Select Currency
Translate this page

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR

Format: MS WORD  |  Chapter: 1-5  |  Pages: 67  |  1392 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR

 

ABSTRACT

This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v regulated DC power supply unit forms the first block whose output is fed to priority encoder and decoder block. The output of the BCD – Decimal decoder is used to select the phase in priority through a transistor driver stage and electromagnetic relay that activates contactors. The least prioritized phase is the Gen set which contains a circuitry that automatically starts and stops the Gen set. The system is realized with TTL chips market. LEDs and AC panel lamps are used to indicate the status of the system while a manual switch is used to demonstrate the mode of operation of the system.

 

CHAPTER ONE

INTRODUCTION

1.1.  BACKGROUND OF THE STUDY

Industrial automation and control has contributed immensely to the high rate of the world’s technological growth. Power control and automation is a part of this field which is applied in virtually anywhere electrical power is used, generated or transmitted. Manual power change-over switches have been in existence and in different forms and shapes. 1959, the advent of microelectronics has paved way to modify the manually operated change-over switches. This project deals with the design and construction of automatic change-over switch with indicator. It eliminates the time and energy spent in operating the manual change – over and starting of Gen. Set. It is fully automated. It can be used in residential houses, offices and most importantly, in factories that required constant power supply. It has so many advantages over the existing ones/types.

This project work is embarked upon to eliminate nearly every shortcomings associated with the manually operated type to ensuring that it is fully automated. This system is realized in several functional blocks all combined to form one functional system. The first block is a 3-phase MAINS regulated dc power supply unit that powers the overall circuit and acts as the input. The output of thin block is fed into a priority encoder (74147) which selects the most prioritized phase at a time. The third block is a BCD – to – DECIMAL Decoder (7442) used to decode the prioritized phase.

The fourth is the driver stage which comprises of NPN transistor that energizes the electromagnetic relay which switches the phase in priority. The Gen set switching section is achieved using the least prioritized phase. This section switches ON the Gen set when all the NEPA phases are low, OFF or faulty. Once the Gen set phase is selected, a switching transistor fires an SCR which conducts large battering current to the ignition coil of the Gen set. Panel indicators are used to show the status of the system.

1.2. OBJECTIVES OF THE STUDY

The major objectives of this project is to design and construct an automatic change-over switch with Gen set switching facility capable of transferring control from MAINS to Gen set.

It is also aimed at equipping the graduating student with Hands – on experiences which is invaluable in their professional practice.

It is aimed at grounding the graduate of EEE in electronic system designs involving power control and automation using random/Hard wired logic.

Another objective of this project is to acquaint the graduating students on the ethics of Engineering, technical and scientific writing which is a nucleus of engineering professional practice.

1.3.  SIGNIFICANCE OF THE STUDY

This project work signifies a lot in Electrical power control and automation. It means a lot in EEE. This project is a design that has to be developed and funded for commercial purposes regarding its usefulness. This project eliminates the stress, time delay and other drawbacks in manually operated types. The project can be modified to display the phase in use at a particular time using a single seven segment Display and its appropriate circuitry. It also exposes the students to digital system designs involving Encoders & Decoders.

1.4.  SCOPE OF THE STUDY

This project work focuses on the design and construction of automatic change-over switch with Gen set switching facility. It covers the following; Encoders and Decoders, Relays/Contactors, 3 – phase regulated DC power supply unit, passive and active components, Generator switching mechanism and it x-rays the mode of calculation of the basic circuit parameter used in the design.

1.5.  PROJECT REPORT ORGANIZATION

This project report is presented in six chapters to appropriately illustrate the steps involved in its implementation.

Chapter One introduces the project overview, objectives and its significance. Chapter Two is basically the literature review and some theories relevant to the design. Chapter Three x–rays the methodology and analysis while Chapter Four covers the system design and description. Chapter Five elaborates on the implementation, testing and result. Finally, Chapter Six is about the summary of the entire theories and recommendation.

  DOWNLOAD THE FULL PROJECT

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!