed a lot of problematic bugs that took me some days to solve. Problems such as the ADO, DAO and Jet Engine related run time errors. For instance, the Ms Access office 2000 edition does not work with VB-6. Jet Engine unless converted to lower version of Ms ACCESS of office 1997 edition (i.e. version 2.0). Also other technical problem, which requires semantic and syntactic approaches where encountered as well. In seeking for the solution to these problems, I acquired more knowledge from well –versed textbooks and programmes.

·              The epileptic nature of power supply cannot be overlooked.  

1.8     DEFINITION OF TERMS

Inter-switch: Inter-Switch Link (ISL) is a trunking method developed by Cisco to use for Ethernet and Token Ring trunk connections.

Congestion: It is the overcrowding of route, leading to slow and inefficient flow. In computing, it is a situation in which the amount of information to be transferred is greater than the amount that the data communication path can carry.

Air interface: In a mobile phone network, the radio transmission path between the base station and the mobile terminal.

Asymmetric Transmission: Data transmissions where the traffic from the network to the subscriber is at a higher rate than the traffic from the subscriber to the network.

SIM: Subscriber Identity Module; A smart card containing the telephone number of the subscriber, encoded network identification details, the PIN and other user data such as the phone book. A user’s SIM card can be moved from phone to phone as it contains all the key information required to activate the phone.

Telecommunication: Are devices and systems that transmit electronic or optical signals across long distances. Telecommunication enables people around the world to contact one another to access information instantly, and to communicate from remote areas.

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA.

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA. INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA.?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA.?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF NETWORK CONNECTIVITY AND TRAFFIC CONTROL OF MTN NETWORK IN NIGERIA., What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!