Select Currency
Translate this page

EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  2462 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX

 

ABSTRACT

A new method for analysing productivity index (PI) on vertical wells is the main objective of this study. Well performance is often measured in terms of the well’s productivity which is dependent on a number of factors such as the reservoir’s configuration, the type of completion, petrophysical and fluid properties, formation damage, etc. The effect of partial completion is the main focus of making the productivity index analysis since almost all vertical wells are partially completed due to the reasons of water coning or gas cap issue, etc. It is also very expensive to fully complete a well especially when the formation thickness is so large. Pressure behaviour solutions for both closed boundary and constant pressure boundary have been obtained, taking into consideration the effect of partial completion. Productivity of a well is usually evaluated on the long time performance behaviour, thus the pseudo-steady state (late time) approach has been employed for calculation of the productivity index. Several key factors have been tested on productivity index such as pseudo skin, shape factors, penetration ratio, reservoir drainage area and etc. The effects of these factors have been analysed on PI. Theoretical data were used in carrying out the analysis with results indicating that, productivity index increases with increasing completion interval and vice versa, whiles pressure drop due to skin as a result of restricted entry to fluid flow increases tremendously with decreasing completion interval. Shape factors of various well positions in bounded reservoirs were computed and compared with results obtained by Dietz, and Babu and Odeh.

 

CHAPTER ONE

INTRODUCTION

1.1         BACKGROUND OF THE STUDY

Well productivity is one of the major concerns in oil field development, and provides the means for oil field development strategy. Sometimes, well performance is measured in terms of productivity index. In order to arrive at the economic feasibility of drilling a well, petroleum engineers require proven and reliable methods to estimate the expected productivity of that well. Well productivity is often evaluated using the productivity index, defined as the production rate per unit pressure drawdown. Petroleum engineers often relate the well productivity evaluation to the long-time performance behaviour of a well, that is, the behaviour during pseudo-steady-state or/and steady-state flow of a closed system or/and constant pressure system respectively.

The long-term productivity of oil wells is influenced by many factors. Among these factors are petrophysical properties, fluid properties, degree of formation damage and/or stimulation, well geometry, well completions, number of fluid phases, and flow-velocity type (Darcy, non-Darcy) (Yildiz, 2013). Depending upon the type of wellbore completion configuration, it is possible to have radial, spherical or hemispherical flow near the wellbore. A well with a limited perforated interval (partial completion) could result in spherical flow in the vicinity of the perforations as depicted in fig. 2.1. A well which only partially penetrates the pay zone, could result in hemispherical flow. These conditions could arise where coning of bottom water or gas cap becomes a serious issue (Ahmed, 2015). Figures 3.1 and 3.2 respectively depict the true picture of radial and spherical flow behaviour in a partially completed vertical well.

Partial completion is the completion of or flow from less than the entire producing interval. This situation causes a near-well flow constriction that result in a positive skin effect in a well-test analysis. The net result of partial completion yields extra pressure drop in the near wellbore region and reduces the well productivity. The present analytical method of evaluating productivity index in vertical wells with partial completion does not account for the effect of pressure drop due to partial completion. The purpose of this study is to develop analytical model for evaluating productivity index (P.I) of vertical wells with partial completion, where the effect of pressure drop due to partial completion is taken into account and compare results with conventional methods. The partial differential equations were solved for both no-flow boundary and constant pressure boundary systems in Laplace and Fourier Transform domains before inversion to real time domain.

1.2     OBJECTIVES OF THE STUDY

The main objectives of this work are to:

1. Develop analytical model for pressure behaviour in closed and constant pressure boundary systems.

2. Develop an analytical model for evaluating productivity index of vertical wells with partial completion for both closed-boundary and constant pressure boundary systems taking into account the effect of pressure drop due to partial completion.

3. Calculate shape factors and compare with the existing ones and

4. Investigate the factors and parameters that influence or control productivity index.

  DOWNLOAD THE COMPLETE PROJECT

EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EFFECTS OF PARTIAL COMPLETION ON PRODUCTIVITY INDEX, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!