Select Currency
Translate this page

DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N)

Format: MS WORD  |  Chapter: 1-5  |  Pages: 59  |  1594 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N)

 

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF STUDY

The project is designed for power supply applications. It involves automatic changeover between the main power supply and an auxiliary power supply, such as a generator. The circuit of the project consists of logical control unit and relay switches. The basic operation of the project is to switch ON an auxiliary power supply (like a generator). This operation connects the power supply from the generator to the load after a predetermined time interval. Switching is possible through the use of the relays. The system was designed to automatically change power supply back to the main supply moments after the A.C. mains are restored and to switch OFF the generator. The device removes the stress of manually switching ON the generator when power failure occurs. The operation allows electric current to flow through the motor/starter. It is noted that one of the motors terminals is already connected to 12V+ terminals. The switching of the relay allows the other terminal to be grounded thereby completing the circuit of the electric motor.(Hammed and Mohammed, 2006).

Power supply instability in developing countries creates a need for automation of electrical power generation or alternative sources of power to back up the utility supply. This automation becomes necessary as the rate of power outage becomes predominantly high. Most industries and commercial processes are partly dependent on generators and public power supply which is epileptic especially in tropical Africould countries where Nigeria forms a part.
However, if the starting of the generator is automatically done by a relay which switches the battery voltage to ignition coil of the generator while the main power relay switches the load to either public supply or generator, the down time would greatly be reduce thereby maintaining the tempo of production in such industries. The approach used in this work is the modular approach where the overall design is first broken into functional blocks. Each of these blocks carries out a specific function in the entire system by the interconnections between the block (Kolo, 2007).

Electricity (energy), which plays a major role in economic development of a nation, forms the basis of this study, with interests in human, infrastructural and economic development. In most developing and underdeveloped parts of the world, the supply of electricity for industrial, commercial and domestic use is highly unstable. This gives rise to the frequent use of alternative sources of power supply to meet up with the energy demands. The introduction of these alternative sources of supply brings forth the challenge of switching smoothly and timely between the mains supply and the alternative sources whenever there is a failure on the mains source. There is also the need to reduce drudgery from switching between the two sources on the human side. Solving these challenges forms the focus of this work. The Automatic Change-over switch, automatically switches over to the alternative source of power supply (generator) when there is a power outage. It equally switches over to the mains supply when power is restored and turns off the generator automatically. Therefore automatic power change-over switch is a

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N)

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N) INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N)?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N)?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N), What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!