Select Currency
Translate this page

DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  2494 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY

 

ABSTRACT

Proper management of thin oil rim reservoirs is required to maximize recovery and minimizes coning tendencies. The objective of this study is to determine the effect of reservoir and fluid properties on coning tendencies in thin oil rim reservoirs and to develop numerical correlations to predict oil recovery and water break through time for these reservoirs. Numerical correlations for the prediction of recovery and water breakthrough time using response surface methodology have been developed. The thin oil rim reservoir was represented using a generic simulation box model. Production rate, horizontal well length, oil viscosity, vertical landing of well from the gas-oil contact (GOC), vertical permeability and anisotropy ratio were varied and their effects on oil recovery, reservoir pressure, water cut and breakthrough time were studied. The results show that an increase in horizontal well length reduces the coning tendencies and improves recovery of oil. Increasing viscosity of oil (reducing oil mobility) increases the coning tendencies whilst reducing the productivity index of a well hence decreasing recovery. An increase in the horizontal well landing position from the gas-oil contact (GOC) results in an increase in water cut. An increase in vertical permeability and vertical anisotropy ratio both increases the coning tendencies in thin oil rim reservoirs. Correlations for the prediction of cumulative oil recovery and water breakthrough time were developed for reservoir and fluid properties and well configurations within specific ranges which can be used for reliable predictions. The major contribution of this work to knowledge is it presents a means of using experimental design and response surface methodology to develop reliable equations for generalized prediction of cumulative recovery and water breakthrough time in thin oil rim reservoirs without running simulation models when the required equipment and time is unavailable.

 

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

Coning is the result of high pressure gradient around the producing well which causes the oil-water contact to rise and the gas-oil contact to depress near the wellbore. Gravitational forces tend to segregate the fluids according to their densities. However, when gravitational forces are exceeded by the flowing pressures (viscous force), a cone of water and/or gas will be formed which will eventually penetrate the wellbore (Beveridge, 2010). Figure 1.1 is a schematic illustrating the phenomenon of water coning in a producing vertical well. This dynamic force due to wellbore drawdown causes the water at the bottom of the oil layer to rise to a certain point at which the dynamic force is balanced by the height of water beneath that point. As the lateral distance from the wellbore increases, the pressure drawdown and the upward dynamic forces decrease. Thus, the height of the balance point decreases as the distance from the well bore increases. Therefore, the locus of the balanced point is a stable cone shaped water oil interface. At this stable situation, oil flows above the interface while water remains stationary below the interface (Namani, 2017). This also applies to gas coning.

The extent of the cone and it stabilization depends on a lot of reservoir and fluid properties. A lot of correlations have been developed to predict the rate at which coning will occur for any conventional reservoir and the breakthrough time for a particular production rate. However, these correlations have their limitations due to assumptions made during their development which tends towards ideality rather than what is actually obtainable.

  DOWNLOAD THE COMPLETE PROJECT

DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DEVELOPMENT OF CONING CORRELATIONS FOR OIL RIM RESERVOIRS USING EXPERIMENTAL DESIGN AND RESPONSE SURFACE METHODOLOGY, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!